Twinning of the Trans-Canada Highway in Manitoba
Manitoba Transportation and Infrastructure is proposing to construct two new lanes along a 16-kilometre stretch of the Trans-Canada Highway, about five kilometres west of Provincial Road 301 and near the Manitoba/Ontario border in Whiteshell Provincial Park, Manitoba. As proposed, the Twinning of the Trans-Canada Highway Project in Manitoba would involve expanding the existing two-lane highway into four lanes, rebuilding or replacing two interchanges, upgrading access at Hunt Lake and Lyons Lake, and replacing the flyover of Provincial Road 301. Additionally, the project may include moving utilities, installing wildlife fencing and corridors, and building other related structures.
Please note the requestors also asked for consideration to designate the twinning of the Trans-Canada Highway in Ontario. The Impact Assessment Agency of Canada previously received a request to designate the Trans-Canada Highway Twinning Project located in Ontario and the Vice-President's Response was published in September 2024. This designation request will therefore focus on the Trans-Canada Highway Twinning Project located in Manitoba.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Request for designation of project | PDF (2.7 MB) | March 12, 2026 |
Contacts
Media RelationsImpact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Email: media@iaac-aeic.gc.ca
Twinning of the Trans-Canada Highway Project in Manitoba
Impact Assessment Agency of Canada
9700 Jasper Avenue, Suite 1145
Edmonton, Alberta T5J 4C3
Telephone: 780-495-2037
Email: pnr-rpn@iaac-aeic.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Whiteshell Provincial Park (Manitoba)
- Whiteshell Provincial Park (Manitoba)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
In progress -
Start Date
2026-04-08 -
Proponent
Manitoba Transportation and Infrastructure -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Request for designation -
Reference Number
90348
Nearby assessments
...within 200 kilometres-
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Subsurface Septic System Rehabilitation
Ontario -
Women's Lodge & Cultural Safe Space
Kejick -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Trans-Canada Highway Twinning Project
Kenora -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Wauzhushk Onigum Multi-Purpose Centre
Wauzhushk Onigum Multi-Purpose Centre -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Anishnaabeg of Naongashiing First Nation - Lot Servicing for Future Modular Homes
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing First Nation - Wastewater Treatment System Upgrades
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing Sewage Lagoon
Saug-A-Gaw-Sing Indian Reserve NO.1 -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Naotkamegwanning First Nation Wastewater Treatment Plant Replacement
Naotkamegwanning First Nation Reserve -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Northwest Angle #33 Dog Paw Water Treatment Plant Upgrade
Northwest Angle #33 First Nation No. 33A Dog Paw -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Big Grassy River First Nation - Micro Subdivision Development
Big Grassy River First Nation -
Vivian Sand Project
Springfield -
Big Grassy First Nation Cultural Space Building
Morson -
Big Grassy Waabanong Nibi Endaayang Building Construction
Big Grassy First Nation -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Rehabilitation of Watermains and Fire Pump Replacement
Crow Lake, ON -
Ojibways of Onigaming First Nation - Mikinaak Community Youth Cultural Centre Development
Ojibways of Onigaming -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Rainy River Project
Township of Chapple -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Energy East Project
Winnipeg -
Black River First Nation - Transitional Housing
Black River First Nation -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Black River Waste Transfer Station
Black River Reserve -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Partial Wharf Demolition, Lake Despair, Ontario
Lake Despair, Ontario -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Naicatchewenin First Nation - Lot Servicing Project for Future Houses
Naicatchewenin First Nation -
Naicatchewenin First Nation Culture and Learning Center Development
Naicatchewenin First Nation -
Naicatchewenin First Nation - 21 Units Lot Servicing Project
Naicatchewenin First Nation -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Shoreline Repairs and Improvements on Rainy Lake and Footprint River
Naicatchewenin First Nation -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
Caribou Street Culvert Replacement
Rainy River First Nation -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
New Fibre Installation
Project site 18 (Wabauskang No. 21) -
Wabauskang First Nation - Lot Servicing Project (20)
Wabauskang First Nation -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Mitaanjigamiing First Nation Subdivision Development
Mitaanjigamiing First Nation -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Fort Frances Tribal Area Health Services (FFTAHS) Transitional Housing Phase 1
Agency One First Nations -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water Wharf Construction
Hollow Water -
Goliath Gold Project
Dryden -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa – Wharf Replacement Project
Hnausa -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Wabigoon Lake Water Treatment System Expansion
Wabigoon Lake First Nation -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Winkler Port of Entry Redevelopment
Winkler Port of Entry