Cumberland House Cree Nation Fire Hall & Equipment
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Cumberland House Cree Nation is proposing the construction of a new fire hall. The proposed development is a 14.3 meter x 18 meter three-bay fire hall building to house the Cumberland House Cree Nation's fire trucks and fire fighting equipment. The building will be serviced with water and sewer from nearby existing mains. Roadway approach construction and parking lot are included. Total site area is approximately 40 meters x 50 meters.
The proposed project activities include clearing and grubbing of existing trees, topsoil stripping over site area, installation of underground services, installation of screw piles, construction of perimeter grade beam foundation and concrete slabs, framing of building, installation of exterior masonry and metal roofing and interior finishes.
Waste debris and material associated with the project will be hauled to the nearest permitted disposal site. The proposed project site is located within 130 m from the nearest residence.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for Cumberland House Cree Nation Fire Hall & Equipment | - | January 18, 2024 |
1 | Notice of Intent -Start of Public Comment Period | - | December 15, 2023 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Cumberland House Cree Nation (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2023-12-15 -
Proponent
Cumberland House Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
87168
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Red Earth River Dike Extension
Red Earth IR 29A -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
McIlvenna Bay Mine Project
Creighton -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Mosahiken Cree Nation - Road Upgrades - 2324
Mosahiken -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Launch Ramp Replacement - Moose Lake, Manitoba
Moose Lake, Manitoba -
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Sandy Bay Lagoon Upgrade
Peter Ballantyne Cree Nation WAPASKOKIMAW INDIAN RESERVE NO. 202 -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Easterville Harbour Wharf and Launch Ramp Reconstruction
Easterville, Manitoba -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
La Ronge Area Peat Harvesting Project
La Ronge