Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

1032 results

Project 875 Heron Road Rehabilitation

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86081
  • Last Modified: 2023-12-05
  • Relevance: 799.97
  • 875 Heron Road, situated on the traditional territory of the Algonquin Nation, is a part of Confederation Heights, one of several Federal Government employment nodes in the National Capital Region. Built in the early 1970s, 875 Heron Road is a Crown-owned asset that serves as the headquarters of the Canada Revenue Agency (CRA). The building is designated as a recognized federal heritage building for its historical associations and architectural and environmental values. Remaining ...

Project Rehabilitation of Merivale Road culvert

  • Location (Rehabilitation of Merivale Road culvert, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87138
  • Last Modified: 2023-12-05
  • Relevance: 799.97
  • The City of Ottawa is proposing to undertake the renewal of the Merivale Road culvert (SN117620) crossing Black Rapids Creek. The culvert is located on Merivale Road 1.25 km north of Fallowfield Road in the City of Ottawa. The culvert has reached the end of its service life, and the renewal work will provide a structurally sound culvert. The culvert is located mostly on City of Ottawa property but extends onto lands owned by the National Capital Commission (NCC) at the ends (inlet and ...

Project Westslope Cutthroat Trout Conservation Reintroduction to Cascade Creek

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87137
  • Last Modified: 2023-12-05
  • Relevance: 799.96
  • Parks Canada proposes to reintroduce the Threatened westslope cutthroat trout into the 9km long, restored Cascade Creek channel in Banff National Park. Since 2018, Parks Canada has completed physical restoration works on Cascade Creek in preparation for the reintroduction. Ready for the next phase, this proposal considers fish translocation from source populations and long-term monitoring to ensure a self sustaining population. Genetics and pathogen testing have been undertaken to select two ...

Project Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project

  • Location (Bigstone Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86107
  • Last Modified: 2023-12-04
  • Relevance: 799.9
  • Bigstone Cree Nation proposes to construct and operate a secondary access road linking Duran Lane (also called Auger Lane) to Oksi Pasikoniwew Kakik Elementary School and the future site of a new high school. The road will consist of a 7.0m wide all-season surface within a 30.0m wide maintained alignment and a total length of 370m within Bigstone Cree Nation's lands at Wabasca IR No. 166A. The road alignment is proposed to cross a Class C unnamed tributary (WBID 223457) of South Wabasca ...

Project Enoch Cree Nation Medical Treatment Centre Project

  • Location (Enoch Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87136
  • Last Modified: 2023-12-04
  • Relevance: 799.89
  • The Chief and Council and the Economic Development Board of Enoch Cree Nation (ECN) consistent with Ministerial approval issued by the federal government approving commercial development activities in the North East Development Area (NEDA) of Reserve #135 has approved the construction of a two story 7,348m² Medical Treatment Center (MTC). The MTC will be constructed in Lot 272 of ECN (111157 CLSR AB) with a building footprint of 3,860m² and a 20,800m² parking lot. 

Project Hydro - North Shore Line Project

  • Location (Riding Mountain National Park of Canada, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87135
  • Last Modified: 2023-12-04
  • Relevance: 799.88
  • Manitoba Hydro proposes to clear trees along the existing North Shore Distribution Line (OE 12-7) in Riding Mountain National Park to widen the right-of way for safety and reliability purposes. The portion of the right-of-way to be widened is approximately 5.7 kilometers long (93 spans) and is located along the northeastern shore of Clear Lake, in the vicinity of the Clear Lake Golf Course and the North Shore Road. Clearing will be completed to 15-20 metres to either side of the centerline of ...

Project La Plonge Solar Project

  • Location (English River First Nation Reserve, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87134
  • Last Modified: 2023-12-04
  • Relevance: 799.86
  • Notice of Intent   Located on English River First Nation Reserve in northern Saskatchewan, the La Plonge Solar project is a proposed 500kW (AC) community solar project. This project includes 500 kW of solar energy and future plans for a gridscale battery energy storage system (BESS). The project is connected to a rural radial distribution line, fed by a lower reliability transmission line from the main grid. The project will reduce CO2 by an expected 220 tCO2e/year. In addition to ...

Project York Factory - New Subdivision with road and utilities - 2324

  • Location (York Factory, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87133
  • Last Modified: 2023-12-04
  • Relevance: 799.86
  • This project covers 18,401 sqm. The project is to design a new subdivision, including water and sanitary sewer connections, for approximately 20 units. The water services and sewer services will be connected to the existing watermain and sanitary sewer systems that run along the north side of Evergreen Way. The access road will connect to Evergreen Way on the east side of the proposed project site.

Project Stoney Nakoda Tri Services Project

  • Location (Stoney Nakoda Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86064
  • Last Modified: 2023-12-04
  • Relevance: 799.81
  • Stoney Nakoda plans to develop a tri services facility for police, ambulance, and fire services. The facility buildings will be slab grade single story and will include a fenced storage area on the east side of the building and parking, two double bays for fire and ambulance, a common use area in the building, and police services. Power will be provided from existing lines west of the site with upgrades to increase service capacity while water and sewer servicing will be provided from a ...

Project Saulteau First Nation Sewage Collection, Treatment and Disposal System

  • Location (Saulteau First Nation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86060
  • Last Modified: 2023-12-03
  • Relevance: 799.7
  • Saulteau First Nation is planning to construct a sewage collection, treatment, and disposal system for the Lakeview and Riverside subdivisions on IR 169. The collection system will tie into existing septic tanks and convey sewage from each individial subdivision home to a centralized community treatment system. The existing septic tanks will capture solids and provide pretreatment. The centralized treatment system will include a spiral headworks screen, two aerated lagoons in series, a UV ...

Project Annacis Island Wastewater Treatment Plant New Outfall - Amendment 06

  • Location (Delta, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80526
  • Last Modified: 2023-12-02
  • Relevance: 799.59
  • Metro Vancouver is requesting an extension to the approved project permit PER 17-093, which has an expiry date of December 31, 2023, as more time is needed to complete the Project. The scope of works that remain to be completed includes:  The installation of pre-cast concrete covers over the duckbill valves on the diffuser manifold  Placement of the backfill material and rip rap over the diffuser manifold  Removal of the temporary bulkheads that are in the riser pipe ...

Project Thorold ready-mix concrete plant

  • Location (1134 Old Thoroldstone Road, Thorold, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86056
  • Last Modified: 2023-12-01
  • Relevance: 799.48
  • Rankin Precast Inc. (a division of Rankin Construction Inc.) is proposing to construct a new ready-mix plant at 1134 Old Thorold Stone Road in Thorold, Ontario (the Plant).   Rankin's Construction division has operated a materials storage yard on this property for the last 42 years.  The Plant will produce up to 130 cubic meters/hr of various grades of concrete.  The Plant will operate year-round with regular hours of operation between 6:00 am – 6:00 pm Monday ...

Project Deroche Creek Long Term Solutions

  • Location (Deroche Creek, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86132
  • Last Modified: 2023-11-30
  • Relevance: 799.47
  • The Deroche Creek Long-Term Solution Project encompasses Reaches 1, 2 and 3 on the lower alluvial fan. The scope of the Project includes the following major work items, listed from downstream (Reach 1) to upstream (Reach 3) : • Excavation of a secondary pilot channel in Nicomen Slough where it cuts through the toe of the fan deposit at the downstream extent of Reach 1. • Construction of two deflection berms extending out from Taylor Rd into Nicomen Slough, located west of the ...

Project Pheasant Rump Nakota IR 68D Gasification Project

  • Location (Pheasant Rump Nakota IR 68D, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86131
  • Last Modified: 2023-11-30
  • Relevance: 799.45
  • Natural Gas Low Pressure Distribution Infrastructure - Permit for the whole of Pheasant Rump Nakota IR 68D for as long as needed. SaskEnergy may install and maintain natural gas natural gas mains and any supporting infrastructure required to support natural gas distribution services (e.g. meter stations, valves, tie-ins etc.) on above noted reserves. The majority of work will involve the installation, maintenance, repair and decommissioning of mains noted in Pheasant Rump Nakota IR ...

Project Hatchet Lake Denesuline First Nation Nursing Station

  • Location (Hatchet Lake Denesuline First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86130
  • Last Modified: 2023-11-30
  • Relevance: 799.45
  • Hatchet Lake Denesuline First Nation is proposing to build a new Nursing Station for its community.  The building will act as the primary health facility for the community and replace the current ageing Nursing Station that was built in 1982.  The proposed building will be approximately 1450 m2 plus a 185 m2 garage. The site of the new nursing station will require new infrastructure including sewer, water, and propane for heating.  The site currently has power but the service ...

Project Dredging and Hazardous Large Woody Debris Trimming in the Gwa'yi (Kingcome) River and Estuary

  • Location (Kingcome River and Estuary, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86129
  • Last Modified: 2023-11-30
  • Relevance: 799.44
  • Works have been proposed to improve navigational safety for Dzawada'enuxw First Nation small boat operators in the Gwa'yi (Kingcome) River and Estuary. Work during will involve dredging of sediment near the confluence of the Kingcome River and Pacific Ocean, and subsequent deposition in the subtidal area fronting the Kingcome delta. Concurrently, work to trim hazardous large woody debris will be conducted in the lower 6 km of the Kingcome River between U'kwa Nalis Village and the ...

Project French River South Landing SCH Wharf Reconstruction

  • Location (French River South Landing SCH is located at the junction of Paynter and Cannery road, in French River, Queens County, Prince Edward Island., Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85875
  • Last Modified: 2023-11-30
  • Relevance: 799.44
  • French River South Landing is a class C DFO fishing harbour (Harbour #2026), managed by the French River Harbour Authority. The harbour's existing structures 404, 405 and 406 consist of treated timber piled substructure and fendering system with a reinforced concrete deck. The combined length of structures 404, 405 and 406 is approximately 110 m. The existing ramp 501 is comprised of treated timber substructure and retaining walls with a combination of reinforced concrete and treated timber ...

Project Katit Creek Lower Bridge Replacement

  • Location (Katit Creek, Wuikinuxv Nation Reserve Lands, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86127
  • Last Modified: 2023-11-30
  • Relevance: 799.43
  • Replacement of the log-stringer lower bridge with a new bridge structure consisting of precast concrete box stringers and precast concrete spread footing abutments. This will entail reconstruction of the road approaches to achieve a higher deck elevation and thus a deeper channel to reduce the risk of future debris torrents. Improvements to the creek channel will include reconstruction of the channel at the lower bridge to widen the channel and lower the High-Water Level, and ...

Project Lower Kootenay Band - Seven Nations Soaring Eagles Healing Centre

  • Location (Seven Nations Soaring Eagles Healing Centre, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86126
  • Last Modified: 2023-11-30
  • Relevance: 799.43
  • The proposed infrastructure for this project includes ~ 711 m2 of new buildings including four 2-bedroom cabins, a workshop, and a main building (~ 444 m2). The main building would be the primary center of activity on site and would include a kitchen, dining area, office space, multi-use spaces, and storage. In addition to the permanent structures, temporary tipi camping areas would also be created on site. The existing dwelling on site will be retained and modified to provide extra ...

Project Dredging, Fox Island River, NL

  • Location (Fox Island River, Newfoundland, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86125
  • Last Modified: 2023-11-30
  • Relevance: 799.41
  • DFO, Small Craft Harbour intends to dredge the harbour channel at the Fox Island River SCH. The scope of work for this project will consist of, but will not necessarily be limited to, dredging between the sheet pile channel entrance wall and north rubble mound breakwater, extending westerly a distance of approximately 280m. The dredge depth is -2.4m with respect to low normal tide and the total volume of material to be dredged is 7,500m3.

Project Bonaventure Expressway Reconfiguration Project

  • Location (Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86035
  • Last Modified: 2023-11-30
  • Relevance: 799.37
  • Built between 1965 and 1967, the Bonaventure Expressway is reaching the end of its service life. The Jacques Cartier and Champlain Bridges Incorporated (JCCBI) is going to completely reconfigure this sector into a boulevard to address its changing uses particularly in terms of traffic flow, active mobility and the transport of goods. Along with providing public access to the banks of the St. Lawrence River, the planned reconfiguration will include redeveloping the shoreline and optimizing ...

Project Waste Transfer Station Construction

  • Location (M'Chigeeng, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86055
  • Last Modified: 2023-11-30
  • Relevance: 799.37
  • M'Chigeeng First Nation is located in the Manitoulin District of Ontario. This project includes the construction of a new waste transfer station, located adjacent and directly accessible to Highway 540. The proposed Waste Transfer Station include an Attendant's Facility, roll off bins for wastes, new concrete storage areas for scrap metal, tires, leaf and yard wastes and bulky wastes, alongside a hazardous waste disposal container, as well as electronic waste and used oil storage tanks. ...

Project Repair and development of the Île Sainte-Hélène Pavilion

  • Location (Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86037
  • Last Modified: 2023-11-30
  • Relevance: 799.37
  • Built between 1927 and 1931, the Île Sainte-Hélène Pavilion is an Art-Deco-style building located on Île Sainte-Hélène. With a total floor area of 7,145 m2, the pavilion has two basements, a ground floor, an upper floor, and a mezzanine. Its foundations were built into the side of the bedrock. The building is made of concrete slabs and walls, and a system of steel beams and columns. The pavilion roof is part of the deck of Section 5 of the Jacques Cartier ...

Project Removal of Tank #3 - 14 Wing Greenwood Central Heating Plant

  • Location (14 Wing Greenwood, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86124
  • Last Modified: 2023-11-29
  • Relevance: 799.32
  • The Department of National Defence (DND) is proposing to remove the 120,276 litre Tank #3 and associated piping at the Central Heating Plant. After the tank is removed, the structural galvanized steel access stairwell and walkway will be re-installed/re-supported to maintain access to the top of the remaining tanks. Secondary containment around the existing tanks will be re-established.

Project Development Work and Generator Installation - Pointe-à-Carcy Naval Complex

  • Location (Pointe-à-Carcy Naval Complex, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86122
  • Last Modified: 2023-11-29
  • Relevance: 799.3
  • The Department of National Defence (DND) has proposed a project which consists of the installation of two emergency generators protected by a shelter. The fuel system will be under the shelter and will be connected to the generators. The capacity of the petroleum storage system must be sufficient to power the generators for at least 48 hours and will be more than 5,000 liters. The concrete paving will be removed to allow the passage of underground electrical conduits and then put back on ...

Project Existing dock replacement - 2660 Panorama Drive

  • Location (Existing dock replacement - 2660 Panorama Drive, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86053
  • Last Modified: 2023-11-29
  • Relevance: 799.26
  • The proposed project Replacement of existing dock in disrepair: New fixed dock will be raised to a higher elevation with the addition of precast/cast in place concrete forms. The upgraded fixed dock will connect to the upgraded walkway and will be supported by two metal monopiles replacing the two existing wood creosote piles. A hinged ramp that connects to the moorage float and is kept in place by three steel piles. Floatation for the moorage float will be encased polystyrene ...

Project Sunshine Village Ski Resort Ski Out Widening Tree Removal 2023

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86121
  • Last Modified: 2023-11-28
  • Relevance: 799.23
  • Sunshine Village Ski Resort has proposed to remove one island of trees in a strategic location along the ski out. The objective is to widen the ski out in a location where congestion commonly occurs during peak times of the day to improve skier safety. The tree island removal is ~9290m2. Removal will be completed by feller buncher equipment. Stumps will remain in place to minimize ground disturbance. Proposed debris disposal methods is piling and burning.

Project York Factory Prevention Centre

  • Location (York Factory, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86120
  • Last Modified: 2023-11-28
  • Relevance: 799.21
  • The scope of this project is to design and construct a new First Nation Child and Family Services prevention centre immediately adjacent to the existing hockey arena, connecting the arena to the proposed FNCFS prevention centre. The new space will consist of a gymnasium/community space, office space/therapy rooms and wellness and recreational spaces. This includes its water and sanitary sewer connections. The water and sewer services will be connected to the existing watermain and ...

Project Replacement of an electrical pole in the Cap Tourmente National Wildlife Area

  • Location (Cap-Tourmente National Wildlife Area, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86119
  • Last Modified: 2023-11-28
  • Relevance: 799.2
  • Hydro-Québec plans to carry out maintenance work on the power line located within the Cap Tourmente National Wildlife Area. These works include the replacement of an electrical pole, the reinstallation of conductors, and, if necessary, the replacement of stays as well as their grounding anchors.

Project Replacement of 3 electric utility poles in the Lake Saint-François National Wildlife Area

  • Location (Lake Saint-François National Wildlife Area, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86108
  • Last Modified: 2023-11-28
  • Relevance: 799.2
  • Hydro-Québec plans to carry out maintenance work on power line HTD 235, located in the Lac-Saint-François National Wildlife Area. These activities consist of replacing three power poles along the line, reinstalling conductors, and replacing guy wires and their ground anchors, if necessary.

Project Matsqui IR4 Multiuse Pathway

  • Location (Matsqui IR4 Multiuse Pathway, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86118
  • Last Modified: 2023-11-28
  • Relevance: 799.2
  • Matsqui First Nation is planning to build a multi-use pathway in the Matsqui 4 reserve (IR 4) residential area. The proposed gravel path will measure 225-metres long, 3-metres wide, with siting through a greenspace connecting the residential area to a local park. Two benches, pavement markings at cross walk locations, and pedestrian level bollard luminaire lights would also be installed as part of the project.

Project Shirleys Bay Demolition, Buildings 7, 8, and 26

  • Location (3701 Carling Ave, Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86051
  • Last Modified: 2023-11-28
  • Relevance: 799.15
  • Proposed Building Demolition of buildings 7, 8 and 26 at the Shirleys Bay Campus located at 3701 Carling Avenue, Ottawa, Ontario. The Department of Innovation, Science and Economic Development's Communications Research Centre of Canada is proposing to demolish three (3) buildings located at Shirleys Bay Campus that are long past their life expectancy. The buildings are located on Federal Land located in the National Capital Commission area. This project will be conducted in ...

Project Expansion of the Rodeway Inn in Pikogan

  • Location (Abitibiwinni First Nation, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86048
  • Last Modified: 2023-11-26
  • Relevance: 798.93
  • The Abitibiwinni First Nation is looking to expand the Rodeway Inn hotel in Pikogan, near Amos. The hotel's location, just off Route 109, is certainly advantageous. This expansion will meet demand and create new jobs for community members.   The Abitibiwinni First Nation will also take advantage of the opportunity to turn to business tourism, with the addition of a conference center on the first floor of the expansion.

Project ATCO Town of Banff Compressed Natural Gas Connection

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86116
  • Last Modified: 2023-11-24
  • Relevance: 798.79
  • ATCO's project would entail welding fittings onto the top and bottom of the 10" gas main below the Bow River vehicle bridge in the Town of Banff and installing a new gas line through the south bridge footing. The work would require welding and grinding above the river bank but not over the river. This project would give ATCO Gas a road accessible tie in point to a large diameter gas line to supply the Town of Banff with natural gas via compressed natural gas trailers in the event of ...

Project Fortis Alberta 610013030 Castle Junction 551L Rebuild

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83865
  • Last Modified: 2023-11-24
  • Relevance: 798.79
  • FortisAlberta is proposing to replace part of the 551L line, from Castle junction to Silver city, as the structure is nearing the end of its' structural integrity. In total 1.6km of line will be rebuilt. The new line will be placed adjacent to the existing infrastructure within the RoW, in order for the power cables to be transferred over. The project would like to commence in September and will take 3 weeks to complete.

Project Application of RipRap for Shoreline Stabilization - Tower Island, Big Rideau Lake, ON

  • Location (Rideau Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86115
  • Last Modified: 2023-11-24
  • Relevance: 798.79
  • The owners of Tower Island in Big Rideau Lake propose to apply riprap to protect two existing sections of deteriorated shoreline wall, which surround most of the island. Rocks in the size range of 25-45 cm would be placed on a 2.5 : 1 slope. The proposal is to place riprap in front of the existing vertical walls, which will encroach onto the bed of the Rideau Canal (below the high water mark) up to 115 m2. This total will comprise two different areas of placement: • 35 linear meters of ...

Project Poplar River Bridge Replacement

  • Location (Poplar River First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83983
  • Last Modified: 2023-11-24
  • Relevance: 798.78
  • Poplar River First Nation (PRFN) requires the construction of a new bridge to facilitate commuting and heavy load transport for the community. The existing Poplar River and Franklin River bridges have existing load restrictions and therefore do not meet community servicing needs. This project will involve the rehabilitation of the Poplar River Bridge to facilitate commuter use, and the Franklin River bridge will be converted to a pedestrian only bridge. A new bridge will be constructed over the ...

Project Boat School at the Maritime Museum of the Atlantic

  • Location (1675 Lower Water Street, Halifax, Nova Scotia, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85935
  • Last Modified: 2023-11-24
  • Relevance: 798.78
  • Build Nova Scotia (BNS) is proposing to construct a boat school at the southwest corner of the inlet between Acadia Wharf and Queen's Marque of Halifax Harbour fronting 1675 Lower Water Street. As part of the Maritime Museum of the Atlantic (MMA), it will serve as an educational facility as well as a point of interest for passersby. The Project includes construction of a workshop (16.8 metres by 13.5 metres) to teach boat building, focusing on youth from minority and Indigenous communities. ...

Project Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK

  • Location (Buffalo River Dene Nation I.R. 193, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86114
  • Last Modified: 2023-11-24
  • Relevance: 798.77
  • Wood River Controls Inc. is proposing the installation of a new point-to-point link (10.7-11.7 GHz Band) from Buffalo Narrows, SK to Dillon, SK. The station located in Dillon, SK is located on Buffalo River Dene Nation I.R. 193. The project will encompass installation of a 1.8m (6 ft) antenna 30 m high onto an existing SaskTel tower.

Project Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK

  • Location (Waterhen 130 Reserve, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86112
  • Last Modified: 2023-11-24
  • Relevance: 798.77
  • Wood River Controls Inc. is proposing the installation of a new point-to-point link (10.7 - 11.7 GHz band)  from Dorintosh, SK to Waterhen Lake, SK. The station located in Waterhen Lake is located on Waterhen No. 130 I.R. The project will encompass installation of a 1.8m (6 ft) antenna 20 m high onto an existing SaskTel tower.

Project Red Head SCH Breakwater Reconstruction

  • Location (Red Head SCH is located in Red Head, Kings County, Prince Edward Island., Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85959
  • Last Modified: 2023-11-24
  • Relevance: 798.76
  • In the fall of 2023, Hurricane Fiona damaged the breakwaters and wharf infrastructure at Red Head Small Craft Harbour (SCH). The scope of repair work includes the reconstruction of the wharf structures 408 and 410 as well as breakwater structure 601. It is expected that the top of the reconstructed breakwater will be higher than the existing structure requiring a larger footprint.

Project Elder's Village Site Servicing

  • Location (Nuxalk Nation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86113
  • Last Modified: 2023-11-23
  • Relevance: 798.69
  • The project consists of providing site servicing to the proposed elders village including water, onsite wastewater disposal systems and drainage. The proposed Elder's Village consists of 5 Elder's housing units and an Amenity building. Each Elder's building will house 2 bedroom  Elder's Units and 2 caregiver suites. Total area impacted by the project approximately 18,770 square meters.

Project Cape Scott Lightstation Fuel Tank Replacement

  • Location (Cape Scott Lightstation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86110
  • Last Modified: 2023-11-23
  • Relevance: 798.69
  • DFO and CCG are proposing to replace the diesel fuel tanks at the Cape Scott Lightstation. The lightstation is staffed by two lightkeepers 24/7 as per maritime safety requirements. Currently, the station is powered by diesel fuel powered generators, which supply electricity to the three residences, radio communication equipment, weather monitoring system, and the many other buildings and assets on station. The current diesel fuel tanks are at their end of service and need to be replaced. ...

Project Nootka Lightstation Renewable Power Generation System

  • Location (The Nootka Lightstation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86111
  • Last Modified: 2023-11-23
  • Relevance: 798.68
  • DFO and CCG are proposing to install a renewable energy system at the Nootka Lightstation. The lightstation is staffed by two lightkeepers 24/7 as per maritime safety requirements. Currently, the station is powered by diesel fuel powered generators, which supply electricity to the two residences, lighthouse, weather monitoring system, and the many other buildings and assets on station. The proposed design was chosen as a means to reduce the fuel consumption on site by incorporating renewable ...

Project Timber harvesting on BABINE 6

  • Location (Babine 6, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86109
  • Last Modified: 2023-11-23
  • Relevance: 798.66
  • November 23, 2023 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, the Indigenous Services Canada is inviting public comments until December 25, 2023 respecting that determination.

Project Abrams Village SCH Wharf Reconstruction

  • Location (Abrams Village DFO-SCH, Prince County, Prince Edward Island, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85684
  • Last Modified: 2023-11-23
  • Relevance: 798.64
  • Abrams Village DFO-SCH existing wharf structure #401 has reached the end of its safe and useful life cycle and requires complete replacement. The existing structure forms a "C" comprised of a marginal wharf in the East-West direction along the shoreline combined with a pier extending to the North and finally an "Ell" back in the East-West direction. The wharf structure is comprised of timber piles with timber sheathing, cross bracing, fenders, wales, wheel guards and a ...

Project Stautlo property renovation - 9829 River Road

  • Location (Stautlo property renovation - 9829 River Roa, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86045
  • Last Modified: 2023-11-23
  • Relevance: 798.61
  • The proposed property renovation includes the following:  Regrading and paving of driving surfaces along the east, south and west building perimeters  Repair of pavement structure at two locations at building perimeter.  Installation of 4 storm sewer catch basins connecting to existing outfalls to the river.  Installation of 2 storm sewer lines connecting to existing outfalls to the river.  Installation of 1 oil water separator.  Installation of 2 ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Assessment Type Display Filters

Authorities Display Filters

Date modified: