Meadow Lake Tribal Council: Solar Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Meadow Lake Tribal Council Solar Project (the Project) is being developed by the MLTC Solar Energy LP (MLTCLP) on Flying Dust First Nation reserve land. The proposed Project includes the construction, installation and operation of an 816kW solar energy farm to generate electricity for the provincial power supply. The Project will include more than 3,000 bifacial solar module panels to be installed on the fixed-tilled, ground-mounted racking system. The chosen site includes portions of NE1/4-31-09-09 about 18 kilometres northwest of Stoughton, Saskatchewan. The site contains annual row crops, and has been used as cultivated cropland since prior to 2008.
The scope of the project includes the following activities:
- Site clearing (e.g., removal of stubble remaining from agricultural harvest);
- Site leveling and grading;
- Pile system preparation;
- Racking system and solar panel installation
- Excavation of trenches for the collector lines and installation of a collection system;
- Installation of an inverter station;
- Construction of access roads, perimeter fencing, and lighting;
- Construction of a control building and a maintenance building;
- Construction of a transmission line; and,
- Grid connection
This project will create a long term revenue stream for the community which helps the community achieve their goal of self-sustainability. The project will also bring ancillary economic benefits to the MLTCII and its members in the form employment and subcontracting opportunities.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Determination | - | February 16, 2022 |
Contacts
Walker SmithNatural Resources Canada
Walker Smith, Environmental Assessment Officer
Telephone: 613-447-2892
Email: walker.smith@nrcan-rncan.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- NE¼-31-09-09 W2M (Saskatchewan)
-
Nature of Activity
- Alternative Energy
-
Assessment Status
Completed -
Start Date
2021-11-10 -
Proponent
MLTC Solar Energy LP -
Authorities
- Natural Resources Canada
-
Assessment Type
Project on federal lands -
Reference Number
83153
Nearby assessments
...within 200 kilometres-
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
White Bear First Nation Wastewater Upgrade Project
White Bear First Nation -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
New Fibre Installation
Project Site 1: White Bear -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
White Bear First Nation Community Spray Park
White Bear 70 -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Zagime Anishinabek School
Sakimay IR 74 -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Estevan Port of Entry Redevelopment
Estevan Port of Entry -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
WireIE (Canada) Inc. - Radiocommunication Tower - Torquay Border Crossing, Hwy 350, Torquay SK
Torquay Border Crossing -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
New Fibre Installation
Project Site 2: Cowessess -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
Oungre Port of Entry Redevelopment
Oungre Port of Entry -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
North Portal Septic Tank Replacement
North Portal -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
WireIE (Canada) Inc. - Radiocommunication Tower - Northgate Border Crossing, Hwy 9, Northgate SK
Northgate Border Crossing -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Awasis Solar Project
SE 7-17-18 W2 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Runway De-Icing Liquid Storage Tank
Regina -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Runway 13-31 Rehabilitation
Regina -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
New (Multiple) Tower Construction
School Tower -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
WireIE (Canada) Inc. - Antenna Structure - Regway Border Crossing, Hwy 6, Regway SK
Regway Border Crossing -
Regway Port of Entry Redevelopment
Regway Port of Entry -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Energy East Project
Moosomin -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Zagime Community Center
Zagime IR #74-3 -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Runway Rehabilitation of 11R-29L - 15 Wing Moose Jaw
15 Wing Moose Jaw -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Construct North Access Road - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw
15 Wing Moose Jaw -
Runway Rehabilitation - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Sanitary Force Main Pipeline Replacement Design and Construction - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Remediate Sites and Construct Buildings for Future Aircrew Training (FAcT) Program- 15 Wing Moose Jaw
15 Wing Moose Jaw -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Relocate RV Compound - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
WireIE (Canada) Inc. - Antenna Structure - Coronach Border Crossing, Highway 36, P.O. Box 189, Coronach, SK
Coronach Border Crossing -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Fire Hall
George Gordon First Nation -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Muskowekwan Potash Mine Project
Lestock -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation