Okanagan Indian Band Business Park Phase 1
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Phase 1 of the Business Park infrastructure development to support future commercial and light industrial uses. Infrastructure development includes installation of servicing, earthworks and grading, and the construction and improvement of roads to support Phase 1 (Parcels 1, 2, 3, 4, and 5).
Latest update
Okanagan Indian Band Business Park Phase 1 Infrastructure Development
[February 12, 2020] – Indigenous Services Canada has determined that the proposed Okanagan Indian Band Business Park Phase 1 Infrastructure Development is not likely to cause significant adverse environmental effects.
The determination was based on a consideration of the following factors:
- impacts on rights of Indigenous peoples;
- Indigenous knowledge;
- community knowledge;
- comments received from the public; and
- mitigation measures.
Implementation of mitigation measures as outlined in the Mitigation Table attached to the Environmental Review, and environmental terms and conditions of funding are required for the project to address potential adverse environmental effects.
Indigenous Services Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects. Therefore, Indigenous Services Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
.
Participate
Contacts
Lee-Ann Hamilton, Senior Environmental Specialist1138 Melville Street, Suite 600
Vancouver, British Columbia V6E 4S3
Email: Lee-Ann.Hamilton@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 (British Columbia)
-
Nature of Activity
- Building and Property Development
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2020-02-28 -
Proponent
Okanagan Indian Band -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80438
Nearby assessments
...within 200 kilometres-
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Timixw Mixed Use Development
Vernon, BC -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Head of the Lake Subdivision
Vernon -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
New Fibre Installation
Okanagan -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
New Fibre Installation
Project site 2: Salmon River -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Summerland Chemical Storage Building Project
Summerland -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Timber harvesting on Salmon River 1
Salmon River 1 -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
New Fibre Installation
Project site 1: Enderby 2 -
New Fibre Installation
Project Site 5: ENDERBY 2 -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
Affordable Housing Units
Adams Lake Indian Band -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
New Fibre Installation
Project Site 6: SWITSEMALPH -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
Ajax Mine Project
Kamloops -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
Princeton Detachment Replacement
Princeton -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
North Thompson Rail Terminal Development Project
Kamloops -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
New Fibre Installation
Coldwater -
New Fibre Installation
Nooaitch -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
New Fibre Installation
Project Site 10: Kamloops 4 -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
New Fibre Installation
Project Site 06: Louis Creek 4 -
Parking Lot repave
301 3rd Street West, Revelstoke -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Speyum Creek Watercourse Restoration
Speyum Creek -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
New Fibre Installation
Project Site 08: North Thompson 1 -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Record Ridge Mine Project
7 kilometres southwest of Rossland -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Paterson Port of Entry Redevelopment
Paterson Port of Entry -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Marine yard development
Marine yard development -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane -
Harper Creek Mine Project
Vavenby -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Peters First Nation Phase 3 Erosion Mitigation
Peters First Nation -
Debris Deflector Installation
Debris Deflector Installation -
Peters First Nation - Fraser River Flood Control Berm
Peters First Nation, British Columbia -
Peters Island Flood and Erosion Mitigation
Peters First Nation - Peters 2 -
Annacis Water Main No. 2 Scour Protection project
Annacis Water Main No. 2 Scour Protection project -
Peters First Nation Gravel Pit Activation
Peters IR 1 -
Sunrise Expansion Program
Reserve - Seabird Island Band -
Vito Shipyards Wharf Repairs - Extension to the Expiry Date - Public comments invited
Vito Shipyards Wharf Repairs - Extension to the Expiry Date -
Seabird Island Indian Band - Seabird Island Community and Cultural Centre
Seabird Island Indian Band - Seabird Island Community and Cultural Centre -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Sunrise Expansion Program
Reserve - Cheam First Nation -
New Fibre Installation
Project Site 09: PopKum 1 -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Hazard Spruce Tree Removal
Glacier National Park -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
New Fibre Installation
Project Site 03: Cheam 1 -
Ruddock Creek Mine Project
Avola -
New Fibre Installation
Project Site 01:Schelowat 1