Replace Pathway Lighting and Lighting Standards

To replace thirteen 150 watt high pressure sodium fixtures, poles, wiring and concrete bases for approximately 1000 feet, along the path behind 875 Heron Road leading to the back of the RA Centre. The project involves trenching for approximately 1000 feet at a depth of 0.55m to remove replace electrical cable, and digging to a depth of 1.8m to access and remove the concrete bases of lamp posts.
 


Latest update

March 1, 2022 – The authority issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - PSPC - March 1, 2022
1 Replace Pathway Lighting and Lighting Standards DOCX (14 KB) July 14, 2021

Contacts

Environment, Health and Safety
Public Services and Procurement Canada
2720 Riverside Drive
Ottawa, Ontario K1A 0M2
Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca


  • Location

    • 875 Heron Road (Ontario)
  • Nature of Activity

    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2021-07-14
  • Proponent

    PSPC
  • Authorities

    • Public Services and Procurement Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    82786