Trench Removal and Site Restoration in C1 area at CFB Wainwright
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
The Department of national Defence is proposing to remove trench materials in the Range and Training Area C1. Trench materials are corrugated steel sheets with wood and metal stakes. Total approximate trench area of 468 square meters. The project work also includes site restoration. The project will occur in the Range Training Area (RTA) at Wainwright
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | September 9, 2020 |
| 1 | Public Comment Period on Intent to Make a Determination | - | July 31, 2020 |
Contacts
Project Manager, Real Property Operations Unit (West) Detachment WainwrightDepartment of National Defence
Caroline Paquin, Project Manager, Real Property Operations Unit (West) Detachment Wainwright
Real Property Operations Unit (West) Detachment Wainwright
Denwood, Alberta T0B 1B0
Email: caroline.paquin@forces.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- The Range Training Area (RTA) at Detachment Wainwright (Alberta)
-
Nature of Activity
- Defense and Security
-
Assessment Status
Completed -
Start Date
2020-07-31 -
Proponent
Department of National Defence -
Authorities
- Department of National Defence
-
Assessment Type
Project on federal lands -
Reference Number
80900
Nearby assessments
...within 200 kilometres-
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Battle River Pumphouse Replacement - Garrison Wainwright
Garrison Wainwright -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Upgrades to Roads within Administrative Area- Garrison Wainwright
Garrison Wainwright -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Construct Hazardous Waste Storage Facility - Garrison Wainwright
Garrison Wainwright -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Construct Building for Ammunition Salvage at Garrison Wainwright
Garrison Wainwright -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Demolition of Building 27 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Demolition of Building 598 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Upgrade of Main Refueling Station at Canadian Forces Base Wainwright (Alberta)
CFB Wainwright -
Remedial activities at a site impacted by Aqueous Film Forming Foam (AFFF) - Garrison Wainwright
Garrison Wainwright -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Frog Lake CFS Equine Centre
Frog Lake -
Frog Lake First Nation 4 Unit Housing Project
Frog Lake First Nation -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
OS-6826 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake First Nation Askiy Hemp Limited Partnership Project
Frog Lake First Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
Lloydminster Region Abandonment Project
Makaoo Indian Reserve 120 (Onion Lake Cree Nation) -
Onion Lake Family Services Inc. Child and Family Services Building
Onion Lake First Nation -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
OS-7270 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
OS-7262 Authorization to Construct and Operate a Surface Lease for a multiwell oil pad
Frog Lake First Nation -
OS-7257 Authorization to construct and operate a surface lease for an access road and for a multi-well oil pad
Frog Lake First Nation -
OS-6634 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7259 Authorization to construct and operate a surface lease for a multi-well oil pad
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-6908 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
OS-7268 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad.
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7267 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
New Fibre Installation
Saddle Lake 125 -
OS-6891 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
EX-9999 Authorization for a 3D seismic exploration program for oil and gas development
Frog Lake First Nation -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Underground CO2 Storage Hub -
OS-7260 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7265 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Energy East Project
Hardisty -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
OS-7263 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7269 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
OS-7266 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
OS-7261 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Hardisty -
OS-7264 Authorization to Construct and Operate a Surface Lease for multiwell oil pad
Frog Lake First Nation -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Pathway to Learning
Saddle Lake No. 125 -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake Cree Nation Townsite Pumphouse Project
Townsite Pumphouse -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Onion Lake 3D 2026 Seismic Program
Onion Lake 3D 2026 Seismic Program -
Saddle Lake Cree Nation Pathway to Learning
Saddle Lake Cree Nation -
Kehewin Cree Nation Telus Tower AB103726
Kehewin Cree Nation -
Telus telecommunications tower located on Kehewin Cree Nation located south of Bonnyville, AB
Telus telecommunications tower located on Kehewin Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
OS -7254 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad - Public Comments Invited
Kehewin Cree Nation -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Kehewin 123 -
Ryley Facility Expansion Project
Ryley -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Ryley Biomedical Waste Incinerator Project
Ryley -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Whitefish Lake First Nation Subdivision Lot Development
Whitefish Lake First Nation #128 -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nations 3-Phase Subdivision Development
Cold Lake First Nations -
Ministikwan Community Road Repairs
Ministikwan Lake Cree Nation -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
Culvert Clearing
Elk Island National Park -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Astotin Lake Dock Replacement
Elk Island National Park -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Medley Extension – 4 Wing Cold Lake
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 – Cold Lake Air Weapons Range
Cold Lake Air Weapons Range -
The Design and Construction (Modified Design Build) of the New 4 Wing Quick Reaction Alert (QRA) Area– 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
TERMINATED: Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Construction of a Retail Warehouse - 4 Wing Cold Lake
4 Wing Cold Lake -
Snow and Ice Clearing (SNIC) Expansion – 4 Wing Cold Lake
4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Development of Hangars in the Quick Reaction Area – 4 Wing Cold Lake, Alberta
4 Wing Cold Lake -
Relocation of the Deployable Maintenance Facility (DMF) Training Compound – 4 Wing Cold Lake
4 Wing Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Pedestrian Bridge Replacement on Simmons Trail
Elk Island National Park -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Decoy Beaver Dam Pilot Project for Beaver Coexistence Management
Elk Island National Park of Canada -
Lamont Railcar Storage Project
Northwest of Lamont -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nations-Four Unit Housing Project 2024 2025
Cold Lake First Nations -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Little Pine First Nation Health Clinic
Little Pine Indian Reserve No. 116 -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation English Bay Gas Station Project
Cold Lake First Nation -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild Community Walking Trail
Thunderchild First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 1: Kikino Metis Settlement -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
Makwa Sahgaiehcan First Nation Well Completion
Makwa Sahgaiehcan First Nation -
Makwa Sahgaiehcan First Nation Transfer Station
Makwa Sahgaiehcan First Nation -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construct a new Mock Jump Tower training facility – Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Powwow Arbour Construction
Pierceland -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 2: West Central region - Big Island Lake -
Big Island Lake Cree Nation Child and Family Service Centre
Big Island Lake Cree Territory -
Josephburg Condensate Fractionation Project
22 kilometres northeast of Edmonton -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 2: Kikino Metis Settlement -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Cando Sturgeon Rail Terminal West Expansion Project
Sturgeon County -
Greenlight Electricity Centre Project
10 km east of Gibbons, Sturgeon County -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 3: Kikino Metis Settlement -
Beacon AI Centers Heartland Project
Sturgeon County, about 7 kilometres east of Gibbons -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Base Line Terminal Project
Edmonton -
Beaver Lake Cree Nation Telus Telecommunications Tower
Beaver Lake Cree Nation -
Notice of Intent to Make a Determination - Start of Public Comment Period (TELUS Communications Inc (AB103721) Beaver Lake Indian Reserve No. 131 )
AB103721 - Beaver Lake Indian Reserve No. 131 -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Beaver Lake Cree Nation Medical Center
Beaver Lake Cree Nation -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Beaver Lake Cree Nation Water Treatment Plant
Beaver Lake Cree Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Enoch ATCO Plastic Mains Replacement Project
Enoch Cree Nation -
Trans Mountain Expansion Project
Edmonton -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
Repair Normandy Road - Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Design and Construct Armored Combat Support Vehicle (ACSV) Facility- 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Design and Construct Dry Gap Bridge Training Aide, Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Construction of the Strategic Tanker Transport Capability, Main Operating Base (West), Alberta
Main Operating Base (West) - Edmonton -
Skate Park Expansion - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Base Edmonton -
Construct Transition Centre - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construct Land Vehicle Crew Training System Facility- 3rd Canadian Division Support Base Edmonton
3 Canadian Division Support Base (CDSB) Edmonton -
Canadian Forces Base (CFB) Edmonton Garrison Spray Park and Playground Construction
Edmonton garrison -
Construction of Canadian Forces Housing Agency (CFHA) Apartments, Row Houses, Duplexes, Access Roads and Site Services, 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
New Hotel Development at Edmonton International Airport
Edmonton International Airport -
Taxiway B4 Pavement Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Quick Park Improvements at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Cold Storage Facility Construction at Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Sanitary Mainline, Manhole, Waterline and Valve Repairs and Replacement at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Arrivals Level Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
Reservoir 1 Gravel Road Construction and Parking Lot Regrading at Edmonton International Airport
Edmonton International Airport -
Value Park Pavement at the Edmonton International Airport
Edmonton Regional Airports Authority -
Airside Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
AirPoint 2 Development at the Edmonton International Airport
Edmonton International Airport -
North Tower Expansion at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Alexander First Nation CU360 Drinking Water Supply Project
Alexander First Nation -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Ermineskin Drainage Improvements (Culvert Replacement - Small Boy Road, Buffalo Avenue, 3 Mile Road) Project
Ermineskin Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Samson Cree Nation Aboriginal Head Start on Reserve
Samson Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 4 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 1 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 3 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 2 -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land, near Maskwacis, AB.
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 2: Ermineskin 138 -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Enoch Cree Nation Medical Treatment Centre Project
Enoch Cree Nation -
Enoch Cree Nation ATCO 1121399 Removal Phase 3 Project
Enoch Cree Nation -
ATCO Gate Station Project
ATCO Gate Station -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Louis Bull Water Treatment Plant Upgrades
Louis Bull Tribe -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 1: Louis Bull 138B -
Enoch River Cree Hotel Expansion
Enoch Cree Nation -
Enoch Nation Embers Addition to River Cree Casino & Hotel
Enoch Cree Nation -
ATCO Gas Main Installation for NEDA Commercial Stage 1, Millennium Phase 1, and Community Recovery Center
Enoch Cree Nation -
Enoch Recovery Center Project
Enoch Cree Nation -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
RHI 20 Unit Subdivision
Enoch Cree Nation -
ATCO Removal of 35m 42.2 mm Transmission Line on Enoch Cree Nation
Enoch Cree Nation -
ATCO Removal of 1 km of 42 mm Pipeline on Enoch Cree Nation Phase 2
Enoch Cree Nation -
Enoch Cree Nation ATCO PMR Maskekoshihk Phases 7-9
Enoch Cree Nation -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Enoch Cree Nation 2 Unit Housing Project
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Enoch Village Water and Wastewater Rehabilitation
Enoch Cree Nation -
Enoch Cree Nation mnn Childhood Family Services Administration Building Project
Enoch Cree Nation -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 7: West Central region - Thunderchild Fixed Wireless Tower -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake Water Treatment Plant and Intake Design
Heart Lake First Nation -
New Fibre Installation
Project Site 2 - Heart Lake: -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake 3-Phase Powerline (Fortis# 500111166)
Heart Lake First Nation -
Heart Lake First Nation - Lift Station Replacement and Sanitary Sewer Line Install
Heart Lake First Nation -
Heart Lake ATCO Gas Distribution Project
Heart Lake First Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
New Fibre Installation
Project Site 1 - Heart Lake: -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
Heart Lake First Nation - ATCO Gas Main Installation
Heart Lake First Nation -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
Regional Assessment of Beaver Lake Cree Nation's Asserted Traditional Territory
Lac la Biche -
Flying Dust Commercial Project
Meadow Lake -
Alexander First Nation Mamawatoskewin Prevention Building
Alexander First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Alexander Wastewater System Upgrades
Sewage Lagoon Rehab and Addition -
Alexander Wastewater System Upgrades
Biofilter Wetland System