Neptune - Rail Bypass Track Layout

Neptune Bulk Terminals Canada Ltd. (the Applicant) is proposing to upgrade existing rail lines on their terminal located at 1001 Low Level Road, North Vancouver. The project consists of modifying, extending, replacing, or installing approximately 4,219 metres of railway track. Works are proposed Monday to Saturday, excluding Statutory Holidays, for 24 hours a day. This will allow works to be completed outside regular rail schedules. Construction activities include minor excavation and fill to bring new and modified railways tracks to the specified elevations.


Latest update

March 24, 2020 - The assessment decision statement has been issued to the proponent.

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Neptune - Rail Bypass Track Layout (British Columbia)
  • Nature of Activity

    • Railways
  • Assessment Status

    Completed
  • Start Date

    2019-11-19
  • Proponent

    Neptune Bulk Terminals Canada Ltd.
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80322