Sir William Logan Building Electric Vehicle Charging Station Modification

Modify existing EV charging stations in front of Sir William Logan Building, bases, sidewalks and curbs as required to meet code requirements. There are 4x plugs on 2 bases in the grass median of the lot that should be modified to have a concrete walking surface with access to both sides of the median. Both bases must be modified as needed to meet applicable accessibility requirements for height, access etc. 


Latest update

The assessment is in progress.

Participate

Key documents

Key documents
Document number Document title File Date
1 Sir William Logan Building Electric Vehicle Charging Station Modification - December 3, 2024

Contacts

Environment, Health and Safety
Public Services and Procurement Canada
11 Laurier Street
Portage III, Place du Portage
Gatineau, Quebec K1A 0S5
Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Sir William Logan Building (Ontario)
  • Nature of Activity

    • Other, not otherwise specified
  • Assessment Status

    In progress
  • Start Date

    2024-12-03
  • Proponent

    Public Service and Procurement Canada
  • Authorities

    • Natural Resources Canada
    • Public Services and Procurement Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    89092

Nearby assessments