Reid Road Reservoir Quarry Project

James Dick Construction Ltd. is proposing to re-open, operate, and decommission the Reid Road Reservoir Quarry for the extraction and processing of aggregate at a maximum production capacity of 990,000 tonnes per year for approximately 20 years. The project would be located in Milton, Ontario.


Latest update

December 12, 2019 - The Minister of Environment and Climate Change has determined that the Reid Road Reservoir Quarry Project proposed by James Dick Construction Ltd. does not warrant designation under the Impact Assessment Act. The reasons for the Minister’s determination are provided in the Minister’s response.

Participate

Key documents

Key documents
Document number Document title File Date
2 Analysis Report PDF (1007 KB) December 12, 2019
1 Minister's response - December 12, 2019

Contacts

Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca

Media Relations
Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Email: media@iaac-aeic.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Milton (Ontario)
  • Nature of Activity

    • Mines and Minerals
  • Assessment Status

    Completed
  • Start Date

    2019-08-28
  • Proponent

    James Dick Construction Ltd.
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Request for designation not applicable
  • Reference Number

    80327

Nearby assessments

...within 200 kilometres