Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
A group of landowners holding property in the area are proposing to expand an existing drainage network for the diversion of surface water to Saline Lake from agricultural lands. Located approximately 100 kilometres northwest of Yorkton, Saskatchewan, the project would operate indefinitely and facilitate the diversion of an additional 166,751 cubic metres of water per year, approximately a six percent increase in capacity of the existing network.
Latest update
December 13, 2019 – The Minister of Environment and Climate Change has determined that the Saline Lake Drainage Network Project proposed by a group of landowners holding property in the area, does not warrant designation under the Impact Assessment Act. The reasons for the Minister’s determination are provided in the Minister’s response.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Analysis Report | PDF (1.5 MB) | December 13, 2019 |
| 1 | Minister's response | - | December 13, 2019 |
Contacts
Impact Assessment Agency of Canada160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca
Media Relations
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Email: media@iaac-aeic.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- 100 kilometres northwest of Yorkton (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2019-08-28 -
Proponent
A group of landowners holding property in the area -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Request for designation not applicable -
Reference Number
80331
Nearby assessments
...within 200 kilometres-
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Muskowekwan Potash Mine Project
Lestock -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
The Key First Nation Firehall
The Key First Nation -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
Key Junction Gas Bar & Confectionery
The Key First Nation -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
George Gordon First Nation Fire Hall
George Gordon First Nation -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Zagime Community Center
Zagime IR #74-3 -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
New (Multiple) Tower Construction
School Tower -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Aspen Power Station Project
Lanigan -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek School
Sakimay IR 74 -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
New Fibre Installation
Project Site 2: Cowessess -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Awasis Solar Project
SE 7-17-18 W2 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Runway De-Icing Liquid Storage Tank
Regina -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
Runway 13-31 Rehabilitation
Regina -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Tower Hill VHF Tower
Riding Mountain National Park -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth River Dike Extension
Red Earth IR 29A -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation