New (Multiple) Tower Construction & New Fibre Installation

New (Multiple) Tower Construction

Clear Sky Connections Inc. is proposing the construction of 3 telecommunication towers to provide high-speed internet access to Mosakahiken Cree Nation (Moose Lake). The towers will be approximately 10, 24.3 and 36.5 meters tall. Antennas will be mounted at the top of these towers. These antennas will operate in the 5.7 to 5.8GHz and 61 to 68 GHz frequency bands. All of the equipment necessary to operate this facility will be housed in a small equipment cabinet located on site. These towers may undergo future modifications or the addition/replacement of antennas.

 

New Fibre Installation

Clear Sky Connections Inc. plans to install underground fiber optic cabling, for Internet purposes, to anchor institutions in Mosakahiken Cree Nation (Moose Lake). The project involves the installation of approximately 68 km of underground fiber optic cable from Manitoba Hydro Telecom's meet-me-vault in The Pas to Moose Lake Tower 1 Central Office.

The cable is to be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments.

More


Latest update

Notice of Determination

September 12, 2024 - Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects.

This determination was based on a consideration of the following factors:

  • relevant potential environmental effects;
  • comments received from the public; and
  • technically and economically feasible mitigation measures.

Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, Innovation, Science and Economic Development Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.

Therefore, Innovation, Science and Economic Development Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.

Participate

Key documents

Key documents
Document number Document title File Date
3 Notice of Determination - September 12, 2024
2 Complete List of Locations - August 12, 2024
1 Notice of Intent to Make a Determination - Start of Public Comment Period - August 12, 2024

Contacts

Innovation, Science and Economic Development Canada
James Finch, Program Manager
235 Queen Street
1st Floor West Tower, CD Howe Building
Ottawa, Ontario K1A 0H5
Email: Get-connected-branchez-vous@ised-isde.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Mosakahiken Cree Nation (Moose Lake), Northern Manitoba (Manitoba)
  • Nature of Activity

    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2024-08-12
  • Proponent

    Clear Sky Connections Inc.
  • Authorities

    • Innovation, Science and Economic Development
  • Assessment Type

    Project on federal lands
  • Reference Number

    88805