Sagkeeng First Nation - Shoreline Stabilization - Segment 4
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Erosion along the shoreline at Traverse Bay has been well documented over the last 145 years and public assets (houses, roads, utilities, land, etc.) are at risk due to their proximity to the actively eroding bank. The continued loss of these assets along the shoreline and the associated social consequences are inevitable unless erosion protection works are implemented. The consequences of delaying the work will result in continued loss of property, and the disruption to Provincial Trunk Highway 11 (PTH 11) and associated utilities.
Shoreline stabilization Project Phases I and II included the work identified in the 2008 functional design report prepared by UMA Engineering Ltd. for placement of hard armouring along approximately 3,264 meters of shoreline between Catfish Creek near the west limit of the Fort Alexander Reserve and Bruyere Point near the mouth of the Winnipeg River at Lake Winnipeg.
In 2010, 2011, and 2014, Shoreline Stabilization Phase I project total of approximately 1,100 meters of hard armouring was placed along the shoreline at greatest risk. Traverse Bay Shoreline Stabilization Phase II project (I/O# AS934, CS934) was substantially completed in 2019 which consisted of the design and implementation of bank erosion protection using large rip rap as identified in the 2008 functional design report prepared by UMA Engineering Ltd. The Phase II portion of the stabilization project included the remaining unprotected 2,164 meters of the project area.
Following the most recent storm in July 2022, Emergency Repairs project was undertaken for maintenance, but also minor repairs of several locations (supplemental riprap placement) and significant repairs (reconstruction) in one area that lost a portion of the structural integrity of the protection. In particular, the repairs tend to be in areas that were recently constructed in 2019 as this was the first major windstorm these areas have been subjected to.
Phase III works are split into three Work Packages based on their readiness for execution. Work Package 1 includes "Bruyere Point - South"; Work Package 2 includes "Traverse Bay - Section 4", "Site A - Cheryl Guilmond Site", and "Site B - South of Bruyere Point Adjacent to PTH 11"; and Work Package 3 includes "Site C - Art Jr. Boubard", "Culturally significant Site - Treaty Point", and "Bunn Area".
Current works for this review (Bruyere Point extension - Work Package 1) will occur in 2024-2025 (March 2025), while the remainder of the Phase III work is anticipated for 2025-26 (Work Packages 2 and 3). This work (Bruyere Point extension) will involve the construction of erosion protection works along Bruyere Point, which is considered an extension of previously completed works within Segment 5 that were originally protected in 2011. At this location (50.626664, -96.322440), 165m of shoreline directly bordering residential property, from the east end of Bruyere Point to the eastern edge of the sandbar, is inneed of repair. This section is directly adjacent to the previously completed works along Segment 5, although not subject to as high of wave energy. The 165m stretch is also part of this lake system, and still experiences significant erosion pressures due to its positioning along the shoreline. These works have previously been subject to ISC review in 2020 (Traverse Bay Shoreline Stabilization Phase II) and was planned to be constructed as part of the Phase II work with the remaining budget; however, a construction blockade put in place by the contractor prevented construction from taking place at that time. This project has therefore been carried over into another ISC funded project (Phase III). Due to potential funding limitations, stabilization efforts may be limited to less than the full 165m section, and thus the tender package estimates 80m of shoreline protection (Class B estimate of 75-85m). The planned work will begin from the existing riprap along the northwest side of the segment with the intention of completing as much of the 165m as possible. This is due to the erosion protection benefit at Bruyere Point gradually diminishing along the 165 m stretch, with the greatest effect towards the northwest end. The lake environment of the Winnipeg River runs from the mouth at Lake Winnipeg upstream to the rapids (hydraulic control) which is 2.7 km downstream of the Pine Falls Generating Station. Water levels along this reach of river are governed solely by the elevation of Lake Winnipeg. As a result, the stabilization work (detailed below) has been designed to withstand the hydrology of this lake environment and the ER PDF reflects the analysis of effects and proposed mitigation measures for this area.
The proposed works will be based on the same engineered design, will follow all project tender specifications and environmental mitigation measures, and will overseen by the engineer as the 2018/2019 and 2020 work (Bruyere Point Design Brief, 2025). Construction involves the following in frozen conditions: trimming the over-steepened, eroding upper bank to a stable slope
3.5H:1V); excavation of a key trench at the base of the slope; and, installation of non-woven geotextile, granular bedding and riprap to engineered specifications. Salvaged sand will be used to restore the beach at the toe of the riprap blanket. Site restoration will be completed in summer, including placement of topsoil and seed over exposed soils above the high water mark. Erosion and sediment control measures, including woven straw blankets on sloped areas, will be implemented as appropriate throughout the project. All work will be done above the water (lake ice) level, without disturbing wetted habitat.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | April 16, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | March 17, 2025 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Sagkeeng First Nation (Manitoba)
-
Nature of Activity
- Other, not otherwise specified
- Dams and reservoirs
- Maintenance activities (fences, walls)
- Soil management
-
Assessment Status
Completed -
Start Date
2025-03-17 -
Proponent
Sagkeeng First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89367
Nearby assessments
...within 200 kilometres-
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Black River First Nation - Transitional Housing
Black River First Nation -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Black River Waste Transfer Station
Black River Reserve -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa – Wharf Replacement Project
Hnausa -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Hollow Water Wharf Construction
Hollow Water -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Vivian Sand Project
Springfield -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Energy East Project
Winnipeg -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Launch Ramp Replacement, Pine Dock, Manitoba
Pine Dock -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Launch Ramp Replacement, Matheson Island, Manitoba
Matheson Island -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Subsurface Septic System Rehabilitation
Ontario -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Women's Lodge & Cultural Safe Space
Kejick -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Trans-Canada Highway Twinning Project
Kenora -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
New Fibre Installation
Project site: Various parts of Manitoba -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Wauzhushk Onigum Multi-Purpose Centre
Wauzhushk Onigum Multi-Purpose Centre -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation