Joyceville Institution - Fire Protection System Upgrade

Correctional Service Canada (CSC) intends to install a new pumphouse, install new domestic water pipelines, install a water reservoir and upgrade the fire pump and fire water mains for Joyceville Institution. All CSC buildings south of Highway 15 will be connected to potable water. The proposed location of the new pumphouse and reservoirs is adjacent to CORCAN warehousing on the south side of Highway 15.

The project will include decommissioning of drinking water wells and geo-technical sampling to characterize the soils. Telecommunication lines will be pulled through installed underground conduit.


Latest update

October 09, 2024 – The public comment period on the project is closed. The Correctional Service Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
1 Notice of Intent to Make a Determination - Start of Public Comment Period - September 9, 2024

Contacts

Environmental Protection and Sustainable Development
340 Laurier Ave W
Ottawa, Ontario K1A 0P9
Email: NHQ.Impact.Assessment.Act-Loi.sur.lEvaluation.dImpact.AC@csc-scc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Joyceville Institution (Ontario)
  • Nature of Activity

    • Other, not otherwise specified
  • Assessment Status

    In progress
  • Start Date

    2024-09-09
  • Proponent

    Correctional Service Canada
  • Authorities

    • Correctional Service Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    88883

Nearby assessments

...within 200 kilometres
Date modified: