Carling Campus Accessibility Improvements

A study was completed in Fiscal Year 2019/2020 to review the accessibility across the Carling Campus. The study identified several items that need attention to bring the accessibility standards for the parking and land asset up to code. The deficiencies identified during the study include, but are not limited to, width of the accessible parking spaces and side access aisle, absence of accessible pavement markings and signage, widening of existing walking paths, repairing uneven surfaces, addition of additional Tactile Walking Surface Indicators (TWSI's) etc.

In addition to rectifying the deficiencies, this project will aim to install a voice intercom system at various locations across the parking lots within 30m of an accessible parking space to follow best practice standards. The intention of the projects is to ensure a consistent approach to accessibility across the campus.

This work is not anticipated to include the alteration or relocation of any vegetation, trees (aside from routine pruning), storm water management ponds or impact species, wildlife or their habitats which may be found at the Campus.

Description of General Project Activities:

A general contractor will be performing, but not limited to, the following activities to rectify the above issues:

  • Removal/installation of concrete as required to correct slopes, repair existing cracks or depressed areas,
  • Remove and replace broken pavers on pathways,
  • Installation of TWSI's to create a clear accessible path through the campus.  TWSI's help with identification of hazards for person's with visual impairments etc.,
  • Installation of voice intercom systems,
  • Removal of uneven asphalt pathways and replacement with concrete,
  • Tree pruning by a certified arborist,
  • Edging/cut-back of overgrown vegetation protruding on walking paths, benches etc.
  • Pouring of concrete to create safety ledge around the reflecting pools,
  • Installation of roadway signs,
  • Installation of crosswalk markings at select intersections/pathways,
  • Mixing concrete, and
  • Removal and repainting of parking lot lines.

Project activities are expected to be performed by personnel using a combination of hand-held non-powered tools, hand-held power tools such as small electric, gas or pneumatic operated tools (quick cut concrete saw, chipping tools, edger etc.) along with small mechanized vehicles such as small trucks, skid-steer loaders etc. 

More


Latest update

August 25, 2022– The authorities issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - Carling Campus Accessibility Improvements - August 25, 2022
1 Carling Campus Accessibility Improvements DOCX (15 KB) April 19, 2021

Contacts

Environment, Health and Safety
Public Services and Procurement Canada
2720 Riverside Drive
Ottawa, Ontario K1A 0M2
Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca


  • Location

    • Carling Campus (Ontario)
  • Nature of Activity

    • Maintenance activities (fences, walls)
  • Assessment Status

    Completed
  • Start Date

    2021-04-19
  • Proponent

    PSPC
  • Authorities

    • National Capital Commission
    • Public Services and Procurement Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    81543
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: