Irish Creek/Head of the Lake Water System Upgrades
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The main Okanagan Indian Band (OKIB) community is situated on the shores surrounding the northern most arm of Okanagan lake and within IR #1. OKIB is currently conducting a Water Source Feasibility Study for the Irish Creek/ HOL water system to investigate various options to improve water quality and assess the viability of the different options for water source, treatment, storage and distribution for the community water system. The general approach is outlined below.
Water supply & treatment from Six Mile/Bradley Creek water system .
• Interconnected reservoir storage/fire protection.
• Abandon existing Irish Creek/ HOL wells.
• Water supply & treatment from Six Mile/Bradley Creek water system.
• Interconnect Area watermain and potential booster station.
• Reservoirs at each system for fire flow.
The entire system will be constructed within OKIB's IR #1 and the Ministry of Transportation and Infrastructure's road ROW.
Latest update
Participate
Contacts
Indigenous Services CanadaRachelle Ormond, Senior Engineer
Suite 600, 1138 Melville St
Vancouver, British Columbia V6E 4S3
Telephone: 604-363-0081
Email: rachelle.ormond3@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Okanagan Indian Band IR1 (British Columbia)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2021-09-16 -
Proponent
Okanagan Indian Band -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83009
Nearby assessments
...within 200 kilometres-
Head of the Lake Subdivision
Vernon -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
New Fibre Installation
Okanagan -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
Timixw Mixed Use Development
Vernon, BC -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
New Fibre Installation
Project site 2: Salmon River -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
Timber harvesting on Salmon River 1
Salmon River 1 -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
New Fibre Installation
Project site 1: Enderby 2 -
New Fibre Installation
Project Site 5: ENDERBY 2 -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Affordable Housing Units
Adams Lake Indian Band -
New Fibre Installation
Project Site 6: SWITSEMALPH -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Ajax Mine Project
Kamloops -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
North Thompson Rail Terminal Development Project
Kamloops -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Summerland Chemical Storage Building Project
Summerland -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
New Fibre Installation
Project Site 10: Kamloops 4 -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
New Fibre Installation
Project Site 06: Louis Creek 4 -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
Parking Lot repave
301 3rd Street West, Revelstoke -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
New Fibre Installation
Project Site 08: North Thompson 1 -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
New Fibre Installation
Nooaitch -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
New Fibre Installation
Coldwater -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Princeton Detachment Replacement
Princeton -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Harper Creek Mine Project
Vavenby -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
Ruddock Creek Mine Project
Avola -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Speyum Creek Watercourse Restoration
Speyum Creek -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Hazard Spruce Tree Removal
Glacier National Park -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Record Ridge Mine Project
7 kilometres southwest of Rossland -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
Paterson Port of Entry Redevelopment
Paterson Port of Entry -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Marine yard development
Marine yard development -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation