Project Ocean Man Indian Reserve 69 Well Pad FS-2023

  • Location (Ocean Man Indian Reserve 69, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81568
  • Last Modified: 2021-04-22
  • Relevance: 798.8
  • A surface lease consisting of a 235 m long access road and  1.970 ha area for drilling and operating an  oil / natural gas well will be constructed and maintained for the operating life of the well, then decommissioned and reclaimed before the lease agreement is surrendered.

Project Airfield Pavement Repair/Replacement, 12 Wing Shearwater, Canadian Forces Base (CFB) Halifax, Nova Scotia

  • Location (12 Wing Shearwater, Eastern Passage, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81566
  • Last Modified: 2021-04-22
  • Relevance: 798.12
  • The Department of National Defence (DND) is proposing to carry out airfield pavement repair/replacement activities at 12 Wing Shearwater. The proposed project is expected to consist of the removal existing asphalt and concrete pavement, placement of granular materials and installation of new asphalt pavement in select locations on Ramp 1 (totalling approximately 3,025 m2). Milling and replacement of existing asphalt pavement on the FATO (approximately 2,560 m2) is also proposed. Surplus soils ...

Project Backflow Preventer Wastewater Capture Tank

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81567
  • Last Modified: 2021-04-22
  • Relevance: 798.11
  • The project involves the construction/installation of a campus backflow preventer, including a  200 000 L fiberglass wastewater capture tank at the CFIA Ottawa Fallowfield Laboratory located at 3851 Fallowfield Road, Ottawa, Ontario. The project includes the construction of a new 4.5m x 6.2m building to house the installation of a backflow preventer, piping and electrical infrastructure, and an underground waste water capture tank.  The purpose of the tank is to capture wastewater in ...

Project Alexander First Nation Campground Project

  • Location (Alexander First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81565
  • Last Modified: 2021-04-22
  • Relevance: 797.87
  • Alexander First Nation plans to upgrade an existing campground to include 23 serviced camp sites (water, sewer, and power connections), and construct a multi-use building for campground users. The campground is located along the northeastern edge of Sandy Lake, south of Highway 642. The existing campground is not currently operational and will require cleanup of unauthorized waste and debris, as well as clearing of overgrown sites and, in some cases, expansion of the existing sites to ...

Project Town of Banff 425 Muskrat St New 8 Unit Residential Dwelling

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81564
  • Last Modified: 2021-04-22
  • Relevance: 797.67
  • A new 8-unit residential dwelling has been proposed for construction on the current vacant lot at 425 Muskrat St. in the Town of Banff. Activities will include: perimeter shoring installation, excavation for foundation, concrete foundation construction, building construction, utility connection and final landscaping. Proposed project commencement is June 2021.

Project British Trench Trails

  • Location (Fort Beauséjour-Fort Cumberland National Historic Site, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81563
  • Last Modified: 2021-04-22
  • Relevance: 797.63
  • The project is for the development of a network of trails in the woodland and on the ridges of Fort Beauséjour-Fort Cumberland National Historic Site to interpret the British Entrenchments that are still visible. The proposed trail network will be approximately 3km in length and comprised of three loops. There will be a fully accessible loop of approximately 1.85km and the remainder of the path/loops will be footpaths that will be developed at a slightly lower standard to minimize ...

Project Tsuut'ina Nation The Shops at Buffalo Run

  • Location (Tsuut'ina Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81562
  • Last Modified: 2021-04-22
  • Relevance: 797.59
  • Tsuut'ina Nation's Taza Development Corporation plans to construct a new multi-building shopping center of approximately 275,000 (sf) along Buffalo Run Boulevard. A total of 14 buildings of various sizes will be constructed on the site. Site development surrounding the buildings will include approximately 1100 paved parking stalls, a park at the north end of the site, a park at the south end of the site and landscaping throughout.

Project Restaurant at Québec City Jean Lesage International Airport (YQB)

  • Location (Québec City Jean Lesage International Airport (YQB), Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81556
  • Last Modified: 2021-04-22
  • Relevance: 797.36
  • YQB wants to develop the commercial potential of its land assets in partnership with business enterprises. The project involves to develop a site for the operation of a restaurant including restaurant facilities, outdoor terrace and parking. The target clientele are passengers and citizens. The tenant shall operate the fast food in compliance with all federal, provincial and municipal environmental laws and regulations.

Project Shirley Road Upgrades and Realignment Project at Swan Creek

  • Location (5th Canadian Division Support Base, Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81559
  • Last Modified: 2021-04-22
  • Relevance: 797.19
  • This Project involves the activities and components related to the realignment and upgrade of Shirley Road which will encompass the new construction of approximately 1 kilometer (km) of new right-of-way and the decommissioning of approximately 1.2 km of the existing Shirley Road Alignment. The new alignment will be built to the required high Main Service Route (MSR ) VPD (vehicles per day) Geometric Road Standard to meet current and future DND training needs.

Project Royal Military College Museum - Design Phase

  • Location (Royal Military College, Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81557
  • Last Modified: 2021-04-22
  • Relevance: 797.06
  • The proposed Royal Military College (RMC) Museum Project in Kingston is intended to construct a new building in order to display objects of cultural significance and make these resources available to the public through exhibitions, programming and research. The proposed new facility will have and approximate interior space of 1,920 m2, and an approximate site development area of 9,300 m2. The proposed facility may include exhibition areas, seminar and multi-purpose rooms, office spaces, a ...

Project Waterloo Airport Runway Project

  • Location (Region of Waterloo International Airport, Runway 14-32, Ontario)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 81452
  • Last Modified: 2021-04-22
  • Relevance: 796.99
  • The Region of Waterloo International Airport is proposing to extend runway 14-32 from the current length of 1250 metres to a final length of 2134 metres, construct new access roads and a parallel taxiway, modify the runway approach lighting, and expand or relocate the terminal building. This work would improve the overall use of the airport, located in Breslau, Ontario, by upgrading the runway, which is currently capable of serving aircraft of Aircraft Group Number IIIA, so that it would become ...

Project Construction of screen embankments and a multifunctional area

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81461
  • Last Modified: 2021-04-22
  • Relevance: 795.19
  • The project consists of constructing a multifunctional storage area on Port of Montreal land located between Sicard and Viau streets. Approximately 15,000 square metres of roller-compacted concrete will be laid. This area will make it possible to ensure that the dry materials used for various maintenance activities carried out by the Port of Montreal's infrastructure department are all properly managed. A natural gas snow melter will also be installed on the site to improve the management ...

Project Repair of the Gauron-Lafleur bridges at the Lachine Canal

  • Location (Lachine Canal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81554
  • Last Modified: 2021-04-21
  • Relevance: 793.86
  • Repair work is required on the Gauron Bridge and the Lafleur Bridge located in the Lachine Canal in order to restore the structure to its full capacity and ensure the durability of the structures as well as the safety of users. Some works that will take place are the replacement of the deck joints, the installation of an asphalt coating and the cleaning of certain elements.

Project Project permit No. 21-050 - Exterior Modifications for Amazon

  • Location (Project permit No. 21-050 - Exterior Modifications for Amazon, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81555
  • Last Modified: 2021-04-21
  • Relevance: 793.84
  • PIRET (16133 Blundell Road) Holdings Inc. are proposing to undertake some exterior modifications to an existing building located at 16131 Blundell Road, Richmond, BC. The proposed works include the following: Installation of two 24 square metre guardhouses, one 84 square metre smoker's shelter and parking lot structures, including, site trailer and first aid with associated utility install Replacement of an electrical substation, access stairs and ramps and the installation of a ...

Project Olsen Road site development for truck staging

  • Location (Olsen Road site development for truck staging, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81363
  • Last Modified: 2021-04-21
  • Relevance: 793.04
  • The Proposed Project  Tyam Excavating and Shoring Ltd., working on behalf of Prudential Transportation Ltd., proposes to prepare a currently vacant site measuring approximately 37,000 square metres, to enable use for trucking operations and container storage. Proposed works include vegetation removal, site excavation, site grading, and sand and gravel placement to prepare the site for these operations.  Approximately 15,000 square metres of the site currently ...

Project Estevan Point Lightstation Fuel Tank Removal and Replacement

  • Location (Estevan Point Lightstation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81549
  • Last Modified: 2021-04-20
  • Relevance: 789.01
  • Project Summary DFO and CCG are undertaking a project to replace the existing diesel fuel tanks at the Estevan Point Lightstation in Alberni-Clayoquot, B.C.(the Site). The Site is under the jurisdiction of DFO and CCG, and as such, is on federal land.  DFO and CCG require the replacement of five 2,000 gallon diesel fuel tanks at the Site, in addition to the replacement of the piping and fittings connecting the tanks to each other and within the engine building. The existing fuel tanks ...

Project Floating Wave Break, Digby Harbour, NS

  • Location (Digby Harbour, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81306
  • Last Modified: 2021-04-20
  • Relevance: 788.92
  • The Digby Harbour Port Authority proposes to install a 150m wave break to be located to the south of the facility and providing shelter to the "V" between the breakwater and the spur wharf.  The floating wave break will be moored using concrete blocks, resting on the bottom of Digby Harbour.

Project Tilbury Marine Jetty Project

  • Location (Tilbury Island, Delta, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: In progress
  • Reference Number: 80105
  • Last Modified: 2021-04-20
  • Relevance: 788.79
  • Tilbury Jetty Limited Partnership proposes the construction and operation of a new marine terminal facility located on Tilbury Island, along the South Arm of the Fraser River in Delta, British Columbia. As proposed, the Tilbury Marine Jetty Project includes the loading of liquefied natural gas (LNG) onto LNG carriers and barges for export to local and global markets. The facility is expected to operate for a minimum of 30 years.     Please note that the project was ...

Project Fort Frontenac Storm Drainage and Parking Lot Reconstruction Project

  • Location (Fort Frontenac, in Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81548
  • Last Modified: 2021-04-19
  • Relevance: 785.15
  • The Fort Frontenac Storm Drainage and Parking Lot Reconstruction project involves replacing and repairing site infrastructure to manage the stormwater within Fort Frontenac, in Kingston, Ontario. The work includes replacement/upsizing of existing portions of the storm sewers, installing new storm systems, new outfall, abandoning existing service connections and reconstructing the parking lot to address site drainage issues. The project also includes spot repairs to the sanitary sewer prior to ...

Project Front Gate Water Loop - Garrison Wainwright

  • Location (Garrison Wainwright in Denwood, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81547
  • Last Modified: 2021-04-19
  • Relevance: 784.99
  • The purpose of this project is to create a water loop to improve circulation and residual chlorine levels at the Front Gate Building (B735) and Denwood House (B200) at Garrison Wainwright. A new water line will be installed to connect the service lines at B735 and B200 to the east end of Avenue du Parc. Project activities will include: · mobilization and demobilization of equipment and materials · civil works including traffic control, utility locates, tree clearing and ...

Project Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites

  • Location (Bloodvein First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81545
  • Last Modified: 2021-04-19
  • Relevance: 784.85
  • The project will involve the excavation of approximately 8,320 m3 of petroleum hydrocarbon (PHC) impacted soil from five (5) contaminated sites located within the Bloodvein First Nation as follows: 1. Bloodvein Miskooseepi Community School 2. Bloodvein Maintenance Garage Site 3. Bloodvein Former Maintenance Garage Site 4. Bloodvein Raw Water Intake Building Site 5. Bloodvein Former Waste and Landfarm Site   The petroleum hydrocarbon impacted soil will be hauled to a new ...

Project Marathon Palladium Project

  • Location (Marathon, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 54755
  • Last Modified: 2021-04-19
  • Relevance: 784.74
  • GenPGM is proposing to construct, operate and decommission an open pit palladium mine approximately 10 km from Marathon, Ontario. The proposed project would include three open pits, an ore processing plant, tailings and mine rock storage facilities, site access roads, a transmission line, explosives factory and magazines, water management facilities, ancillary mine infrastructure and associated activities. The rate of production would be approximately 25,200 tonnes of ore per day with a ...

Project Potential Regional Assessment of a Western Energy Corridor

  • Location (near Churchill, Alberta) (near Prince Albert, Manitoba) (near Vermilion, Saskatchewan)
  • Assessment Type: Request for regional assessment
  • Status: In progress
  • Reference Number: 81514
  • Last Modified: 2021-04-19
  • Relevance: 784.25
  • The Impact Assessment Agency of Canada is reviewing a request to conduct a regional assessment of an interprovincial energy corridor, extending from east-central Alberta to northern Manitoba with associated marine shipping.

Project Cote First Nation Wood Treatment Remediation Project

  • Location (Cote IR 64, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81544
  • Last Modified: 2021-04-19
  • Relevance: 784.14
  • Cote First Nation operated a historical fencepost treatment facility through the 1980s that has resulted in some metals impacts primarily in the soils at a property located within the Badgerville town boundaries (09-35-30-32-W1).  Various surface soil samples were collected as well and test holes were drilled for the purpose of soil sample collection.  Groundwater monitoring wells were installed and groundwater samples have been collected and analyzed.  The soil samples confirmed ...

Project Tent Mountain Mine Redevelopment Project

  • Location (16km west of Coleman (Alberta), Alberta)
  • Assessment Type: Request for designation
  • Status: In progress
  • Reference Number: 81436
  • Last Modified: 2021-04-19
  • Relevance: 783.96
  • Montem Resources Alberta Operations Ltd. is proposing to restart and expand mining operations at the Tent Mountain Mine, an open-pit coal mine located 16 kilometres west of Coleman, Alberta that stopped operating in 1983. As proposed, the Tent Mountain Mine Redevelopment Project would expand the original mine pits to allow for the production of 4925 tonnes per day of raw coal used for steelmaking, over a 14-year mine life. The project would also include a coal handling and processing plant ...

Project Carling Campus Accessibility Improvements

  • Location (Carling Campus, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81543
  • Last Modified: 2021-04-19
  • Relevance: 783.87
  • A study was completed in Fiscal Year 2019/2020 to review the accessibility across the Carling Campus. The study identified several items that need attention to bring the accessibility standards for the parking and land asset up to code. The deficiencies identified during the study include, but are not limited to, width of the accessible parking spaces and side access aisle, absence of accessible pavement markings and signage, widening of existing walking paths, repairing uneven surfaces, ...

Project Multi-use Arbour & Powwow Grounds on Brokenhead Reserve

  • Location (Scanterbury on the Brokenhead Reserve, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81458
  • Last Modified: 2021-04-19
  • Relevance: 782.24
  • The proposed Multi-use Arbour & Powwow Grounds will be a multi-use facility to be used by Brokenhead Ojibway Nation and surrounding First Nations for a multitude of uses, including cultural teachings and workshops, traditional ceremonies, cultural programming, rentals and community celebrations and events.

Project Kwikwexwelhp Healing Lodge Access Road Repair and Re-grading

  • Location (Kwikwexwelhp Healing Lodge, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81460
  • Last Modified: 2021-04-19
  • Relevance: 782.24
  • The Kwikwexwelhp access road is 2km and provides specific access to the institution. Over the years damage to the road has occurred that is beginning to create safety issues. The project is to repair and regrade the existing access road and also repair or replace culverts along the road.

Project Correct Fuel Tank Deficiencies

  • Location (350 King Edward, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81455
  • Last Modified: 2021-04-17
  • Relevance: 773.86
  • The existing fuel oil system serving 350 King Edward Avenue's life safety emergency genset and two (2) client gensets have been identified during their annual inspections that they are not in conformance with the current fuel oil code for fuel oil burning equipment CAN/CSA B139-15 - Installation code for oil-burning equipment. The fuel system is identified and registered under ECCC# 00003613. The objective of this project is to correct deficiencies within the fuel-oil system to satisfy ...

Project Value Chain Solutions - Heartland Complex Expansion Project

  • Location (18 kilometres north east of Fort Saskatchewan, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 81148
  • Last Modified: 2021-04-16
  • Relevance: 772.38
  • Value Chain Solutions Inc. is proposing to expand its approved Heartland Project, a bitumen upgrader and refinery, located in Alberta's Industrial Heartland, about 18 kilometres northeast of Fort Saskatchewan. As proposed, the Value Chain Solutions – Heartland Complex Expansion Project would increase the facility's input capacity by three hundred percent, bringing its total capacity to 119,240 m3/day or 750,000 barrels/day. The project would include activities such as the ...

Project Cascade Pit Gravel Crushing

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81542
  • Last Modified: 2021-04-16
  • Relevance: 772.35
  • Parks Canada Highway Operations Unit is proposing to crush 11,033m3 of existing gravel debris that is currently stored as Cascade Pit in Banff National Park for use in winter road abrasive. Once crushed, 5000m3 of the material will be moved immediately from the pit to the Banff Operations Compound, and pickled for use as winter abrasive. The remaining 6033m3 will remain at Cascade Pit until 2022, when it will be transported for storage at the Operations Compound, where it will be pickled for ...

Project Alderville First Nation - Communal and POE Water Treatment Systems

  • Location (Alderville First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81541
  • Last Modified: 2021-04-16
  • Relevance: 772.26
  • The Alderville First Nation (the Proponent) is proposing to decommission, construct and upgrade water-related infrastructure, entirely within the Alderville First Nation. New construction includes: A production well; A high capacity water treatment plant; ~750 metres of conveyance piping; 18 service connections to public buildings; 10 point-of-entry systems; An underground reservoir for water storage; and A high lift pumping station. Upgrades include: Works on ...

Project Hydrometric Station Decommissioning - Fisher River, Manitoba

  • Location (Fisher River, Manitoba, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81507
  • Last Modified: 2021-04-16
  • Relevance: 771.58
  • Environment and Climate Change Canada proposes to decommission a non-operational hydrometric station at Fisher River, Manitoba. This includes removing a metal walk-in shelter and a cableway. The cableway consists of a 55 m steel cable across the river, 2 towers (10 m from the river), and concrete anchors for the towers (7 m from the river). The steel cable will be cut and immediately winched to a drum. The towers and anchors will then be removed. The work will be completed within 1-3 days.

Project Rose Lithium-Tantalum Mining Project

  • Location (Municipality of Baie-James, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80005
  • Last Modified: 2021-04-16
  • Relevance: 769.74
  • Critical Elements Corporation is proposing the construction, operation and decommissioning of an open pit lithium and tantalum mine located approximately 38 kilometres north of Nemaska, in Quebec. As proposed, the project includes the operation of an open pit, waste and tailings impoundment area, an industrial ore processing facility and the option of transforming concentrate off-site. The mine would produce about 4,500 tonnes of ore per day over a 17-year life span. The project would last 26 ...

Project Ocean Man Indian Reserve 69E Pipeline4

  • Location (Ocean Man Indian Reserve 69E, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81537
  • Last Modified: 2021-04-15
  • Relevance: 769
  • A 15 m wide, 390 m long right of way easement will provide for the construction and operation of a  pipeline that will transport oil and produced water.  Construction of the pipeline and reclamation of the right of way will be completed within the first year of the project.  Following decommissioning of the pipeline, the right of way will be surrendered.

Project O'Chiese Culvert 2 Replacement Project

  • Location (O'Chiese First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81535
  • Last Modified: 2021-04-15
  • Relevance: 768.62
  • O'Chiese First Nation plans to replace and repair culvert and road assets damaged by the 2020 spring flooding. The proposed project will replace a damaged culvert, located at 8-2-45-11-W5M, with a new culvert of appropriate size for the drainage area. The project will also repair the road crossing the culvert to pre-flood condition and add erosion control.

Project O'Chiese Culvert 3 Replacement Project

  • Location (O'Chiese First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81536
  • Last Modified: 2021-04-15
  • Relevance: 768.61
  • O'Chiese First Nation plans to replace and repair culvert and road assets damaged by the 2020 spring flooding. The proposed project will replace a damaged culvert, located at 8-27-44-10-W5M, with a new culvert of appropriate size for the drainage area. The project will also repair the road crossing the culvert to pre-flood condition and add erosion control.

Project O'Chiese Culvert 1 Replacement Project

  • Location (O'Chiese First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81534
  • Last Modified: 2021-04-15
  • Relevance: 768.55
  • O'Chiese First Nation plans to replace and repair culvert and road assets damaged by the 2020 spring flooding. The proposed project will replace a damaged culvert, located at 11-27-44-10-W5M, with a new culvert of appropriate size for the drainage area. The project will also repair the road crossing the culvert to pre-flood condition and add erosion control.

Project Department of National Defence Building Construction and Recapitalization, Canadian Forces Base 14 Wing Greenwood, Greenwood, Nova Scotia

  • Location (Canadian Forces Base (CFB) 14 Wing Greenwood, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81533
  • Last Modified: 2021-04-15
  • Relevance: 768.22
  • The Department of National Defence proposes to construct two new cadet buildings (a Cadet Training Building and a Cadet Accommodations Building) and recapitalize three existing cadet trailers (B229, B233, and B239) located at Cadet Compound, Ad Astra Way, 14 Wing Greenwood, Greenwood, Nova Scotia (44°58'42.60"N, 64°55'6.60"W). The new cadet buildings will consist of one-level structures with a slab-on-grade construction. The new Cadet Training Building (approximately ...

Project Banff Air Strip Structure Removal

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81532
  • Last Modified: 2021-04-15
  • Relevance: 768.12
  • Parks Canada is proposing to remove all non-emergency assets/structures at the Banff Airstrip, including two aircraft hangers and two aboveground storage tanks. This work will improve the safety for people and wildlife alike by reducing the current environmental footprint while removing hazards from abandoned structures. The airstrip itself will remain in place as an emergency landing site.

Project Stanley Park Water Supply Tunnel - Chilco Shaft

  • Location (Stanley Park Water Supply Tunnel - Chilco Shaft, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81531
  • Last Modified: 2021-04-15
  • Relevance: 767.97
  • The Greater Vancouver Water District   is planning to construct a major water infrastructure project, referred to as the Stanley Park Water Supply Tunnel, to replace a section of existing water supply infrastructure. When complete, the new tunnel will meet current seismic standards, help ensure the continued reliable delivery of clean, safe drinking water to the region, and increase the capacity of the existing system to support the region's growing population. The Project ...

Project Bayfield Annual Dredge Project

  • Location (Bayfield, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81530
  • Last Modified: 2021-04-15
  • Relevance: 767.64
  • The Municipality of Bluewater, with support from Fisheries and Oceans Canada's Small Craft Harbours branch, is planning to perform an annual dredge of their harbour located on the shores of Lake Huron at the mouth of the Bayfield River in the village of Bayfield. Approximately 2900 cubic metres will be dredged using a barge excavator and trucks to haul the dredge out of river. The dredge will occur towards the end of May.

Project Cavendish Campground New Loop Construction

  • Location (Prince Edward Island National Park, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81529
  • Last Modified: 2021-04-15
  • Relevance: 767.35
  • Climate change and its impacts on coastal shorelines (accelerated erosion, damaging wind events) have encouraged park managers to plan for coastal retreat for visitor offers such as camping. As such, this proposed project will relocate a new campground loop for Cavendish Campground inland to be more protected from climate change impacts. It was also chosen due to its room for expansion in future years as erosion continues to erode the shoreline away at Cavendish Campground. The new loop will ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Date modified: