Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Canadian Wildlife Service must determine whether the proposed Rockwood National Wildlife Area removal of the water control structure located within the boundaries of Rockwood National Wildlife Area, Manitoba is likely to cause significant adverse environmental effects.
To help inform this determination, the Canadian Wildlife Service is inviting comments from the public respecting that determination. All comments received will be considered public [and may be posted online]. For more information, individuals should consult the Privacy Notice https://iaacaeic.gc.ca/050/evaluations/protection on the Registry website. Written comments must be submitted by 27 July, 2022 to:
Molly Kirk – Head, Protected Areas Unit
115 Perimeter Road, Saskatoon, Saskatchewan, S7N 0X4
306-241-7161 (cell)
The Proposed Project
Ducks Unlimited Canada has proposed to conduct a project on Rockwood National Wildlife Area to remove the existing water control structure. Rockwood NWA was established in 1981 to utilize the periodic flooding from the adjacent Department of Fisheries and Oceans' Rockwood Fish Hatchery land to provide nesting and staging habitat for migratory birds. Upon the wildlife area's creation, Ducks Unlimited Canada agreed to design, construct and manage a berm around the property to contain water with a flap-gate culvert to retain and regulate flow from Rockwood NWA into neighbouring drainage canals.
The proposed project would consist of permanently breaching the east side dyke in an area that has been functionally breached since 2003. The project would be conducted at the location of 50.28321, -97.15410. The project would border the road allowance to the east of the NWA. The flap-gate culvert's dimensions are 24" x 28', with a west invert of 754.23' and an east invert of 753.83' above sea level. Prior to 2003, the purpose of this control structure was to divert water into the impoundment from the ditch and mitigate the outflow from the marsh. Since 2003, the water control has been left open and has not been used to alter water levels. Removal of the structure would leave the invert elevations similar to the elevations of the existing infrastructure so the water flow regime would stay roughly the same. The area of the current structure would be renaturalized by installing fully photodegradable erosion control blankets and seeding plants similar to what grows on the surrounding berm.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Determination | - | August 22, 2022 |
Contacts
Protected Areas UnitEnvironment and Climate Change Canada/Canadian Wildlife Service
Molly Kirk, Head, Protected Areas Unit
115 Perimeter Road
Saskatoon, Saskatchewan S7N 0X4
Telephone: 306-241-7161
Email: molly.kirk@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Rockwood National Wildlife Area (Manitoba)
-
Nature of Activity
- Water Management
- Remediation and conservation
-
Assessment Status
Completed -
Start Date
2022-06-24 -
Proponent
Ducks Unlimited Canada -
Authorities
- Environment and Climate Change Canada
-
Assessment Type
Project on federal lands -
Reference Number
83735
Nearby assessments
...within 200 kilometres-
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
Energy East Project
Winnipeg -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Vivian Sand Project
Springfield -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa – Wharf Replacement Project
Hnausa -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation - Transitional Housing
Black River First Nation -
Black River Waste Transfer Station
Black River Reserve -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Hollow Water Wharf Construction
Hollow Water -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
New Fibre Installation
Project site: Various parts of Manitoba -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Morden Pesticide and Chemical Building Project
Morden -
Stanley Trail Association Community Pathway Project
Morden -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Morden -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
Launch Ramp Replacement, Pine Dock, Manitoba
Pine Dock -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Subsurface Septic System Rehabilitation
Ontario -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Launch Ramp Replacement, Matheson Island, Manitoba
Matheson Island -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Women's Lodge & Cultural Safe Space
Kejick -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
East Trails Project - East Gate
Riding Mountain National Park -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Trans-Canada Highway Twinning Project
Kenora -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario