Septic System Replacement - 2024

The purpose of this project is to decommission a failing septic system and install a new septic system on a residential property in Rouge National Urban Park. The project works will include site preparation, excavation, installation of the septic tank, and revegetation. During this work, proper erosion and sediment control practices will be installed as required, equipment will be driven in the area around the excavation, and fill will be stockpiled on site. The new septic system will be in compliance with the 2012 Ontario Building Code, as amended.


Latest update

March 25, 2025 - The assessment process has been terminated.

Participate

Key documents

Contacts

Rouge National Urban Park
3545 Kingston Road, Floor #2
Scarborough, Ontario M1M 1R6
Telephone: 416-264-2020
Fax: 416-264-2167
Email: rouge@pc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Rouge National Urban Park (Ontario)
  • Nature of Activity

    • Waste Management
  • Assessment Status

    Terminated
  • Start Date

    2024-06-24
  • Proponent

    Parks Canada
  • Authorities

    • Parks Canada Agency
  • Assessment Type

    Project on federal lands
  • Reference Number

    88662

Nearby assessments

...within 200 kilometres
Date modified: