Waywayseecappo First Nation - School Water Treatment Plant Recovery
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Waywayseecappo School WTP was destroyed by a fire. WTP site is located approximately 120m NE of the school. The
foundation and below grade cisterns remain and have undergone engineering assessment. Existing process equipment within the
below grade pump, mechanical, and electrical room will be replaced. All WTP debris was taken to the Waywayseecappo Dump
for disposal. The WTP supplies potable water to 500 staff and students as well as 600 surrounding residences via a truck fill. The
objective is to return the potable water supply on an emergent basis. Waywayseecappo First Nation is currently proposing to rehabilitate the existing
foundation which includes cleansing, minor remediation, and resurfacing. A new wood frame superstructure is proposed for
construction over the existing foundation complete with metal cladding. In order to expedite returning the water supply to the
community, a temporary softener and chlorination treatment system will be installed while the design of a reverse osmosis (RO)
treatment system is completed.
Latest update
Participate
Contacts
Indigenous Services CanadaLori Bueckert, Environmental Analyst
365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-227-3254
Email: lori.bueckert@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Waywayseecappo First Nation (Manitoba)
-
Nature of Activity
- Building and Property Development
- Water Management
-
Assessment Status
In progress -
Start Date
2026-02-11 -
Proponent
Waywayseecappo First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90225
Nearby assessments
...within 200 kilometres-
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Tower Hill VHF Tower
Riding Mountain National Park -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Smallmouth Bass Project
Riding Mountain National Park -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Tiger Salamander Crossing
Riding Mountain National Park -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Mooswa East Water Line
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
New Fibre Installation
Riding Mountain National Park -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Energy East Project
Moosomin -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
East Trails Project - East Gate
Riding Mountain National Park -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Zagime Community Center
Zagime IR #74-3 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
New Fibre Installation
Project Site 2: Cowessess -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Zagime Anishinabek School
Sakimay IR 74 -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
White Bear First Nation Community Spray Park
White Bear 70 -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
New Fibre Installation
Project Site 1: White Bear -
White Bear First Nation Wastewater Upgrade Project
White Bear First Nation -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
The Key First Nation Firehall
The Key First Nation -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation
Project site: Various parts of Manitoba -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation