CPC West Parking Lots & Roadway Replacement - Phase 5 and 6

The project scope involves design services, construction drawings and construction administration services related to Parking Lots, Walkways and Roadway replacement at the RCMP Campus - 1 Sandridge Rd. Ottawa, Ontario. Complete removal of existing asphalt pavement roadway and walkway, and removal of concrete curbs. Full reinstatement of the asphalt pavement roadway and walkway surfaces, new Granular A and Granular B to required levels, new catch basins and the reinstatement of all concrete curbs, as required.           


Latest update

October 16 2025 - The Royal Canadian Mounted Police issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
2 Notice of Determination: CPC Paving - October 16, 2025

Contacts

Royal Canadian Mounted Police
Iain Melvin, Manager, National Environmental Policy Central
Dartmouth, Nova Scotia B2V 1P9
Telephone: 902-221-2429
Email: iain.melvin@rcmp-grc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Ottawa (Ontario)
  • Nature of Activity

    • Highways and Roads
  • Assessment Status

    Completed
  • Start Date

    2022-03-21
  • Proponent

    Royal Canadian Mounted Police
  • Authorities

    • Royal Canadian Mounted Police
  • Assessment Type

    Project on federal lands
  • Reference Number

    83252

Nearby assessments

...within 200 kilometres
Date modified: