GCT#3 Representative Services plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in Shoal Lake No.40, Northwest Angle No.33, Lake of the Woods No. 37 (Animakee Wa Zhing #37), Northwest Bay (Naicatchewenin), Eagle Lake, Rainy River First Nations, Couchiching First Nation, Kenora No. 38B (Anishinabe of Wauzhushk Onigum), Grassy Narrows First Nation, Niisaachewan Anishinaabe Nation, Wabaseemoong Independent Nations, Lac Des Mille Lacs, Naotkamegwanning, Whitefish Bay No. 34A (Animakee Wa Zhing #37), Gakijiwanong Anishinaabe Nation, Washagamis Bay, Whitefish Bay No. 33A (Northwest Angle No. 33),Wabauskang No. 21 (Wabauskang First Nation), Seine River No. 23A (Seine River Nation), Wabigoon Lake No. 27 (Wabigoon Lake Ojibway Nation), Saug-A-Gaw-Sing No. 1 (Anishnaabeg of Naongashiing), Big Grassy River No. 35G (Big Grassy), Sabaskong Bay No. 35D (Ojibways of Onigaming First Nation), Shoal Lake No. 39 (Iskatewizaagegan #39 Independent First nation). The project involves the installation of approximately 538.31 km of underground, submarine and aerial fiber optic cable from the intersection of McKay Road South Nezaadikaang and the entrance to the Lac des Mille Lacs community to the intersection of Tony's Road and Main Road West the in the Wabaseemoong Independent Nations community.
The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, but will be suspended on support structures to connect to residential homes and businesses.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 5 | Notice of Determination | - | June 4, 2024 |
| 4 | Complete List of Locations | - | May 3, 2024 |
| 3 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | May 1, 2024 |
Contacts
Innovation, Science and Economic Development CanadaSagal Mohamoud, Program Officer, Connected Canada Branch
235 Queen Street
1st Floor West Tower, CD Howe Building
Ottawa, Ontario K1A 0H5
Email: Get-connected-branchez-vous@ised-isde.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Project site 08 (Kenora No. 38B) (Ontario)
- Project site 11 (Wabaseemoong Independent Nations) (Ontario)
- Project site 15 (Gakijiwanong Anishinaabe Nation) (Ontario)
- Project site 18 (Wabauskang No. 21) (Ontario)
- Project site 24 (Shoal Lake No.39) (Ontario)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2024-05-01 -
Proponent
GCT#3 Representative Services -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
88528
Nearby assessments
...within 200 kilometres-
Women's Lodge & Cultural Safe Space
Kejick -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Subsurface Septic System Rehabilitation
Ontario -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Trans-Canada Highway Twinning Project
Kenora -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Wauzhushk Onigum Multi-Purpose Centre
Wauzhushk Onigum Multi-Purpose Centre -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Anishnaabeg of Naongashiing First Nation - Lot Servicing for Future Modular Homes
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing First Nation - Wastewater Treatment System Upgrades
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing Sewage Lagoon
Saug-A-Gaw-Sing Indian Reserve NO.1 -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Big Grassy River First Nation - Micro Subdivision Development
Big Grassy River First Nation -
Big Grassy First Nation Cultural Space Building
Morson -
Big Grassy Waabanong Nibi Endaayang Building Construction
Big Grassy First Nation -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Naotkamegwanning First Nation Wastewater Treatment Plant Replacement
Naotkamegwanning First Nation Reserve -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Northwest Angle #33 Dog Paw Water Treatment Plant Upgrade
Northwest Angle #33 First Nation No. 33A Dog Paw -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Rehabilitation of Watermains and Fire Pump Replacement
Crow Lake, ON -
Ojibways of Onigaming First Nation - Mikinaak Community Youth Cultural Centre Development
Ojibways of Onigaming -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Vivian Sand Project
Springfield -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
Rainy River Project
Township of Chapple -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Partial Wharf Demolition, Lake Despair, Ontario
Lake Despair, Ontario -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Caribou Street Culvert Replacement
Rainy River First Nation -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Naicatchewenin First Nation - Lot Servicing Project for Future Houses
Naicatchewenin First Nation -
Naicatchewenin First Nation - 21 Units Lot Servicing Project
Naicatchewenin First Nation -
Naicatchewenin First Nation Culture and Learning Center Development
Naicatchewenin First Nation -
Shoreline Repairs and Improvements on Rainy Lake and Footprint River
Naicatchewenin First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Energy East Project
Winnipeg -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Black River First Nation - Transitional Housing
Black River First Nation -
Black River Waste Transfer Station
Black River Reserve -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Mitaanjigamiing First Nation Subdivision Development
Mitaanjigamiing First Nation -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Wabauskang First Nation - Lot Servicing Project (20)
Wabauskang First Nation -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Fort Frances Tribal Area Health Services (FFTAHS) Transitional Housing Phase 1
Agency One First Nations -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Goliath Gold Project
Dryden -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
Wabigoon Lake Water Treatment System Expansion
Wabigoon Lake First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water Wharf Construction
Hollow Water -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa – Wharf Replacement Project
Hnausa -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
LSFN Burial Site Mapping
Lac Seul First Nation -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Josephine Cone Mine Project
Ignace -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Deep Geological Repository (DGR) for Canada's Used Nuclear Fuel Project
43 km northwest of Ignace -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Whitefish Tower -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #1 -
Lac Seul First Nation Broadband Upgrade
Lac Seul First Nation -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Bending Lake Iron Project
49 kilometres southwest of Ignace -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Kejick Bay North Tower -
Lac Seul First Nation - Lot Servicing Project
Lac Seul First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #2 -
Frenchman's Head Sewage Treatment Plant and Collection System (Lac Seul)
Frenchman's Head (Lac Seul) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Hudson Tower -
Seine River First Nation Standpipe Replacement
Seine River First Nation -
Abandoned Fuel Tank Decommissioning
Seine River First Nation -
Seine River First Nation - Water Treatment Plant Construction Project
Seine River First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake Wireless Tower -
Demolition of Six (6) buildings associated with the former Old Zone Hospital in Sioux Lookout, Ontario
Former Sioux Lookout Zone Hospital Site, 82,76 & 85 - Seventh Avenue, 9 - Sixth Avenue, and 90.5 Queen Street, Sioux Lookout, Ontario -
Griffith Iron Ore Redevelopment Project
Ear Falls -
Gakijiwanong Anishinaabe Nation - Wellness Centre Development
Gakijiwanong Anishinaabe Nation -
Lac La Croix First Nation Former School Area Remediation
Lac La Croix First Nation -
Gakijiwanong Anishnaabe - Water Treatment Plant Upgrades
Gakijiwanong Anishnaabe -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
Pikangikum First Nation - 10 Unit Residential Construction Project
Pikangikum First Nation -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Hammond Reef Gold Project
Mitta Lake -
Springpole Gold Project
110 kilometres northeast of Red Lake -
New Fibre Installation / Upgrade Multiple Towers
North Spirit Lake PoP -
Slate Falls Nation - Lot Servicing for future houses
Slate Falls Nation -
Peguis First Nation Landfill Expansion
Peguis First Nation -
Ojibway Nation of Saugeen Timber Harvesting
Ojibway Nation of Saugeen -
Cat Lake First Nation - Subdivision Development Project
Cat Lake First Nation -
Cat Lake First Nation - Lot Servicing for future houses
Cat Lake First Nation -
Ojibway Nation of Saugeen Fibre Construction
Ojibway Nation of Saugeen -
Lac Des Mille Lac First Nation Residential Sub Division
Lac Des Mille Lac First Nation -
Range and Training Area - Thunder Bay Region
Upsala -
Pigeon River Drilled Well Groundwater Supply
CBSA Pigeon River