TELUS Cell Tower Cable Upgrade
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Eng. Network 2786021 VERN Mobility Site 2032 1100 Mission Rd
TELUS has an existing lead that extends from Commonage Rd, straight up the hill to the existing Cell Tower located at the top of the hill overlooking the Vernon Military Camp. TELUS would like to lash a new Fiber Optic cable to the existing Copper cables connecting Commonage Road to the Cell tower. Over the last few decades the existing lead has been overgrown by the local foliage and the lead is now not accessible. TELUS would like to brush away the new growth exposing the existing lead and lash the new cable to said lead. At the bottom of the hill, BC Hydro has renewed one pole as the old one is rotten, TELUS would like to transfer the existing lead to the new pole and remove the old pole from disposal.
Latest update
September 3, 2020— The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination - TELUS Cell Tower Cable Upgrade, Vernon British Columbia | - | September 2, 2020 |
Contacts
Geordon LloydTELUS
Geordon Lloyd, TELUS Construction Manager
1875 ETCH
Kamloops, British Columbia V2C 3Z8
Telephone: 250-318-2368
Email: Geordon.lloyd@TELUS.com
Prajit Biswas
TELUS
Prajit Biswas, Project Manager
(7fr) 3777 Kingsway
Burnaby, British Columbia V5H 3Z7
Telephone: 604-700-0020
Email: Prajit.Biswas@TELUS.com
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- 1100 Mission Rd, Vernon (British Columbia)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2020-07-22 -
Proponent
TELUS -
Authorities
- Department of National Defence
-
Assessment Type
Project on federal lands -
Reference Number
80862
Nearby assessments
...within 200 kilometres-
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Timixw Mixed Use Development
Vernon, BC -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Head of the Lake Subdivision
Vernon -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
New Fibre Installation
Okanagan -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
New Fibre Installation
Project site 2: Salmon River -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
Timber harvesting on Salmon River 1
Salmon River 1 -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
New Fibre Installation
Project site 1: Enderby 2 -
New Fibre Installation
Project Site 5: ENDERBY 2 -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Affordable Housing Units
Adams Lake Indian Band -
New Fibre Installation
Project Site 6: SWITSEMALPH -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Summerland Chemical Storage Building Project
Summerland -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Ajax Mine Project
Kamloops -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
North Thompson Rail Terminal Development Project
Kamloops -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
New Fibre Installation
Project Site 10: Kamloops 4 -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Parking Lot repave
301 3rd Street West, Revelstoke -
New Fibre Installation
Project Site 06: Louis Creek 4 -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
New Fibre Installation
Coldwater -
Princeton Detachment Replacement
Princeton -
New Fibre Installation
Nooaitch -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
New Fibre Installation
Project Site 08: North Thompson 1 -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
Harper Creek Mine Project
Vavenby -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Speyum Creek Watercourse Restoration
Speyum Creek -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Record Ridge Mine Project
7 kilometres southwest of Rossland -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Hazard Spruce Tree Removal
Glacier National Park -
Ruddock Creek Mine Project
Avola -
Paterson Port of Entry Redevelopment
Paterson Port of Entry -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Marine yard development
Marine yard development -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Peters First Nation Phase 3 Erosion Mitigation
Peters First Nation -
Peters First Nation - Fraser River Flood Control Berm
Peters First Nation, British Columbia -
Peters Island Flood and Erosion Mitigation
Peters First Nation - Peters 2 -
Peters First Nation Gravel Pit Activation
Peters IR 1