Agriculture and Agri-Food Canada Building Demolition at Summerland
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Project Description:
As part of the National Building Demolitions Program, Agriculture and Agri-Food Canada intends to demolish Building #22 at Summerland Research and Development Centre. This building is vacant, does not contribute to the Departmental mandate, and will not be replaced.
Latest update
The authority issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | August 24, 2021 |
| 1 | Public Comment Period on Intent to Make a Determination | - | July 16, 2021 |
Contacts
Environmental Management ServicesAgriculture and Agri-Food Canada
Building 12, Central Experimental Farm
960 Carling Avenue
Ottawa, Ontario K1A 0C5
Email: aafc.EnvMgtServices-Servicesgestionenv.aac@agr.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Summerland (British Columbia)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2021-07-16 -
Proponent
Agriculture and Agri-Food Canada -
Authorities
- Agriculture and Agri-Food Canada
-
Assessment Type
Project on federal lands -
Reference Number
82780
Nearby assessments
...within 200 kilometres-
Summerland Chemical Storage Building Project
Summerland -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
Princeton Detachment Replacement
Princeton -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Timixw Mixed Use Development
Vernon, BC -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Head of the Lake Subdivision
Vernon -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
New Fibre Installation
Okanagan -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
New Fibre Installation
Project site 2: Salmon River -
New Fibre Installation
Coldwater -
Timber harvesting on Salmon River 1
Salmon River 1 -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
New Fibre Installation
Project site 1: Enderby 2 -
New Fibre Installation
Project Site 5: ENDERBY 2 -
New Fibre Installation
Nooaitch -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Affordable Housing Units
Adams Lake Indian Band -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Marine yard development
Marine yard development -
Ajax Mine Project
Kamloops -
New Fibre Installation
Project Site 6: SWITSEMALPH -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
New Fibre Installation
TteS West Tkemlups -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
North Thompson Rail Terminal Development Project
Kamloops -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Speyum Creek Watercourse Restoration
Speyum Creek -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
Record Ridge Mine Project
7 kilometres southwest of Rossland -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Debris Deflector Installation
Debris Deflector Installation -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Annacis Water Main No. 2 Scour Protection project
Annacis Water Main No. 2 Scour Protection project -
Paterson Port of Entry Redevelopment
Paterson Port of Entry -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Peters First Nation Phase 3 Erosion Mitigation
Peters First Nation -
Peters First Nation - Fraser River Flood Control Berm
Peters First Nation, British Columbia -
Peters Island Flood and Erosion Mitigation
Peters First Nation - Peters 2 -
Peters First Nation Gravel Pit Activation
Peters IR 1 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Vito Shipyards Wharf Repairs - Extension to the Expiry Date - Public comments invited
Vito Shipyards Wharf Repairs - Extension to the Expiry Date -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Sunrise Expansion Program
Reserve - Seabird Island Band -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Seabird Island Indian Band - Seabird Island Community and Cultural Centre
Seabird Island Indian Band - Seabird Island Community and Cultural Centre -
New Fibre Installation
Project Site 09: PopKum 1 -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Sunrise Expansion Program
Reserve - Cheam First Nation -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
New Fibre Installation
Project Site 03: Cheam 1 -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
New Fibre Installation
Project Site 01:Schelowat 1 -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
New Fibre Installation
Project Site 10: Kamloops 4 -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Kwìkwèxwelhp Healing Village - Access Road Repair and Re-grading
Kwìkwèxwelhp Healing Village -
Yakweakwioose First Nation Stormwater Outfall
Yakweakwioose 12 I.R. -
Skowkale / Yakweakwioose; Subdivision Preloading
08059 -YAKWEAKWIOOSE 12 -
Stormwater Outflow into Chilliwack Creek
Skowkale 10.1.R. -
Skowkale / Yakweakwioose; Subdivision Preloading
08049 - SKOWKALE10 -
SAY Community Centre
Skowkale No. 10 Reserve Land -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Sq'éwlets Cultural and Recreational Multi-use Trail Project
Squawkum Creek No.3 -
Bivouac Site, OPSEE Training Area
OPSEE Training Area, Vance road, Cultus Lake -
New Fibre Installation
Project Site 05: Tzeachten 13 -
Sq'ewlets - Squawkum Creek IR#3 Water System Upgrade
Squawkum Creek IR#3 -
Ashwell Road Development Project
Ashwell Road, Chilliwack, BC -
Cedarbrook Housing Development Project
Skway Indian Reserve No.5 (Shxwhá:y Village), Chilliwack, BC -
Sediment Removal at Hope Slough, Chilliwack
Hope Slough, Chilliwack -
Chilliwack Creek Stormwater Outfall Installation
Chilliwack -
Aitchelitz First Nation Stormwater Outfall
Aitchelitz First Nation -
Aitchelitz Subdivision and Community Infrastructure Upgrades
Aitchelitz -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
PRTC Temporary Training Shelter
Chilliwack -
New Fibre Installation
Project Site 04: Soowahlie 14 -
Road Realignment and Culvert Installation - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Nicomen Dike upgrade - Skumulsph IR 16
Athey Road, Nicomen Dike, Skumulsph IR 16 -
Cultus Lake Septic Upgrade Project
Cultus Lake Laboratory -
Ministry of Transportation and Infrastructure - Culvert Replacement Columbia Valley Road
The Cultus Lake Laboratory -
New Fibre Installation
Project Site 06: Louis Creek 4 -
Deroche Creek Long Term Solutions
Deroche Creek -
Deroche Creek Realignment and Sediment Removal
Deroche -
Douglas First Nation - Douglas IR# 8 Lot# 30 and 31 Development
Douglas IR#8 (08013) -
Xa'xtsa (Douglas First Nation) Wastewater and Sludge Management
Douglas IR#8 (08013) -
Parking Lot repave
301 3rd Street West, Revelstoke -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Access Route and Drill Pad Construction at Inch Creek Hatchery
Inch Creek Hatchery -
Sumas IR6 Former Brick Plan Demolition and Remediation
Sumas First Nation Indian Reserve 6 -
Construction of two buildings on Sumas First Nation Land, Abbotsford
Sumas First Nation, Abbotsford -
Inch Creek Hatchery Modernization: Construction of Tub Module
Inch Creek Hatchery -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
New Fibre Installation
Project Site 08: North Thompson 1 -
Mission Institution (Medium) - Hydro Service Connection
Mission Institution -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Maintenance Dredging, Fraser River, Small Craft Harbours
Mission Harbour -
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)