SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The purpose of the Project is for SaskPower to replace aging overhead powerline infrastructure in order to maintain the integrity of power service for existing and future customers. The Project is situated within cultivated and grassland areas, within existing SaskPower overhead powerline rights-of-way (ROW), and within road allowances adjacent existing roads. A portion of the Project will traverse four quarter sections of land within the Star Blanket First Nation Reserve on pasture, hay, and grass land uses.
The proposed Project is located on or near four quarter sections of Star Blanket First Nation Reserve land with legal land descriptions as follows:
* SW-32-22-08-W2M (construction in the developed road ROW to the south)
* SE-32-22-08-W2M (construction in the developed road ROW to the south and east)
* SW-33-22-08-W2M (construction in the developed road ROW to the south and west)
* NW-33-22-08-W2M (construction in the developed road ROW to the west, salvage on the northern portion of the quarter section, and underground line install to the residence located on the west side of the quarter section).
The project includes vegetation clearing, the salvage of existing wood poles with associated hardware and overhead conductor, and the installation of wood poles with associated hardware and overhead conductors. The Project will be accessed from locations within road allowances and SaskPower ROW. The removal of trees and shrubs is required for safe equipment access and tree-fall clearance to reduce the risk of damage to the overhead powerline and the potential for fire due to tree contact with the overhead conductor.
The Project area contains a creek crossing in two locations on Pearl Creek and multiple Class I to Class IV wetlands located within 30 metres of the Project area. The creek has been deemed narrow enough that SaskPower proposes to span it with an overhead line. The ground work near the creek is planned to be completed in the road ROW.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the SaskPower Rural Rebuild 2D-41 Birmingham Southwest | - | July 2, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | June 2, 2025 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Star Blanket Indian Reserve No. 83-D (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2025-06-02 -
Proponent
SaskPower -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89588
Nearby assessments
...within 200 kilometres-
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Zagime Community Center
Zagime IR #74-3 -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
Zagime Anishinabek School
Sakimay IR 74 -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
New Fibre Installation
Project Site 2: Cowessess -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
New (Multiple) Tower Construction
School Tower -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Potash Mine Project
Lestock -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
George Gordon First Nation Fire Hall
George Gordon First Nation -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Awasis Solar Project
SE 7-17-18 W2 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
The Key First Nation Firehall
The Key First Nation -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
Runway De-Icing Liquid Storage Tank
Regina -
Runway 13-31 Rehabilitation
Regina -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Energy East Project
Moosomin -
New Fibre Installation
Project Site 1: White Bear -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
White Bear First Nation Wastewater Upgrade Project
White Bear First Nation -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
White Bear First Nation Community Spray Park
White Bear 70 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Tower Hill VHF Tower
Riding Mountain National Park -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Runway Rehabilitation of 11R-29L - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Aspen Power Station Project
Lanigan -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
Relocate RV Compound - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Sanitary Force Main Pipeline Replacement Design and Construction - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw
15 Wing Moose Jaw -
Construct North Access Road - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Runway Rehabilitation - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Remediate Sites and Construct Buildings for Future Aircrew Training (FAcT) Program- 15 Wing Moose Jaw
15 Wing Moose Jaw -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan