Cote First Nation Wood Treatment Remediation Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Cote First Nation operated a historical fencepost treatment facility through the 1980s that has resulted in some metals impacts primarily in the soils at a property located within the Badgerville town boundaries (09-35-30-32-W1). Various surface soil samples were collected as well and test holes were drilled for the purpose of soil sample collection. Groundwater monitoring wells were installed and groundwater samples have been collected and analyzed. The soil samples confirmed exceedances of arsenic, copper and chromium. The site historically was capped with asphalt over a portion of it which was being utilized as a basketball court.As described above, surface, subsurface soils and groundwater have been assessed and metals impacts have been identified in the soils. The project will result in the excavation of impacted materials and backfill with clean source material. Construction (excavation) will be planned for summer 2021. There is authorization in place at a Class II Landfill to dispose of soils,
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 3 | Notice of Determination for Cote First Nation Wood Treatment Remediation Project | - | May 19, 2021 |
| 1 | Public Comment Period on Intent to Make a Determination | - | April 19, 2021 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Cote IR 64 (Saskatchewan)
-
Nature of Activity
- Remediation and conservation
-
Assessment Status
Completed -
Start Date
2021-06-01 -
Proponent
Cote First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81544
Nearby assessments
...within 200 kilometres-
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
The Key First Nation Firehall
The Key First Nation -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Zagime Community Center
Zagime IR #74-3 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
Tower Hill VHF Tower
Riding Mountain National Park -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
New Fibre Installation
Project Site 2: Cowessess -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Zagime Anishinabek School
Sakimay IR 74 -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Muskowekwan Potash Mine Project
Lestock -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Energy East Project
Moosomin -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Smallmouth Bass Project
Riding Mountain National Park -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
New Fibre Installation
Riding Mountain National Park -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Mooswa East Water Line
Riding Mountain National Park -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
George Gordon First Nation Fire Hall
George Gordon First Nation -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
New (Multiple) Tower Construction
School Tower -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
East Trails Project - East Gate
Riding Mountain National Park -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88