Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Natural Gas Low Pressure Distribution Infrastructure - Permit for the whole of Okanese Indian Reserve No. 82 for as long as needed. SaskEnergy may install and maintain natural gas natural gas mains and any supporting infrastructure required to support natural gas distribution services (e.g. meter stations, valves, tie-ins etc.) on above noted reserves. The majority of work will involve the installation, maintenance, repair and decommissioning of mains noted in Okanese Indian Reserve No. 82.
Typical work on these projects includes but is not limited to: initial survey of project area, scoping of work, bell hole excavation, exposure of existing mains for tie-ins, installation of mains via trenching/ploughing/directional drilling/boring or other standard means, tie-ins, backfill and re-contouring of excavated or disturbed areas, re-seeding as required, and final clean up of the project area.
Infrastructure installations may also involve topsoil stripping, graveling and grading, building of approaches as required. SaskEnergy infrastructure may be installed adjacent to or within utility corridors that may include power, telecommunications, natural gas transmission, oil, water and/or natural gas distribution. The mains will primarily be installed in land areas that have been subject to previous disturbance, including but not limited to previously cleared cultivated and pasture lands, land developed for residential and rural residential use, urban areas, road verges, and industrial lands. However, portions may also traverse uncleared and/or undeveloped lands and natural landscapes with native plant and wildlife communities.
All construction will follow established standards current at the time of project installation. Potential waste generation includes products of hydrocarbon combustion (e.g. Carbon dioxide), drilling mud (bentonite), potential spills/leaks of materials not limited to hydrocarbons, lubricants, antifreezes and greases typically used in construction equipment. Spill prevention will be emphasized, spill kits used, and clean up and reporting completed following best practices. The Land Manager for the listed IRs will be made aware of all spills.
All SaskEnergy work will involve natural gas and follows established safety standards.
A separate application for a blanket permit for subsequent mains, services and infrastructure will follow upon the quote acceptance by the customer.
All work will be completed in accordance with the SaskEnergy Environmental Protection Guidelines and will adhere to the Migratory Bird Convention Act and Regulations. Any work for which the Nation requests engagement, or is of a scale that reasonably warrants wider engagement, will be submitted under separate application.
Portions of proposed route which cross heritage sensitive areas and may have the potential to impact cultural, historical or archaeological resources will identified and suitable mitigation will be determined in with the input of the Land Manager for Okanese First Nation.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82 | - | September 23, 2024 |
| 1 | Notice of Intent -Start of Public Comment Period | - | August 22, 2024 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Okanese First Nation (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2024-08-22 -
Proponent
SaskEnergy -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
88847
Nearby assessments
...within 200 kilometres-
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
New (Multiple) Tower Construction
School Tower -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
Zagime Anishinabek School
Sakimay IR 74 -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Muskowekwan Potash Mine Project
Lestock -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
New Fibre Installation
Project Site 2: Cowessess -
Zagime Community Center
Zagime IR #74-3 -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
George Gordon First Nation Fire Hall
George Gordon First Nation -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Awasis Solar Project
SE 7-17-18 W2 -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Runway De-Icing Liquid Storage Tank
Regina -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Runway 13-31 Rehabilitation
Regina -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
The Key First Nation Firehall
The Key First Nation -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
New Fibre Installation
Project Site 1: White Bear -
White Bear First Nation Wastewater Upgrade Project
White Bear First Nation -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
White Bear First Nation Community Spray Park
White Bear 70 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Energy East Project
Moosomin -
Runway Rehabilitation of 11R-29L - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Relocate RV Compound - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Runway Rehabilitation - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Sanitary Force Main Pipeline Replacement Design and Construction - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Construct North Access Road - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Remediate Sites and Construct Buildings for Future Aircrew Training (FAcT) Program- 15 Wing Moose Jaw
15 Wing Moose Jaw -
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw
15 Wing Moose Jaw -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Aspen Power Station Project
Lanigan -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
Tower Hill VHF Tower
Riding Mountain National Park -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
Menzies Prescribed Fire
Riding Mountain National Park of Canada