The proposed project is a ~470m multi-use pathway (MUP) which is the second phase of a non-motorized pathway that will provide residents and visitors an accessible, separated, multi-use facility to walk, cycle, and travel safely between community destinations on Whispering Pines I.R. #4. This second phase will complete the off-road MUP on the east side of Westsyde Rd. Phase 2 of the MUP will pick up where Phase 1 left off and complete the connection from the key community destinations (Community Hall, proposed multi-purpose facility, rodeo grounds) to the main residential areas on I.R. #4 as well as scenic and recreation areas.
The Project will take place entirely on Whispering Pines I.R. #4. The Project involves ~135 m2 of excavation to create a ramp. Clearing and grubbing will be required for the construction of the 470 m long pathway. No works near water are required. The total project area is ~1140 m2.
Latest update
November 19, 2025 - Housing, Infrastructure and Communities Canada has determined that the Westsyde Road Multi-Use Pathway: Phase 2 Project (the Project) is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- Impacts on rights of Indigenous peoples;
- Indigenous knowledge;
- community knowledge;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of local environmental. Based on the consideration of these measures, Housing, Infrastructure and Communities Canada is satisfied that that the carrying out of the Project is not likely to cause significant adverse environmental effects.
Therefore, Housing, Infrastructure and Communities Canada may carry out the Project, exercise any power, perform any duty or function, or provide financial assistance to enable the Project to be carried out in whole or in part.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | November 19, 2025 |
| 1 | Westsyde Road Multi-Use Pathway: Phase 2 | - | April 2, 2025 |
Contacts
Regan ChattenHousing, Infrastructure and Communities Canada
Regan Chatten, Environmental Review Officer
180 Kent Street
Ottawa, Ontario K1R 7W8
Telephone: 343-598-0300
Email: regan.chatten@infc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Westsyde Road Multi-Use Pathway: Phase 2 (British Columbia)
-
Nature of Activity
- Recreation and Tourism
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2025-04-02 -
Proponent
Whispering Pines/Clinton Indian Band -
Authorities
- Infrastructure Canada
-
Assessment Type
Project on federal lands -
Reference Number
89410
Nearby assessments
...within 200 kilometres-
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
New Fibre Installation
Project Site 10: Kamloops 4 -
New Fibre Installation
Project Site 06: Louis Creek 4 -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
North Thompson Rail Terminal Development Project
Kamloops -
New Fibre Installation
Project Site 08: North Thompson 1 -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Ajax Mine Project
Kamloops -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
New Fibre Installation
Project Site 6: SWITSEMALPH -
Harper Creek Mine Project
Vavenby -
Affordable Housing Units
Adams Lake Indian Band -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
Timber harvesting on Salmon River 1
Salmon River 1 -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
New Fibre Installation
Project site 2: Salmon River -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
New Fibre Installation
Okanagan -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
New Fibre Installation
Project site 1: Enderby 2 -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
New Fibre Installation
Project Site 5: ENDERBY 2 -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Head of the Lake Subdivision
Vernon -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Timixw Mixed Use Development
Vernon, BC -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
New Fibre Installation
Nooaitch -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
New Fibre Installation
Coldwater -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Ruddock Creek Mine Project
Avola -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
New Fibre Installation
Canoe Creek IR#2 -
Revision to the Posting for IAA Reference Number 85749 (Canoe Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Canoe Creek/Meadow Lake
Stswecem'c Xget'tem First Nation -
New Telus Communications Inc. Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Parking Lot repave
301 3rd Street West, Revelstoke -
Speyum Creek Watercourse Restoration
Speyum Creek -
New Telus Communications Inc. Telecommunication Tower Project in Dog Creek 1 Reserve on Stswecem'c Xget'tem Nation Lands
Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Revision to the Posting for IAA Reference Number 85748 (Dog Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands.
Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands. -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Dog Creek
Stswecem'c Xgat'tem First Nation -
Timber Harvesting on Pete Suckers IR 13
Pete Suckers IR 13 -
Esk'Etemc First Nation Road and Drainage Improvements (Alkali Lake)
Alkali Lake 1; Swan Lake 3; and Alkali Lake 4A -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Nazco 20 -
New Telus Communications Inc. Telecommunication Tower Project in Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands
Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands -
Esk'etemc First Nation - Telus Telecommunications Tower - Alkali Lake
Esk'etemc First Nation -
Esk'etemc-Alkali Lake IR1 Wastewater Upgrades project
Esk'etemc, Alkali Lake IR 1 -
Summerland Chemical Storage Building Project
Summerland -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
N'Quatqua-Wastewater and Sludge Management
07991 - NEQUATQUE 1-75805CLSRBC / 75667CLSRBC -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
N'Quatqua Watermain Extension and Phase 1 Subdivision
N'Quatqua IR#1 -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Princeton Detachment Replacement
Princeton -
Williams Lake First Nation Community Playground Project
Williams Lake First Nation Community Playground Project -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
Knucwentwecw Society Office
2561 Quigli Drive -
New Fibre Installation
James Louie 3A Reserve (Williams Lake First Nation) -
Williams Lake First Nation - Northside Development (Coyote Rock)
Williams Lake IR1 -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Timber harvesting on MOUNT CURRIE 6
Mount Currie 6 -
Timber harvesting on MOUNT CURRIE 6 & MOUNT CURRIE 7
Mount Currie 6 -
Lílwat Nation: Xetólacw Village Road Resurfacing
Xetólacw Village where works are planned to occur is located roughly 5 km east of Mount Currie Village on IR #6. -
Timber harvesting on MOUNT CURRIE 6 & MOUNT CURRIE 7
Mount Currie 7 -
Telus Communications Inc., new radiocommunications tower (BC105333) on Toosey I.R. No. 1, near Riske Creek, BC.
BC105333 - Toosey I.R. No. 1 -
Tl'esqox First Nation - Telus Telecommunications Tower - Riske Creek, Toosey IR1
Toosey First Nation -
Construction of a Cattle Exclusion Snake Fence - 3rd Canadian Division Support Base
3rd Canadian Division Support Base -
Timber harvesting on MOUNT CURRIE 6
Mount Currie 6 -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
(Lil'wat IR# 10) Poleyard Dike Improvements along Birkenhead River
Lil'wat IR#10 -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Skatin-Wastewater System and Sludge Management
Skatin First Nation, 08015 - SKOOKUMCHUCK 4 -
Hazard Spruce Tree Removal
Glacier National Park -
Timber harvesting on Skookumchuck 4
Skoomkumchuk 4, 4A and 9 -
Samahquam-Wastewater System and Sludge Management
Samahquam First Nation, 08041 - Q'ALATKU7EM -
Spanish Mountain Gold Project
70 kilometres northeast of Williams Lake -
Spanish Mountain Gold Mine Project
70 kilometres northeast of Williams Lake -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Douglas First Nation - Douglas IR# 8 Lot# 30 and 31 Development
Douglas IR#8 (08013) -
Xa'xtsa (Douglas First Nation) Wastewater and Sludge Management
Douglas IR#8 (08013) -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Marine yard development
Marine yard development -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1