Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Canadian Wildlife Service is proposing to undertake the decommissioning and replacement of an existing boardwalk within the Vaseux-Bighorn National Wildlife Area. The Vaseux-Bighorn National Wildlife Area is one of 10 national wildlife areas identified under the Connecting Canadians to Nature initiative that supports connecting Canadians to the natural world.
The scope of the project includes removing the existing 292 m2 boardwalk and replacing it with a new boardwalk within the existing orientation and route. The proposed scope of work includes, removal of the existing boardwalk, Helical pile foundations and heavy timber boardwalk construction.
The proposed work will be completed during the late fall/winter and during a period when disturbance to migratory birds and other wildlife will be minimal. The works will be kept to the existing footprint and matting will be placed under equipment to minimize ground disturbance. All noticeable construction impacts (e.g. ruts, holes, depressions, compacted areas) will be appropriately re-graded, backfilled with topsoil, re-contoured and capped in preparation for restoration. Exposed soil will be stabilized and/or re-seeded using appropriate native plants, soils, seed mix and seed application at the completion of construction.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Determination - Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area | - | January 18, 2021 |
Contacts
Protected Areas, Pacific RegionEnvironment and Climate Change Canada
Ailish Murphy, Unit Head, Protected Areas, Pacific Region
Pacific Wildlife Research Centre
5421 Robertson Road
Delta, British Columbia V4K 3Y3
Telephone: 778-668-4694
Email: ailish.murphy@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Vaseux-Bighorn National Wildlife Area (British Columbia)
-
Nature of Activity
- Recreation and Tourism
-
Assessment Status
In progress -
Start Date
2020-10-21 -
Proponent
Canadian Wildlife Service -
Authorities
- Environment and Climate Change Canada
-
Assessment Type
Project on federal lands -
Reference Number
81091
Nearby assessments
...within 200 kilometres-
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Summerland Chemical Storage Building Project
Summerland -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Princeton Detachment Replacement
Princeton -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Timixw Mixed Use Development
Vernon, BC -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Head of the Lake Subdivision
Vernon -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Record Ridge Mine Project
7 kilometres southwest of Rossland -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
New Fibre Installation
Okanagan -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
Paterson Port of Entry Redevelopment
Paterson Port of Entry -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
New Fibre Installation
Coldwater -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
New Fibre Installation
Project site 2: Salmon River -
Timber harvesting on Salmon River 1
Salmon River 1 -
Marine yard development
Marine yard development -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
New Fibre Installation
Project site 1: Enderby 2 -
New Fibre Installation
Project Site 5: ENDERBY 2 -
New Fibre Installation
Nooaitch -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane -
Debris Deflector Installation
Debris Deflector Installation -
Annacis Water Main No. 2 Scour Protection project
Annacis Water Main No. 2 Scour Protection project -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Vito Shipyards Wharf Repairs - Extension to the Expiry Date - Public comments invited
Vito Shipyards Wharf Repairs - Extension to the Expiry Date -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
Peters First Nation Phase 3 Erosion Mitigation
Peters First Nation -
Peters First Nation - Fraser River Flood Control Berm
Peters First Nation, British Columbia -
Peters Island Flood and Erosion Mitigation
Peters First Nation - Peters 2 -
Peters First Nation Gravel Pit Activation
Peters IR 1 -
Affordable Housing Units
Adams Lake Indian Band -
Speyum Creek Watercourse Restoration
Speyum Creek -
Sunrise Expansion Program
Reserve - Seabird Island Band -
New Fibre Installation
Project Site 09: PopKum 1 -
Seabird Island Indian Band - Seabird Island Community and Cultural Centre
Seabird Island Indian Band - Seabird Island Community and Cultural Centre -
New Fibre Installation
Project Site 6: SWITSEMALPH -
Sunrise Expansion Program
Reserve - Cheam First Nation -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Ajax Mine Project
Kamloops -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
New Fibre Installation
TteS West Tkemlups -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
New Fibre Installation
Project Site 03: Cheam 1 -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
New Fibre Installation
Project Site 01:Schelowat 1 -
North Thompson Rail Terminal Development Project
Kamloops -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Skowkale / Yakweakwioose; Subdivision Preloading
08059 -YAKWEAKWIOOSE 12 -
Yakweakwioose First Nation Stormwater Outfall
Yakweakwioose 12 I.R. -
Stormwater Outflow into Chilliwack Creek
Skowkale 10.1.R. -
Skowkale / Yakweakwioose; Subdivision Preloading
08049 - SKOWKALE10 -
SAY Community Centre
Skowkale No. 10 Reserve Land -
Kwìkwèxwelhp Healing Village - Access Road Repair and Re-grading
Kwìkwèxwelhp Healing Village -
Bivouac Site, OPSEE Training Area
OPSEE Training Area, Vance road, Cultus Lake -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
New Fibre Installation
Project Site 05: Tzeachten 13 -
Ashwell Road Development Project
Ashwell Road, Chilliwack, BC -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
New Fibre Installation
Project Site 04: Soowahlie 14 -
PRTC Temporary Training Shelter
Chilliwack -
Cedarbrook Housing Development Project
Skway Indian Reserve No.5 (Shxwhá:y Village), Chilliwack, BC -
Sq'éwlets Cultural and Recreational Multi-use Trail Project
Squawkum Creek No.3 -
Chilliwack Creek Stormwater Outfall Installation
Chilliwack -
Aitchelitz First Nation Stormwater Outfall
Aitchelitz First Nation -
Aitchelitz Subdivision and Community Infrastructure Upgrades
Aitchelitz -
Road Realignment and Culvert Installation - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Sediment Removal at Hope Slough, Chilliwack
Hope Slough, Chilliwack -
Cultus Lake Septic Upgrade Project
Cultus Lake Laboratory -
Ministry of Transportation and Infrastructure - Culvert Replacement Columbia Valley Road
The Cultus Lake Laboratory -
Sq'ewlets - Squawkum Creek IR#3 Water System Upgrade
Squawkum Creek IR#3 -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Nicomen Dike upgrade - Skumulsph IR 16
Athey Road, Nicomen Dike, Skumulsph IR 16 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Deroche Creek Long Term Solutions
Deroche Creek -
Deroche Creek Realignment and Sediment Removal
Deroche -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Sumas IR6 Former Brick Plan Demolition and Remediation
Sumas First Nation Indian Reserve 6 -
Construction of two buildings on Sumas First Nation Land, Abbotsford
Sumas First Nation, Abbotsford -
New Fibre Installation
Project Site 10: Kamloops 4 -
Access Route and Drill Pad Construction at Inch Creek Hatchery
Inch Creek Hatchery -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Douglas First Nation - Douglas IR# 8 Lot# 30 and 31 Development
Douglas IR#8 (08013) -
Xa'xtsa (Douglas First Nation) Wastewater and Sludge Management
Douglas IR#8 (08013)