Columbia Containers Shoreline Protection Repair

Vancouver Fraser Port Authority, (the Applicant) is proposing to conduct repairs to approximately 600 metres of existing shoreline protection infrastructure along the foreshore of the leased property at 2319 Commissioner Street, Vancouver, B.C. The project consists of the removal and disposal of woody and other organic debris and concrete slabs, salvage of existing rip rap, and import of new materials to the site. The Applicant proposes to place armour rock, filter rock and gravel over geotextile fabric to restore the existing shoreline protection infrastructure.

The shoreline protection repair works are proposed to be completed in sections of 5-10 metres width that can be completed in a single shift to prevent exposure of unprotected slopes to water and waves. A silt curtain is proposed to be deployed to contain suspended solids along the sections of shoreline under active construction. The work is proposed to be done during low tide conditions, such that all works will be completed in the dry to the extent possible. Works are proposed to be conducted primarily with marine-based equipment with limited upland works, based on logistics for access, minimizing disruptions to the tenant, and tide height. Marine-based equipment would include a materials barge and barge mounted crane for placing filter and armour rocks, and tugs to assist in barge movement. Land-based construction equipment would include a crane or an excavator and a front-end loader for placement of rocks. Marine based equipment is proposed to be staged on a floating barge adjacent to the shoreline and land-based equipment would be staged from the top of the bank in sequence to the marine-based work. Works are expected to be completed in shifts which may extended beyond regular port authority construction hours and include nighttime works in order to complete works at low tide.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

End of Public Comment Period

The public comment period on the project is closed. The Vancouver Fraser Port Authority is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

List all records

Contacts

  • Project and Environmental Review
  • 100 The Pointe, 999 Canada Place
  • Vancouver, BC, V6C 3T4
  • Email: per@portvancouver.com

  • Location

    • Columbia Containers Shoreline Protection Repair (British Columbia)
  • Project Type

    • Ports and Harbours
    • Maintenance activities (fences, walls)
  • Status

    In progress
  • Start Date

    2020-07-06
  • Proponent

    Vancouver Fraser Port Authority
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80824