RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
A 15 m wide, 498.3 m long right of way easement will provide for the construction and operation of a pipeline that will transport natural gas. Construction of the pipeline and reclamation of the right of way will be completed within the first year of the project. Following decommissioning of the pipeline, the right of way will be surrendered.
The project is located in Frog Lake First Nation. The proponent is West Lake Energy Corp.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period - Indian Oil and Gas Canada | - | January 24, 2023 |
Contacts
Indian Oil and Gas CanadaJilczy Nelson, Environmental Analyst
9911 Chiila Boulevard Suite 100 Tsuut'ina AB T3T 0E1
Calgary, Alberta T3T 0E1
Telephone: 403-292-5625
Email: jilczy.nelson@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Frog Lake First Nation (Alberta)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
Completed -
Start Date
2023-01-24 -
Proponent
West Lake Energy Corp -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
84261
Nearby assessments
...within 200 kilometres-
Lloydminster Region Abandonment Project
Makaoo Indian Reserve 120 (Onion Lake Cree Nation) -
Onion Lake Family Services Inc. Child and Family Services Building
Onion Lake First Nation -
Frog Lake First Nation 4 Unit Housing Project
Frog Lake First Nation -
OS-6826 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake CFS Equine Centre
Frog Lake -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
OS-7257 Authorization to construct and operate a surface lease for an access road and for a multi-well oil pad
Frog Lake First Nation -
OS-7262 Authorization to Construct and Operate a Surface Lease for a multiwell oil pad
Frog Lake First Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Onion Lake 3D 2026 Seismic Program
Onion Lake 3D 2026 Seismic Program -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
OS-6634 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7259 Authorization to construct and operate a surface lease for a multi-well oil pad
Frog Lake First Nation -
OS-6908 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7268 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad.
Frog Lake First Nation -
OS-7270 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
OS-6891 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
OS-7267 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
OS-7260 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
EX-9999 Authorization for a 3D seismic exploration program for oil and gas development
Frog Lake First Nation -
OS-7265 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7269 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
OS-7266 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
OS-7263 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7261 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7264 Authorization to Construct and Operate a Surface Lease for multiwell oil pad
Frog Lake First Nation -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Underground CO2 Storage Hub -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
Kehewin Cree Nation Telus Tower AB103726
Kehewin Cree Nation -
Telus telecommunications tower located on Kehewin Cree Nation located south of Bonnyville, AB
Telus telecommunications tower located on Kehewin Cree Nation -
OS -7254 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad - Public Comments Invited
Kehewin Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Kehewin Lift Station Project
Kehewin Cree Nation -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Kehewin 123 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Ministikwan Community Road Repairs
Ministikwan Lake Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Upgrades to Roads within Administrative Area- Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nations 3-Phase Subdivision Development
Cold Lake First Nations -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Construct Hazardous Waste Storage Facility - Garrison Wainwright
Garrison Wainwright -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Battle River Pumphouse Replacement - Garrison Wainwright
Garrison Wainwright -
New Fibre Installation
Saddle Lake 125 -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
Construct Building for Ammunition Salvage at Garrison Wainwright
Garrison Wainwright -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Remedial activities at a site impacted by Aqueous Film Forming Foam (AFFF) - Garrison Wainwright
Garrison Wainwright -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
Makwa Sahgaiehcan First Nation Well Completion
Makwa Sahgaiehcan First Nation -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Makwa Sahgaiehcan First Nation Transfer Station
Makwa Sahgaiehcan First Nation -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Snow and Ice Clearing (SNIC) Expansion – 4 Wing Cold Lake
4 Wing Cold Lake -
The Design and Construction (Modified Design Build) of the New 4 Wing Quick Reaction Alert (QRA) Area– 4 Wing Cold Lake
4 Wing Cold Lake -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Medley Extension – 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Development of Hangars in the Quick Reaction Area – 4 Wing Cold Lake, Alberta
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 – Cold Lake Air Weapons Range
Cold Lake Air Weapons Range -
Relocation of the Deployable Maintenance Facility (DMF) Training Compound – 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
TERMINATED: Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Construction of a Retail Warehouse - 4 Wing Cold Lake
4 Wing Cold Lake -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation Firehall
Thunderchild First Nation Indian Reserve No. 115B -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild Community Walking Trail
Thunderchild First Nation -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Demolition of Building 598 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Upgrade of Main Refueling Station at Canadian Forces Base Wainwright (Alberta)
CFB Wainwright -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Demolition of Building 27 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Pathway to Learning
Saddle Lake No. 125 -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake Cree Nation Townsite Pumphouse Project
Townsite Pumphouse -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Pathway to Learning
Saddle Lake Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nations-Four Unit Housing Project 2024 2025
Cold Lake First Nations -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Powwow Arbour Construction
Pierceland -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation English Bay Gas Station Project
Cold Lake First Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 2: West Central region - Big Island Lake -
Big Island Lake Cree Nation Child and Family Service Centre
Big Island Lake Cree Territory -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Little Pine First Nation Health Clinic
Little Pine Indian Reserve No. 116 -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Frog Lake First Nation Askiy Hemp Limited Partnership Project
Frog Lake First Nation -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Energy East Project
Hardisty -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Hardisty -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Whitefish Lake First Nation Subdivision Lot Development
Whitefish Lake First Nation #128 -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
Ryley Facility Expansion Project
Ryley -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Ryley Biomedical Waste Incinerator Project
Ryley -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 7: West Central region - Thunderchild Fixed Wireless Tower -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Flying Dust Commercial Project
Meadow Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 1: Kikino Metis Settlement -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Beaver Lake Cree Nation Telus Telecommunications Tower
Beaver Lake Cree Nation -
Notice of Intent to Make a Determination - Start of Public Comment Period (TELUS Communications Inc (AB103721) Beaver Lake Indian Reserve No. 131 )
AB103721 - Beaver Lake Indian Reserve No. 131 -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 2: Kikino Metis Settlement -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Beaver Lake Cree Nation Medical Center
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Water Treatment Plant
Beaver Lake Cree Nation -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Culvert Clearing
Elk Island National Park -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Astotin Lake Dock Replacement
Elk Island National Park -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 3: Kikino Metis Settlement -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Lamont Railcar Storage Project
Northwest of Lamont -
Pedestrian Bridge Replacement on Simmons Trail
Elk Island National Park -
Decoy Beaver Dam Pilot Project for Beaver Coexistence Management
Elk Island National Park of Canada -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Walk Into History
Chitek Lake -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Construct a new Mock Jump Tower training facility – Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta
Cenovus Foster Creek - North Trunk Gate (NTG) -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Enbridge Northern Gateway Project
Bruderheim -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake Water Treatment Plant and Intake Design
Heart Lake First Nation -
New Fibre Installation
Project Site 2 - Heart Lake: -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake 3-Phase Powerline (Fortis# 500111166)
Heart Lake First Nation -
Heart Lake First Nation - Lift Station Replacement and Sanitary Sewer Line Install
Heart Lake First Nation -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Heart Lake ATCO Gas Distribution Project
Heart Lake First Nation -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Heart Lake First Nation - ATCO Gas Main Installation
Heart Lake First Nation -
Regional Assessment of Beaver Lake Cree Nation's Asserted Traditional Territory
Lac la Biche -
Josephburg Condensate Fractionation Project
22 kilometres northeast of Edmonton -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Cando Sturgeon Rail Terminal West Expansion Project
Sturgeon County -
Greenlight Electricity Centre Project
10 km east of Gibbons, Sturgeon County -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Beacon AI Centers Heartland Project
Sturgeon County, about 7 kilometres east of Gibbons -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Kerrobert