Enbridge Pipelines Inc. - Line 3 Replacement Program
On 5 November 2014, Enbridge Pipelines Inc. (Enbridge) submitted an application to the National Energy Board (NEB or Board) for the proposed Line 3 Replacement Program. Enbridge proposes to replace the majority of its existing Line 3 crude oil pipeline with a new pipeline between Enbridge’s Hardisty Terminal near Hardisty, Alberta, and Gretna Station, near Gretna, Manitoba.
The Project would include:
- the construction of approximately 1,096 km of new 914.4 mm (NPS 36) outside diameter crude oil pipeline, including approximately 25 remotely operated sectionalizing valves and ancillary facilities;
- 18 new pump stations and associated infrastructure and equipment;
- 3 new oil storage tanks (50,000 m3 each), including associated components and facilities, at the Hardisty Terminal;
- 24 communication towers; and
- the decommissioning of the corresponding part of the existing Line 3 863.6 mm (NPS 34) outside diameter crude oil pipeline.
Some temporary infrastructure, such as access roads, a worker camp, stockpile sites and contractor staging areas would also be required during construction.
The majority of the replacement pipeline would be situated adjacent to Enbridge’s Mainline System corridor. The typical width of the construction RoW would be 45 m, including 12 m of permanent easement.
If regulatory approval is obtained, construction of the new pipeline is proposed to start in the second quarter of 2016, with an anticipated in-service date in late 2017. Decommissioning activities are proposed to begin once the replacement pipeline is in service, and would take 12 to 18 months to complete.
Consultation and Cooperation with Other Jurisdictions
Section 18 of the Canadian Environmental Assessment Act, 2012 (CEAA 2012) provides that, as the responsible authority for this Project, the NEB must offer to consult and cooperate with respect to the environmental assessment (EA) of the Project with any jurisdiction referred to in paragraphs (c) to (h) of the definition of “jurisdiction” in CEAA 2012 subsection 2 (1) if that jurisdiction has powers, duties or functions in relation to an assessment of the environmental effects of the designated project.
If you believe you are such a jurisdiction under CEAA 2012 section 18, please self-identify with the NEB describing how you meet the definition of jurisdiction and explain your relevant EA power, duty, or function, as well as the activities your jurisdiction plans to undertake to exercise your powers, duties or functions to complete an EA of this designated project. The Board’s assessment process often includes steps that might be relied upon by other jurisdictions that have EA powers, duties or functions, or may be able to provide other opportunities for cooperation with the EA process of eligible jurisdictions if timely notice is provided. Accordingly, please write to the NEB as soon as possible and, in any event, no later than 10 days prior to the deadline for applying to participate with this information, so that opportunities can be explored.
All correspondence should be addressed to the Secretary of the Board and filed by fax (1-877-288-8803), through the NEB’s e-filing tool (on the NEB’s website [www.neb-one.gc.ca] under Submit Applications and Regulatory Documents, then File a Letter of Comment), or mailed in hard copy to:
National Energy Board
517 Tenth Avenue SW
Calgary, Alberta
T2R 0A8
Latest update
Participate
External links
Contacts
National Energy Board517 Tenth Avenue SW
Calgary, Alberta T2R 0A8
Telephone: 1-800-899-1265
Email: L3RP.ProcessHelp@neb-one.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Cromer (Manitoba)
- Gretna (Manitoba)
- Hardisty (Alberta)
- Kerrobert (Saskatchewan)
- Morden (Manitoba)
- Regina (Saskatchewan)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
Completed -
Start Date
2015-02-04 -
Proponent
Enbridge Pipelines Inc. -
Authorities
- National Energy Board
-
Assessment Type
Environmental assessment under CEAA 2012 -
Reference Number
80091
Nearby assessments
...within 200 kilometres-
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Stanley Trail Association Community Pathway Project
Morden -
Morden Pesticide and Chemical Building Project
Morden -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Energy East Project
Winnipeg -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Vivian Sand Project
Springfield -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Lena Port of Entry Redevelopment
Lena Port of Entry -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Subsurface Septic System Rehabilitation
Ontario -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Women's Lodge & Cultural Safe Space
Kejick -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
New Fibre Installation
Project site: Various parts of Manitoba -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
East Trails Project - East Gate
Riding Mountain National Park -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Mooswa East Water Line
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
New Fibre Installation
Riding Mountain National Park -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Smallmouth Bass Project
Riding Mountain National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Energy East Project
Moosomin -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Tower Hill VHF Tower
Riding Mountain National Park -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
WireIE (Canada) Inc. - Radiocommunication Tower - Northgate Border Crossing, Hwy 9, Northgate SK
Northgate Border Crossing -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
White Bear First Nation Community Spray Park
White Bear 70 -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
New Fibre Installation
Project Site 1: White Bear -
White Bear First Nation Wastewater Upgrade Project
White Bear First Nation -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
North Portal Septic Tank Replacement
North Portal -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
Estevan Port of Entry Redevelopment
Estevan Port of Entry -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
New Fibre Installation
Project Site 2: Cowessess -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Zagime Anishinabek School
Sakimay IR 74 -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Zagime Community Center
Zagime IR #74-3 -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
WireIE (Canada) Inc. - Radiocommunication Tower - Torquay Border Crossing, Hwy 350, Torquay SK
Torquay Border Crossing -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Oungre Port of Entry Redevelopment
Oungre Port of Entry -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
New (Multiple) Tower Construction
School Tower -
WireIE (Canada) Inc. - Antenna Structure - Regway Border Crossing, Hwy 6, Regway SK
Regway Border Crossing -
Regway Port of Entry Redevelopment
Regway Port of Entry -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Awasis Solar Project
SE 7-17-18 W2 -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Potash Mine Project
Lestock -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Runway De-Icing Liquid Storage Tank
Regina -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Runway 13-31 Rehabilitation
Regina -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Fire Hall
George Gordon First Nation -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
WireIE (Canada) Inc. - Antenna Structure - Coronach Border Crossing, Highway 36, P.O. Box 189, Coronach, SK
Coronach Border Crossing -
Runway Rehabilitation of 11R-29L - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
Runway Rehabilitation - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Remediate Sites and Construct Buildings for Future Aircrew Training (FAcT) Program- 15 Wing Moose Jaw
15 Wing Moose Jaw -
Sanitary Force Main Pipeline Replacement Design and Construction - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Construct North Access Road - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw
15 Wing Moose Jaw -
Relocate RV Compound - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Aspen Power Station Project
Lanigan -
Ocean Man Indian Reserve 69E Pipeline
Ocean Man Indian Reserve 69E -
Lake Diefenbaker Irrigation Expansion Projects
Lake Diefenbaker -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Apron III infill
Saskatoon International Airport YXE -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Great Plains Generating Station Project
Northwest of Swift Current -
Chinook Power Station Project
Approximately 11 kilometres northwest of Swift Current -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Sweetgrass New School
Sweetgrass IR 113 -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Prairie National Wildlife Area Units 25 and 26 Natural Gas Well Abandonment
Prairie National Wildlife Area Unit 25 -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Prairie National Wildlife Area Units 25 and 26 Natural Gas Well Abandonment
Prairie National Wildlife Area Unit 26 -
Little Pine First Nation Health Clinic
Little Pine Indian Reserve No. 116 -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Thunderchild Community Walking Trail
Thunderchild First Nation -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild First Nation Firehall
Thunderchild First Nation Indian Reserve No. 115B -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
Siksika Children's Village Phase 2 Project
Siksika Nation -
9A-2-20-8 Installation of a Pipeline
CFB Suffield, Medicine Hat -
15-8-17-6 Installation of a Gas Pipeline
CFB Suffield, Medicine Hat -
Modernize Chemical and Biological Laboratories
Canadian Forces Base Suffield -
2021 Single Well Battery (SWB) Tie-in Project
CFB Suffield, Medicine Hat -
Replace roof of Building 1 at CFB Suffield
CFB Suffield, Medicine Hat -
Connecting Pipelines Project - Canadian Forces Base (CFB) Suffield
Canadian Forces Base (CFB) Suffield -
Installation of three oil wells and associated pipelines- Canadian Forces Base (CFB) Suffield
Canadian Forces Base Suffield, Medicine Hat -
Three Phase Underground Service for Matilda Tower (SW-29-19-6-4) - Canadian Forces Base (CFB) Suffield
Canadian Forces Base (CFB) Suffield -
Install Prime Power to Building 471 - Canadian Forces Base Suffield
Canadian Forces Base Suffield -
2023 IPC Annual Development and Operations Plan - Canadian Forces Base Suffield
Canadian Forces Base Suffield -
IPC 13-35-19-7 Electric Cable Installation - Canadian Forces Base Suffield
Canadian Forces Base Suffield -
BB-Pool Deep Cathodic Anode Bed and Rectifier Installation - Canadian Forces Base Suffield
Canadian Forces Base Suffield -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
Onion Lake Family Services Inc. Child and Family Services Building
Onion Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Lloydminster Region Abandonment Project
Makaoo Indian Reserve 120 (Onion Lake Cree Nation) -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Onion Lake 3D 2026 Seismic Program
Onion Lake 3D 2026 Seismic Program -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Ministikwan Community Road Repairs
Ministikwan Lake Cree Nation -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
New Power Line Installation
CFB Suffield, Medicine Hat -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrades to Roads within Administrative Area- Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Construct Hazardous Waste Storage Facility - Garrison Wainwright
Garrison Wainwright -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Construct Building for Ammunition Salvage at Garrison Wainwright
Garrison Wainwright -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Remedial activities at a site impacted by Aqueous Film Forming Foam (AFFF) - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
OS-7257 Authorization to construct and operate a surface lease for an access road and for a multi-well oil pad
Frog Lake First Nation -
OS-7262 Authorization to Construct and Operate a Surface Lease for a multiwell oil pad
Frog Lake First Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
OS-6826 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake First Nation 4 Unit Housing Project
Frog Lake First Nation -
Battle River Pumphouse Replacement - Garrison Wainwright
Garrison Wainwright -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Frog Lake CFS Equine Centre
Frog Lake -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Demolition of Building 598 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Demolition of Building 27 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Upgrade of Main Refueling Station at Canadian Forces Base Wainwright (Alberta)
CFB Wainwright -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-6634 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Energy East Project
Hardisty -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
OS-7268 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad.
Frog Lake First Nation -
OS-7259 Authorization to construct and operate a surface lease for a multi-well oil pad
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-6908 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
OS-6891 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
OS-7269 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
OS-7260 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7270 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
OS-7265 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7267 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7266 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
EX-9999 Authorization for a 3D seismic exploration program for oil and gas development
Frog Lake First Nation -
OS-7261 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7264 Authorization to Construct and Operate a Surface Lease for multiwell oil pad
Frog Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
OS-7263 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Underground CO2 Storage Hub -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
OS -7254 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad - Public Comments Invited
Kehewin Cree Nation -
Kehewin Cree Nation Telus Tower AB103726
Kehewin Cree Nation -
Telus telecommunications tower located on Kehewin Cree Nation located south of Bonnyville, AB
Telus telecommunications tower located on Kehewin Cree Nation -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Kehewin 123 -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
New Fibre Installation
Saddle Lake 125 -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Pathway to Learning
Saddle Lake No. 125 -
Frog Lake First Nation Askiy Hemp Limited Partnership Project
Frog Lake First Nation -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake Cree Nation Townsite Pumphouse Project
Townsite Pumphouse -
Saddle Lake Cree Nation Pathway to Learning
Saddle Lake Cree Nation -
Ryley Facility Expansion Project
Ryley -
Ryley Biomedical Waste Incinerator Project
Ryley -
Whitefish Lake First Nation Subdivision Lot Development
Whitefish Lake First Nation #128 -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Culvert Clearing
Elk Island National Park -
Astotin Lake Dock Replacement
Elk Island National Park -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Pedestrian Bridge Replacement on Simmons Trail
Elk Island National Park -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Decoy Beaver Dam Pilot Project for Beaver Coexistence Management
Elk Island National Park of Canada -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Lamont Railcar Storage Project
Northwest of Lamont -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Samson Cree Nation Aboriginal Head Start on Reserve
Samson Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Ermineskin Drainage Improvements (Culvert Replacement - Small Boy Road, Buffalo Avenue, 3 Mile Road) Project
Ermineskin Cree Nation -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construct a new Mock Jump Tower training facility – Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land, near Maskwacis, AB.
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 2: Ermineskin 138 -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Water Treatment Plant Upgrades
Louis Bull Tribe -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
Josephburg Condensate Fractionation Project
22 kilometres northeast of Edmonton -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 1: Louis Bull 138B -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Parking lot replacement at RCMP Detachment in Innisfail, Alberta
Innisfail -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Enoch ATCO Plastic Mains Replacement Project
Enoch Cree Nation -
Cando Sturgeon Rail Terminal West Expansion Project
Sturgeon County -
Greenlight Electricity Centre Project
10 km east of Gibbons, Sturgeon County -
Base Line Terminal Project
Edmonton -
Beacon AI Centers Heartland Project
Sturgeon County, about 7 kilometres east of Gibbons -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Airside Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
Reservoir 1 Gravel Road Construction and Parking Lot Regrading at Edmonton International Airport
Edmonton International Airport -
Value Park Pavement at the Edmonton International Airport
Edmonton Regional Airports Authority -
Taxiway B4 Pavement Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Quick Park Improvements at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Arrivals Level Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Sanitary Mainline, Manhole, Waterline and Valve Repairs and Replacement at Edmonton International Airport
Edmonton International Airport -
New Hotel Development at Edmonton International Airport
Edmonton International Airport -
AirPoint 2 Development at the Edmonton International Airport
Edmonton International Airport -
North Tower Expansion at Edmonton International Airport
Edmonton International Airport -
Cold Storage Facility Construction at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
GroHERE at Edmonton International Airport
Edmonton International Airport -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Trans Mountain Expansion Project
Edmonton -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 4 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 1 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 3 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 2 -
Design and Construct Armored Combat Support Vehicle (ACSV) Facility- 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Skate Park Expansion - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Base Edmonton -
Repair Normandy Road - Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Design and Construct Dry Gap Bridge Training Aide, Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Construction of the Strategic Tanker Transport Capability, Main Operating Base (West), Alberta
Main Operating Base (West) - Edmonton -
Construct Transition Centre - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Alexander First Nation CU360 Drinking Water Supply Project
Alexander First Nation -
Construct Land Vehicle Crew Training System Facility- 3rd Canadian Division Support Base Edmonton
3 Canadian Division Support Base (CDSB) Edmonton -
Canadian Forces Base (CFB) Edmonton Garrison Spray Park and Playground Construction
Edmonton garrison -
Construction of Canadian Forces Housing Agency (CFHA) Apartments, Row Houses, Duplexes, Access Roads and Site Services, 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
Enoch Cree Nation Medical Treatment Centre Project
Enoch Cree Nation -
ATCO Gate Station Project
ATCO Gate Station -
Enoch Cree Nation ATCO 1121399 Removal Phase 3 Project
Enoch Cree Nation -
Enoch River Cree Hotel Expansion
Enoch Cree Nation -
Enoch Recovery Center Project
Enoch Cree Nation -
Enoch Nation Embers Addition to River Cree Casino & Hotel
Enoch Cree Nation -
ATCO Gas Main Installation for NEDA Commercial Stage 1, Millennium Phase 1, and Community Recovery Center
Enoch Cree Nation -
RHI 20 Unit Subdivision
Enoch Cree Nation -
ATCO Removal of 35m 42.2 mm Transmission Line on Enoch Cree Nation
Enoch Cree Nation -
ATCO Removal of 1 km of 42 mm Pipeline on Enoch Cree Nation Phase 2
Enoch Cree Nation -
Enoch Cree Nation ATCO PMR Maskekoshihk Phases 7-9
Enoch Cree Nation -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Enoch Cree Nation 2 Unit Housing Project
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Enoch Village Water and Wastewater Rehabilitation
Enoch Cree Nation -
Enoch Cree Nation mnn Childhood Family Services Administration Building Project
Enoch Cree Nation -
New Fibre Installation
Pigeon Lake 138A, Elk Island National Park