Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Thunderchild First Nation is proposed to operate a new lagoon as a two-cell facultative lagoon with a third separate cell to facilitate evaporation of the water treatment plant's concentrate stream (waste from the reverse osmosis system). The WTP process waste will be isolated to its own cell but will have the ability to be mixed into the storage cell of the lagoon, if required to dilute any residual biological loading. However, this is intended to be operated as an evaporative cell only. The primary cell of the facultative lagoon will only receive sewage from the truck dump pad shown on the plans, the access road and truck dump will require keyed access to the facility through the chain link fence gates. Sewage hauling from the 19 Thunderchild 115C homes' septic tanks will be trucked similar to the current arrangement, but be deposited at the proposed lagoon site at the dump structure. The primary cell provides primary treatment of the truck hauled sewage with aerobic bacteria processes. These processes use oxygen from wind and from photosynthesis of algae to break down the organic components of the sewage. After primary treatment, the wastewater transfers to the secondary (storage) cell to be stored until it is ready to be released on an annual or bi-annual basis. This storage cell is designed to hold 220 days of treated wastewater at the 20 year design threshold, accounting for population and water usage growth. All three lagoon and waste pond cells are lined with a fused high density polyethylene (HDPE) liner to ensure no untreated sewage will leach from the cells. An under-liner weeping tile underdrain network will allow for monitoring of the liner integrity. Once treated effluent is ready for release, typically in spring and / or fall, a valve will be opened to release the storage cell through the effluent structure and into an undeveloped tertiary storage wetland to the northeast. Treated effluent would either be evaporated from this wetland or slowly mix with the surrounding environment. Note that this released effluent is treated and regulated components will be tested during each release to ensure it meets the Provincial guidelines for biochemical oxygen demand (BOD), carbonaceous biochemical oxygen demand (CBOD), total suspended solids (TSS), total chlorine residual and unionized ammonia. The 220 days of storage allows for sufficient storage through winter months, should there be a longer winter after the prior fall release.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon | - | April 26, 2024 |
| 1 | Notice of Intent -Start of Public Comment Period | - | March 25, 2024 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Thunderchild First Nation (Saskatchewan)
-
Nature of Activity
- Waste Management
-
Assessment Status
Completed -
Start Date
2024-03-25 -
Proponent
Thunderchild First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
88446
Nearby assessments
...within 200 kilometres-
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild Community Walking Trail
Thunderchild First Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Thunderchild First Nation Firehall
Thunderchild First Nation Indian Reserve No. 115B -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
Flying Dust Commercial Project
Meadow Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
Makwa Sahgaiehcan First Nation Well Completion
Makwa Sahgaiehcan First Nation -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Makwa Sahgaiehcan First Nation Transfer Station
Makwa Sahgaiehcan First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Walk Into History
Chitek Lake -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Little Pine First Nation Health Clinic
Little Pine Indian Reserve No. 116 -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Onion Lake Family Services Inc. Child and Family Services Building
Onion Lake First Nation -
Onion Lake 3D 2026 Seismic Program
Onion Lake 3D 2026 Seismic Program -
Lloydminster Region Abandonment Project
Makaoo Indian Reserve 120 (Onion Lake Cree Nation) -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 7: West Central region - Thunderchild Fixed Wireless Tower -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Ministikwan Community Road Repairs
Ministikwan Lake Cree Nation -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Powwow Arbour Construction
Pierceland -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 2: West Central region - Big Island Lake -
Big Island Lake Cree Nation Child and Family Service Centre
Big Island Lake Cree Territory -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
OS-7257 Authorization to construct and operate a surface lease for an access road and for a multi-well oil pad
Frog Lake First Nation -
OS-7262 Authorization to Construct and Operate a Surface Lease for a multiwell oil pad
Frog Lake First Nation -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
OS-6826 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Frog Lake First Nation 4 Unit Housing Project
Frog Lake First Nation -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Frog Lake CFS Equine Centre
Frog Lake -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-6634 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
OS-7268 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad.
Frog Lake First Nation -
OS-6891 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
OS-7269 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
OS-7259 Authorization to construct and operate a surface lease for a multi-well oil pad
Frog Lake First Nation -
OS-6908 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7260 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7265 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7267 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7266 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7270 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
OS-7261 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
EX-9999 Authorization for a 3D seismic exploration program for oil and gas development
Frog Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
OS-7264 Authorization to Construct and Operate a Surface Lease for multiwell oil pad
Frog Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
OS-7263 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations 3-Phase Subdivision Development
Cold Lake First Nations -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Cold Lake First Nations-Four Unit Housing Project 2024 2025
Cold Lake First Nations -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
The Design and Construction (Modified Design Build) of the New 4 Wing Quick Reaction Alert (QRA) Area– 4 Wing Cold Lake
4 Wing Cold Lake -
Development of Hangars in the Quick Reaction Area – 4 Wing Cold Lake, Alberta
4 Wing Cold Lake -
Snow and Ice Clearing (SNIC) Expansion – 4 Wing Cold Lake
4 Wing Cold Lake -
Relocation of the Deployable Maintenance Facility (DMF) Training Compound – 4 Wing Cold Lake
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 – Cold Lake Air Weapons Range
Cold Lake Air Weapons Range -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Medley Extension – 4 Wing Cold Lake
4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
TERMINATED: Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Construction of a Retail Warehouse - 4 Wing Cold Lake
4 Wing Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Dore Lake Wharf Removal
Dore Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Cold Lake First Nation English Bay Gas Station Project
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Beaver dam and lodge removal
Prince Albert National Park -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
OS -7254 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad - Public Comments Invited
Kehewin Cree Nation -
Kehewin Cree Nation Telus Tower AB103726
Kehewin Cree Nation -
Telus telecommunications tower located on Kehewin Cree Nation located south of Bonnyville, AB
Telus telecommunications tower located on Kehewin Cree Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Underground CO2 Storage Hub -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Kehewin 123 -
Kehewin Lift Station Project
Kehewin Cree Nation -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Outhouse relocation
Prince Albert National Park of Canada -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
SaskPower Transformer Salvage
Prince Albert National Park -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Crean Channel Modification
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
Upgrades to Roads within Administrative Area- Garrison Wainwright
Garrison Wainwright -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
New Power Line Installation
CFB Suffield, Medicine Hat -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Construct Hazardous Waste Storage Facility - Garrison Wainwright
Garrison Wainwright -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Construct Building for Ammunition Salvage at Garrison Wainwright
Garrison Wainwright -
Remedial activities at a site impacted by Aqueous Film Forming Foam (AFFF) - Garrison Wainwright
Garrison Wainwright -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
Battle River Pumphouse Replacement - Garrison Wainwright
Garrison Wainwright -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
La Plonge Solar Project
English River First Nation Reserve -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Demolition of Building 27 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Demolition of Building 598 - Canadian Forces Base Wainwright
Canadian Forces Base Wainwright -
Upgrade of Main Refueling Station at Canadian Forces Base Wainwright (Alberta)
CFB Wainwright -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Kerrobert -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Montreal Lake RCMP New Detachment
Montreal Lake -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
New Fibre Installation
Saddle Lake 125 -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211