Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
English River Enterprises Property Management LP is managing the construction of the wastewater treatment plant (WWTP) at the Grasswoods Reserve located immediately southwest of the City of Saskatoon. The proposed WWTP is currently in the construction phase that commenced in April 2021 with an anticipated completion date in May 2022. Once completed, the WWTP will receive sewage from the commercial development within the Reserve (subdivision) and treat it using an advanced membrane biological reactor treatment technology to produce high quality treated effluent.
The treated effluent will be disposed of via temporary storage for evaporation and irrigation. Storage will be via a pond (storm/effluent pond) proposed for the subdivision and to be constructed 40m north of the WWTP location. The storm/effluent pond and irrigation system are in the conceptual stage and will be constructed in the near future. This will be phased out such that the effluent will be allowed to fill and evaporate in the pond during the initial phase of development in the subdivision, Irrigation would be implemented when its determined to be needed as development increases within the subdivision.
Future disposal of effluent to the City of Saskatoon's (COS) storm sewer system at Preston Avenue is currently being reviewed with the City of Saskatoon and Water Security Agency.
As part of the WWTP, a septage receiving station (SRS) is being constructed adjacent to the WWTP. The SRS is intended to receive wastewater from septic systems via truck delivery. Wastewater samples from potential septic sources / customers will be tested and reviewed for acceptance prior to approving delivery. Continuous sampling of approval trucked wastewater will capture any deviance from the requirements. The wastewater collected at the SRS will be directed the WWTP's wet well, which has an equalization storage (pre-holding tank) capacity 180m3. This provides dampening of not only peak flows, but also peak loads.
Wastewater automatic sampling is also provided in the WWTP at two locations.
1) For sampling raw wastewater down stream of the 2mm fine screens and prior to the MBR treatment system.
2) For sampling treated effluent downstream of UV treatment.
The WWTP will be equipped with a laboratory with equipment to facilitate testing of the required wastewater constitutes including the typical regulated parameters i.e. BOD, TSS, TAN, TP, and coliforms.
Proposed New Infrastructure for the current WWTP in construction includes:
- Underground compartmentalized concrete substructure
- Pre-engineering building to sit on top of the substructure
- underground sewer pipelines that will direct sewage from the subdivision to the WWTP
- underground water line to services the WWTP
- utilities provided by Saskpower, Saskenergy, and Sasktel
- a septage receiving station to receive haul wastewater and divert it to the WWTP
- Standby diesel driver generator.
The overall scope of the wastewater system in the subdivision includes:
1. WWTP currently under construction
2. Initial treated effluent disposal by storage, evaporation and irrigation to be completed in the near future.
3. Ultimate effluent disposal through a forcemain to City of Saskatoon's storm system (connection at Preston Avenue)
Project activities for the WWTP include:
- Design Phase (Completed during 2019 environmental assessment)
- Wastewater Treatment and Disposal Agricultural Feasibility Study, December 2019 by CanNorth Environmental Services Ltd.
- Geotechnical Investigation, September 2020 by MPE Engineering Ltd.
- Effluent Disposal Strategy and DUIS, November 202 by MPE Engineering Ltd.
- Design Basis Memorandum, December 2020 by MPE Engineering Ltd.
- Issue for Construction Specifications for the WWTP
- Issue for Construction Drawings for the WWTP
- SUEZ final proposal for their MBR treatment system
- Construction Phase (Ongoing)
- WWTP (including the SRS) is currently under construction by Wright Construction Western Inc.
- Completion is projected for May 2022
The near future effluent disposal by storage, evaporation and irrigation portion will include:
- Construction of a pond that will server a dual purpose: 1) storm pond servicing the subdivision, and 2) effluent storage. Effluent will be allowed to evaporate initially and monitored over time to determine when irrigation is determined to be needed.
- Construction of an irrigation system to consist of piping and pumping to draw water from the pond and irrigate the immediate area east and north of the proposed pond location. Irrigation feasibility was completed as part of the WWTP design phase.
Ultimate effluent disposal will be via a pumping and piping system to the City of Saskatoon's storm sewer system at Preston Avenue.
For the WWTP construction project, excavated material during construction will be used for final site grading. no hazardous waste is expected from the site. Routine construction waste material will be managed by the contractor and supervised by the owner's representatives to ensure proper collection and disposal to a licensed facility.
One the WWTP is in operation, waste activated sludge from the MBR treatment system will be thickened (TWAS) and stored in an underground compartment incorporated with the WWTP. The storage volume allows for detention time of approximately 2 months to being and 1.5 months in the future. The TWAS will be pumped and tracked to the City of Saskatoon's wastewater treatment facility for further processing and disposal. The City is acceptable with the expected TWAS consistency and volumes and are currently working out the delivery logistics with ERPM.
The following documentation represents the data and planning taken place for this proposed project.
- Agricultural Feasibility Report for Irrigation, December 2019 by CanNorth Environmental Services Limited Partnership
- Geotechnical Investigation, September 2020 by MPE Engineering Ltd.
- Effluent Disposal Strategy and DUIS, November 2020 by MPE Engineering Ltd.
- Design Basis Memorandum, December 2020 by MPE Engineering Ltd.
- Issue for Construction Specifications for the WWTP
- Issue for Construction Drawings for the WWTP
- SUEZ Final Proposal (English River (SK)_Bid to Contractors rev 1 - 20200113 final version), October 2020 by SUEZ
- TM01.ERPM Grasswoods WWTF Forcemain
- TM02.English River Stormwater Pond Assessment
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 11 | Notice of determination for the Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain | - | July 13, 2021 |
| 1 | Public Comment Period on Intent to Make a Determination | - | June 11, 2021 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Grasswoods IR 192J (Saskatchewan)
-
Nature of Activity
- Water Management
- Waste Management
-
Assessment Status
Completed -
Start Date
2021-06-11 -
Proponent
English River First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81699
Nearby assessments
...within 200 kilometres-
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Dakota Springs Spa
Whitecap IR #94 -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Aspen Power Station Project
Lanigan -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Lake Diefenbaker Irrigation Expansion Projects
Lake Diefenbaker -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Beaver dam and lodge removal
Prince Albert National Park -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
George Gordon First Nation Fire Hall
George Gordon First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Sweetgrass New School
Sweetgrass IR 113 -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Muskowekwan Potash Mine Project
Lestock -
SaskPower Transformer Salvage
Prince Albert National Park -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Kerrobert -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
Relocate RV Compound - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Runway Rehabilitation - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw
15 Wing Moose Jaw -
Remediate Sites and Construct Buildings for Future Aircrew Training (FAcT) Program- 15 Wing Moose Jaw
15 Wing Moose Jaw -
Construct North Access Road - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Sanitary Force Main Pipeline Replacement Design and Construction - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B