The Canadian Wildlife Service is proposing to undertake the construction of an observation tower located at the Last Mountain Lake National Wildlife Area, near to the Last Mountain Regional Park, which shares a boundary with our Protected Areas. The Last Mountain Lake Wildlife Area is one of 10 national wildlife areas identified under the Connecting Canadians to Nature initiative that supports connecting Canadians to the natural world.
The scope of the project includes the construction of an observation tower with a footprint of approximately 56 sq.m, supported on concrete pilings, along with a 100m mowed access trail on an undeveloped yet historically disturbed site. The proposed work will be completed during fall / winter and during a period when disturbance to migratory birds and other wildlife will be minimal. This is also the dry season, thus soil disturbance and compaction will be minimal as well. All necessary measures to address potential erosion and limit the construction footprint will be employed. All exposed surfaces will be contoured back to natural topography, reseeded with a native plant seed mix and covered with native hay mulch at the completion of construction. The project will result in the loss of 56 sq.m of grassland habitat.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination - Observation Tower II | PDF (388 KB) | September 8, 2020 |
Contacts
Sean LeMoineThe Canadian Wildlife Service
Sean LeMoine, Protected Areas Specialist
9250 - 49th Street NW
Edmonton, Alberta T6B 1K5
Telephone: 902-830-8014
Email: sean.lemoine@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Last Mountain Lake National Wildlife Area (Saskatchewan)
-
Nature of Activity
- Building and Property Development
- Recreation and Tourism
-
Assessment Status
Completed -
Start Date
2020-08-06 -
Proponent
The Canadian Wildlife Service -
Authorities
- Environment and Climate Change Canada
-
Assessment Type
Project on federal lands -
Reference Number
80908
Nearby assessments
...within 200 kilometres-
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
Aspen Power Station Project
Lanigan -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
George Gordon First Nation Fire Hall
George Gordon First Nation -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Potash Mine Project
Lestock -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
New (Multiple) Tower Construction
School Tower -
Lake Diefenbaker Irrigation Expansion Projects
Lake Diefenbaker -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Runway 13-31 Rehabilitation
Regina -
Runway De-Icing Liquid Storage Tank
Regina -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Relocate RV Compound - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw
15 Wing Moose Jaw -
Sanitary Force Main Pipeline Replacement Design and Construction - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Remediate Sites and Construct Buildings for Future Aircrew Training (FAcT) Program- 15 Wing Moose Jaw
15 Wing Moose Jaw -
Runway Rehabilitation - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Construct North Access Road - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Awasis Solar Project
SE 7-17-18 W2 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Runway Rehabilitation of 11R-29L - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Apron III infill
Saskatoon International Airport YXE -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Batoche Drainage Improvement
Grasslands National Park -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Zagime Anishinabek School
Sakimay IR 74 -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Zagime Community Center
Zagime IR #74-3 -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100