Marine yard development

The proposed project

Peter Kiewit Sons ULC proposes to expand and enhance their marine yard located on the Fraser River at 1950 Brigantine Drive, Coquitlam to better serve their regional projects and maintain its Canadian fleet of marine vessels.

The Project would include:

  • Removal of approximately 100 existing timber and steel piles, with potential for additional pile removal as necessary (i.e. piles previously cut at the mudline etc.)
  • Dredging approximately 220,000 cubic metres of sediment over an area of approximately 71,230 square metres
  • Excavating and infilling to expand the existing yard by approximately 7,420 square metres of which 4,400 square metres are below the high-water level and including approximately 2,555 square metres of riprap
  • Replacement and installation of new stormwater infrastructure within both the existing and infill areas, incorporating stormwater pollution prevention measures
  • Installation of three pile-supported marine structures and associated mooring fixtures, for loading and unloading marine equipment, construction materials, maintenance and disposal at sea material
  • Installation of approximately 18 mooring dolphins
  • Foreshore restoration and riparian planting of an area of approximately 2,170 square metres
  • Installation of floating debris booms to prevent debris build up in restoration areas
  • Creation of approximately 5,215 square metres of intertidal marsh bench habitat to offset project impacts
  • Associated works and installations, including but not limited to, grading and paving, lighting, truck wheel wash, concrete barriers and utility infrastructure

Dredged material would be transported for disposal at an approved disposal at sea site under a valid Disposal at Sea permit per the Canadian Environmental Protection Act.

Dredging as well as some shoreline works would be performed outside of regular construction hours due to tidal fluctuations. Other construction activities would occur during standard construction hours, Monday to Saturday, 7:00 am to 8:00 pm.

More


Latest update

Notice of Determination

Coquitlam, B.C. – June 27, 2025 – The Vancouver Fraser Port Authority, Environment and Climate Change Canada, Transport Canada, and Fisheries and Oceans Canada have determined that the proposed marine yard development located at 1950 Brigantine Drive, Coquitlam, BC is not likely to cause significant adverse environmental effects.

.

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Marine yard development (British Columbia)
  • Nature of Activity

    • Building and Property Development
    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2025-02-28
  • Proponent

    Peter Kiewit Sons ULC
  • Authorities

    • Environment and Climate Change Canada
    • Fisheries and Oceans Canada
    • Transport Canada
    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    89331

Nearby assessments

...within 200 kilometres
Date modified: