Upgrade (Single) Tower
Saskatchewan Telecommunications is proposing the addition of eight (8) antennas of 0.487 meter, in the 5 GHz frequency band, mounted at the top of the existing 106 meters and 34 meters towers which are located on Deer Ridge and Sturgeon Lake No.101 (Sturgeon Lake First Nation). The antennas will be installed to improve network access to high-speed Internet. In the future, the existing tower may have other antennas and other radiocommunication equipment added or replaced.
New Fibre Installation
Saskatchewan Telecommunications plans to install underground fiber optic cabling, for Internet purposes, to all residential homes of Hall Lake (Lac La Ronge), One Arrow First Nation, Montreal Lake No.106B (Montreal Lake), Mistawasis (Mistawasis Nêhiyawak), Sturgeon Lake No.101 (Sturgeon Lake First Nation), Black Lake, Fond du Lac No.227 (Fond du Lac) , Chitek Lake No.191 (Pelican Lake), Lac La Hache No.220 (Hatchet Lake), and Stony Rapids.
The project involves the installation of approximately 202 km of underground and aerial fiber optic cable from near Points North Landing along the Highway 905 to the entrance of Stony Rapids community.
The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, but will be suspended on support structures to connect to residential homes and businesses.
Latest update
May 27, 2025 - Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- relevant potential environmental effects;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, Innovation, Science and Economic Development Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, Innovation, Science and Economic Development Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | May 27, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | April 24, 2025 |
Contacts
Innovation, Science and Economic Development CanadaLynda Mama, Program Officer
235 Queen St
Ottawa, Ontario K1A 0H5
Email: get-connected-branchez-vous@ised-isde.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Project site 1: North East region - Hall Lake (Saskatchewan)
- Project site 2: North East region - Chamakese Resort (Chitek Lake) (Saskatchewan)
- Project site 3: North East region - One Arrow (Saskatchewan)
- Project site 4: North East region - Montreal Lake (Saskatchewan)
- Project site 5: North East region - Mistawasis (Saskatchewan)
- Project site 6: North East region - Sturgeon Lake (Saskatchewan)
- Project site 7: North East region - Black Lake (Saskatchewan)
- Project site 8: North East region - Fond-du-Lac (Saskatchewan)
- Project site 9: North East region - Wollaston Lake (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2025-04-24 -
Proponent
Saskatchewan Telecommunications Holding Corporation -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
89473
Nearby assessments
...within 200 kilometres-
Hatchet Lake Denesuline First Nation Nursing Station
Hatchet Lake Denesuline First Nation -
Hatchet Lake Landfill
LAC LA HACHE INDIAN RESERVE NO. 220 -
Hatchet Lake Lagoon Upgrades
LAC LA HACHE INDIAN RESERVE NO. 220 -
Mining and Milling the Midwest Project
McClean Lake Operation -
Highway 914 - All Weather Roadway - McArthur River Mine Site to Cigar Lake Mine Site
-
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Barren Lands -
Barren Lands First Nation New Lagoon and Associated Works Project
Barren Lands First Nation -
Barren Lands First Nation New Lagoon and Associated Works Project
Barren Lands First Nation -
Barren Lands First Nation New Lagoon and Associated Works Project
Barren Lands First Nation -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Northlands Denesuline First Nation -
Highway 914 - All Weather Roadway - McArthur River Mine Site to Cigar Lake Mine Site
Waterbury Lake -
Wheeler River Project
Russell Lake -
Millennium Mine Project
Moon Lake -
Key Lake Extension Project
Key Lake -
Tazi Twé Hydroelectric Project
Chicken Indian Reserve No. 224 -
Black Lake First Nation Firehall
Black Lake First Nation -
Black Lake First Nation Lagoon Upgrades
Black Lake First Nation -
Lynn Lake Gold Project
-
Highway 905 - All Weather Roadway - Stony Rapids to Lake Athabasca near Fond-du-Lac
Stony Rapids -
Peter Ballantyne Cree Nation Southend Lot Drainage and Improvement
Southend -
Black Lake First Nation - Road Resurfacing and Improvements
Black Lake First Nation -
Southend RCMP Detachment Major Renovation
Southend -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 4: West Central region - Southend & Reindeer -
Fond du Lac First Nation Water Treatment Plant Expansion
Fond du Lac IR 227 -
Fond Du Lac Environmental Remediation
Fond du Lac IR 227 -
Sand and Gravel Permit - Fond du Lac Airport Resurfacing project
Fond du Lac IR #227 -
Highway 905 - All Weather Roadway - Stony Rapids to Lake Athabasca near Fond-du-Lac
-
Pelican Lake First Nation Gas Bar Upgrade
Chitek Lake IR 191 -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 5: West Central region - Grandmother's Bay -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 6: West Central region - Stanley Mission -
Lac La Ronge Indian Band Stanley Mission - Loon Lake Subdivision Stage 3
Stanley Mission 157 -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Pelican Narrows Lagoon Expansion
Pelican Narrows I.R. No. 184B -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Upgrade Single Tower & New Fibre Installation
Project site 5: Central East region - Pelican Narrows -
Pelican Narrows Subdivision Stage 7
Pelican Narrows I.R. No. 184B -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sucker River Mithwayawikamik Wellbeing Center
Sucker River 156C -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Road Resurfacing and Drainage Improvements
Kimosom Pwatinahk I.R. No. 203 -
Deschambault Lake Lagoon Expansion
The Peter Ballantyne Cree Nation (PBCN) Kimosom Pwatinahk I.R No. 203 -
La Ronge RCMP New Detachment
La Ronge -
Former Gunnar Mine Site Rehabilitation Project
Gunnar -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
Blanket Permit - SaskPower - Wapachewunak First Nation (English River First Nation)
Wapachewunak First Nation No. 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 1) -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
La Ronge Area Peat Harvesting Project
La Ronge -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
La Plonge Solar Project
English River First Nation Reserve -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Dore Lake Wharf Removal
Dore Lake -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Montreal Lake RCMP New Detachment
Montreal Lake -
Crean Channel Modification
Prince Albert National Park -
Outhouse relocation
Prince Albert National Park of Canada -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
Muskoday Convenience Store Remediation
Muskoday First Nation -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 7: West Central region - Thunderchild Fixed Wireless Tower -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Flying Dust Commercial Project
Meadow Lake -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Walk Into History
Chitek Lake -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Beaver dam and lodge removal
Prince Albert National Park -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Big Island Lake Cree Nation Child and Family Service Centre
Big Island Lake Cree Territory -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 2: West Central region - Big Island Lake -
Powwow Arbour Construction
Pierceland -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Makwa Sahgaiehcan First Nation Transfer Station
Makwa Sahgaiehcan First Nation -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Makwa Sahgaiehcan First Nation Well Completion
Makwa Sahgaiehcan First Nation -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation English Bay Gas Station Project
Cold Lake First Nation -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Cold Lake First Nations-Four Unit Housing Project 2024 2025
Cold Lake First Nations -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Ministikwan Community Road Repairs
Ministikwan Lake Cree Nation -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Snow and Ice Clearing (SNIC) Expansion – 4 Wing Cold Lake
4 Wing Cold Lake -
The Design and Construction (Modified Design Build) of the New 4 Wing Quick Reaction Alert (QRA) Area– 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Medley Extension – 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
TERMINATED: Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Construction of a Retail Warehouse - 4 Wing Cold Lake
4 Wing Cold Lake -
Development of Hangars in the Quick Reaction Area – 4 Wing Cold Lake, Alberta
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 – Cold Lake Air Weapons Range
Cold Lake Air Weapons Range -
Relocation of the Deployable Maintenance Facility (DMF) Training Compound – 4 Wing Cold Lake
4 Wing Cold Lake -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nations 3-Phase Subdivision Development
Cold Lake First Nations -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Batoche Drainage Improvement
Grasslands National Park -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild Community Walking Trail
Thunderchild First Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild First Nation Firehall
Thunderchild First Nation Indian Reserve No. 115B -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Onion Lake 3D 2026 Seismic Program
Onion Lake 3D 2026 Seismic Program -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
OS-7264 Authorization to Construct and Operate a Surface Lease for multiwell oil pad
Frog Lake First Nation -
OS-7261 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
OS-7269 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
OS-7266 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
OS-7265 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7263 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7260 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
OS-6891 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
EX-9999 Authorization for a 3D seismic exploration program for oil and gas development
Frog Lake First Nation -
OS-7268 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad.
Frog Lake First Nation -
OS-7257 Authorization to construct and operate a surface lease for an access road and for a multi-well oil pad
Frog Lake First Nation -
OS-7262 Authorization to Construct and Operate a Surface Lease for a multiwell oil pad
Frog Lake First Nation -
OS-7267 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-6634 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
OS-6908 Authorization to Construct and Operate a Surface Lease
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7259 Authorization to construct and operate a surface lease for a multi-well oil pad
Frog Lake First Nation -
OS-7270 Authorization to Construct and Operate a Surface Lease for an access road and a multiwell oil pad, with a temporary log deck
Frog Lake First Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
OS-6826 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Frog Lake First Nation 4 Unit Housing Project
Frog Lake First Nation -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Lloydminster Region Abandonment Project
Makaoo Indian Reserve 120 (Onion Lake Cree Nation) -
Frog Lake CFS Equine Centre
Frog Lake -
Onion Lake Family Services Inc. Child and Family Services Building
Onion Lake First Nation -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Little Pine First Nation Health Clinic
Little Pine Indian Reserve No. 116 -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Aspen Power Station Project
Lanigan -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Lake Diefenbaker Irrigation Expansion Projects
Lake Diefenbaker