Muskoday Convenience Store Remediation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
An environmental consultant has identified a plume of petroleum hydrocarbon impacts in soil and groundwater at the Muskoday Convenience Store & Gas Bar. A portion of the impacts are due to a 2018 release of fuel from an aboveground storage tank and the rest of the impacts remain from historical releases and contamination. Impacts have migrated from the west edge of the store to the southeast, crossing Chief David Knight Road, but not yet reaching the Muskoday Daycare. The proposal is to carry out anaerobic bioremediation to treat the impacts in place. Anaerobic bioremediation will require the implementation of a fertilizer amendment within and upstream of the impacts through trenches. The amendment will travel through the contaminated zone through groundwater flow. Monitoring wells are in place upstream, downstream, and within the plume to continually monitor contamination and amendment concentrations. The estimated timeline to achieve remedial objectives is 3 field season, with completion in fall of 2023.
Latest update
.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for Muskoday Convenience Store Remediation | - | April 22, 2021 |
| 1 | Public Comment Period on Intent to Make a Determination | - | March 22, 2021 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Muskoday First Nation (Saskatchewan)
-
Nature of Activity
- Remediation and conservation
-
Assessment Status
Completed -
Start Date
2021-05-01 -
Proponent
Muskoday First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81467
Nearby assessments
...within 200 kilometres-
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Little Red River Wellbeing Centre
Little Red River IR #106c -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
SaskPower Transformer Salvage
Prince Albert National Park -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Montreal Lake RCMP New Detachment
Montreal Lake -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Beaver dam and lodge removal
Prince Albert National Park -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Crean Channel Modification
Prince Albert National Park -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Outhouse relocation
Prince Albert National Park of Canada -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Batoche Drainage Improvement
Grasslands National Park -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Mistawasis Nêhiyawak Community Center
Mistawasis -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
La Ronge Area Peat Harvesting Project
La Ronge -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Walk Into History
Chitek Lake -
Red Earth River Dike Extension
Red Earth IR 29A -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
La Ronge RCMP New Detachment
La Ronge -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Aspen Power Station Project
Lanigan -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Morin Lake Wellbeing Centre
Morin Lake IR #217 -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Dore Lake Wharf Removal
Dore Lake -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Sucker River Mithwayawikamik Wellbeing Center
Sucker River 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C