Upgrade Single Tower & New Fibre Installation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Upgrade (Single) Tower
Saskatchewan Telecommunications is proposing the addition of eight (8) antennas of 0.487 meter, in the 5 GHz frequency band, mounted at the top of an existing 31 meters tower which is located on James Smith. The antennas will be installed to improve network access to high-speed Internet. In the future, the existing tower may have other antennas and other radiocommunication equipment added or replaced.
New Fibre Installation
Saskatchewan Telecommunications plans to install underground fiber optic cabling, for Internet purposes, to all residential homes of Red Earth No.29 (Red Earth) (51356), Red Earth, Cote First Nation 366, Shoal Lake Cree Nation, Pelican Narrows (Peter Ballantyne Cree Nation), Sturgeon Weir No.205 (Peter Ballantyne Cree Nation), James Smith, Amiskosakahikan No.210 (Peter Ballantyne Cree Nation), and Wapaskokimaw No.202 (Peter Ballantyne Cree Nation).
The project involves the installation of approximately 127 km of underground and aerial fiber optic cable along the roads of Red Earth No.29 (Red Earth) (51356), Red Earth, Cote First Nation 366, Shoal Lake Cree Nation, Pelican Narrows (Peter Ballantyne Cree Nation), Sturgeon Weir No.205 (Peter Ballantyne Cree Nation), James Smith, Amiskosakahikan No.210 (Peter Ballantyne Cree Nation), and Wapaskokimaw No.202 (Peter Ballantyne Cree Nation).
The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, but will be suspended on support structures to connect to residential homes and businesses.
Latest update
May 27, 2025 - Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- relevant potential environmental effects;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, Innovation, Science and Economic Development Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, Innovation, Science and Economic Development Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | May 27, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | April 24, 2025 |
Contacts
Innovation, Science and Economic Development CanadaLynda Mama, Program Officer
235 Queen St
Ottawa, Ontario K1A 0H5
Email: get-connected-branchez-vous@ised-isde.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Project Site 1: Central East region - Red Earth No. 29 (51356) (Saskatchewan)
- Project Site 2: Central East region -Badgerville (Saskatchewan)
- Project site 3: Central East region - Denare Beach (Saskatchewan)
- Project site 4: Central East region - Pakwaw Lake (Saskatchewan)
- Project site 5: Central East region - Pelican Narrows (Saskatchewan)
- Project site 6: Central East region - Sandy Bay (Saskatchewan)
- Project site 7: Central East region - Sturgeon Landing (Saskatchewan)
- Project site 8: Central East region - James Smith (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2025-04-24 -
Proponent
Saskatchewan Telecommunications Holding Corporation -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
89474
Nearby assessments
...within 200 kilometres-
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Batoche Drainage Improvement
Grasslands National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
SaskPower Transformer Salvage
Prince Albert National Park -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Beaver dam and lodge removal
Prince Albert National Park -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Montreal Lake RCMP New Detachment
Montreal Lake -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Crean Channel Modification
Prince Albert National Park -
Aspen Power Station Project
Lanigan -
Red Earth River Dike Extension
Red Earth IR 29A -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Outhouse relocation
Prince Albert National Park of Canada -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
La Ronge Area Peat Harvesting Project
La Ronge -
Dakota Springs Spa
Whitecap IR #94 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Muskowekwan Potash Mine Project
Lestock -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
George Gordon First Nation Fire Hall
George Gordon First Nation -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Deschambault Lake Lagoon Expansion
The Peter Ballantyne Cree Nation (PBCN) Kimosom Pwatinahk I.R No. 203 -
Deschambault Lake Road Resurfacing and Drainage Improvements
Kimosom Pwatinahk I.R. No. 203 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
La Ronge RCMP New Detachment
La Ronge -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
The Key First Nation Firehall
The Key First Nation -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Sturgeon Weir Water and Wastewater Upgrades
Sturgeon Weir I.R. 205 -
Sucker River Mithwayawikamik Wellbeing Center
Sucker River 156C -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Opaskwayak Cree Nation (OCN) Bracken Dam Earthen Dike Extension
Opaskwayak Cree Nation -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
Lac La Ronge Indian Band Stanley Mission - Loon Lake Subdivision Stage 3
Stanley Mission 157 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 6: West Central region - Stanley Mission -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Pelican Narrows Subdivision Stage 7
Pelican Narrows I.R. No. 184B -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
New (Multiple) Tower Construction
School Tower -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Pelican Narrows Lagoon Expansion
Pelican Narrows I.R. No. 184B -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
McIlvenna Bay Mine Project
Creighton -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Peepeekisis Community Centre
Peepeekisis IR #81 -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 5: West Central region - Grandmother's Bay -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
Zagime Community Center
Zagime IR #74-3 -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Mosahiken Cree Nation - Road Upgrades - 2324
Mosahiken -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Mosakahiken Cree Nation Child and Family Wellness Building
Mosakahiken Cree Nation -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Moose Lake -
Launch Ramp Replacement - Moose Lake, Manitoba
Moose Lake, Manitoba -
Moose Lake Harbour Improvements
Moose Lake Small Craft Harbour -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Sandy Bay Lagoon Upgrade
Peter Ballantyne Cree Nation WAPASKOKIMAW INDIAN RESERVE NO. 202 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Sandy Bay Road Upgrades
Wapaskokimaw Indian Reserve No. 202 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
Zagime Anishinabek School
Sakimay IR 74 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
New Fibre Installation
Project Site 2: Cowessess -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Easterville Harbour Wharf and Launch Ramp Reconstruction
Easterville, Manitoba -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Chemawawin Cree Nation Transitional Housing Building
Chemawawin Cree Nation -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Tower Hill VHF Tower
Riding Mountain National Park -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Peter Ballantyne Cree Nation Southend Solid Waste Transfer Station
SE 1/4 36-10-84 W2M -
Peter Ballantyne Cree Nation Southend Wastewater and Raw Water Upgrades
Southend Indian Reserve No. 200 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Mathias Colomb -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 4: West Central region - Southend & Reindeer -
Southend RCMP Detachment Major Renovation
Southend -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Peter Ballantyne Cree Nation Southend Lot Drainage and Improvement
Southend -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Mathias Colomb Cree Nation Nursing Station Replacement
Mathias Colomb Cree Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Energy East Project
Moosomin -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Smallmouth Bass Project
Riding Mountain National Park -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
New Fibre Installation
Riding Mountain National Park -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Mooswa East Water Line
Riding Mountain National Park -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
East Trails Project - East Gate
Riding Mountain National Park -
Lynn Lake Gold Project
-
Marcel Colomb First Nation Temporary Prevention Building
Marcel Colomb First Nation -
Marcel Colomb Watermain Extension
Marcel Colomb Creen Nation -
Lynn Lake Gold Project
Lynn Lake