Pacific Coast Terminals are proposing to remediate approximately 170 metres of shoreline, consisting of:

  • Removal of existing debris, rip rap, and select trees, where necessary
  • Installation of a cast in place concrete retailing wall along an existing wooden dock base to provide structural stability and prevent erosion
  • Placement of rip rap with a 1.5:1 slope beneath the existing dock and along the rest of the shoreline
  • Any other miscellaneous activities

The works are anticipated to take approximately 8 weeks to complete. To conduct works in the dry (low tide) works may need to take place outside the port.


Latest update

Notice of determination

Port Moody, B.C. – October 18, 2024 – The Vancouver Fraser Port Authority has determined that the proposed berth 1 foreshore remediation - PCT located at 2300 Columbia Street, Port Moody, is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
2 Berth 1 foreshore remediation - PCT - October 18, 2024
1 Berth 1 foreshore remediation - PCT - July 17, 2024

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Berth 1 foreshore remediation - PCT (British Columbia)
  • Nature of Activity

    • Ports and Harbours
    • Maintenance activities (fences, walls)
  • Assessment Status

    Completed
  • Start Date

    2024-07-17
  • Proponent

    Pacific Coast Terminals Co.
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    88731

Nearby assessments

...within 200 kilometres
Date modified: