Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Proposed Sewage Lagoon - SE24-44-03-W3M & NE13-44-03-W3M
Proposed Sewage Pumping Station No. 1 - Lot 21 Block 5 SE13-44-03-W3M
Proposed Sewage Pumping Station No. 2 Electrical Building - Lot 1 Block 10 SE13-44-03-W3M
This project includes upgrades to the community's sewage infrastructure including a proposed sewage lagoon, proposed sewage pumping station, and proposed sewage pumping station electrical building. The sewage lagoon will be a two cell facultative lagoon and include an access road upgrade and the replacement of a sewage force main. The purpose of the project is to upgrade the community's sewage infrastructure to meet the needs through to the year 2040.
Proposed Sewage Lagoon - proposed to replace the existing sewage lagoon which is leaking and does not have the capacity to meet future demands. The lagoons facultative cell will have a minimum size of 4.69 hectares while the storage cell will have a minimum capacity of 141,594 cubic metres. The lagoon will have an expected lifespan to 2040.
Proposed Sewage Pumping Station No. 1 - proposed to replace the existing sewage pumping station No. 1 which is in poor condition and does not have the capacity to meet future demands. The building will be 49 square metres and have a minimum capacity of 14.7 L/s and expected lifespan to 2040.
Proposed Sewage Pumping Station No. 2 Electrical Building - proposed to be located next to the existing sewage pumping station No. 2 which is in good condition and has the capacity to meet future demands. The electrical building will be 38 square metres, constructed to house electrical components and the standby generator, and have an expected lifespan to 2040.
Proposed Sewage Lagoon - A two cell facultative lagoon complete with upgraded access road and new sewage force main
Proposed Sewage Pumping Station No. 1 - A 49 square metre building over a wet and dry well complete with new sewer, water, gas, power, and communication lines
Proposed Sewage Pumping Station No. 2 Electrical Building - A 38 square metre building complete with new gas, power, and communication lines
Stripping of topsoil on proposed sites
Lagoon Construction including earthworks, road construction, liner installation, and landscaping components
Building Construction including earthworks, structural, mechanical, electrical, and architectural components
Decommission existing Sewage Lagoons and existing Sewage Pumping Station No. 1
General Construction Waste (construction phase) - Contractor shall implement a Construction Waste Management Plan which outlines material streams, recycling haulers and markets, alternative waste disposal, landfill materials, landfill options, material handing procedures, and transportation for construction wastes.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 6 | Notice of Determination for Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades | - | January 31, 2023 |
| 5 | Updated Downstream Use and Impact Study | PDF (6.3 MB) | January 27, 2023 |
| 1 | Public Comment Period on Intent to Make a Determination | - | May 13, 2022 |
| 3 | Drawings - Sewage Pumping Station Upgrades | PDF (13.1 MB) | May 12, 2022 |
| 2 | Drawings - Sewage Lagoon and Force main Replacement | PDF (7.8 MB) | May 12, 2022 |
| 4 | Downstream Use and Impact Study | PDF (4.8 MB) | April 9, 2022 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Beardy's and Okemasis IR No. 96 & 97 (Saskatchewan)
-
Nature of Activity
- Water Management
- Waste Management
-
Assessment Status
Completed -
Start Date
2022-08-01 -
Proponent
Beardy's & Okemasis Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83638
Nearby assessments
...within 200 kilometres-
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Apron III infill
Saskatoon International Airport YXE -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Dakota Springs Spa
Whitecap IR #94 -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Mistawasis Nêhiyawak Community Center
Mistawasis -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Aspen Power Station Project
Lanigan -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Beaver dam and lodge removal
Prince Albert National Park -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
SaskPower Transformer Salvage
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Red Pheasant Cree Nation - Eagle Landing Development
Red Pheasant Reserve No. 108 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Lake Diefenbaker Irrigation Expansion Projects
Lake Diefenbaker -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Walk Into History
Chitek Lake -
Sweetgrass New School
Sweetgrass IR 113 -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Montreal Lake RCMP New Detachment
Montreal Lake -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Outhouse relocation
Prince Albert National Park of Canada -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 1: West Central region - Sweetgrass -
Crean Channel Modification
Prince Albert National Park -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
George Gordon First Nation Fire Hall
George Gordon First Nation -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Poundmaker Cree Nation Lagoon Upgrades
Poundmaker Indian Reserve No. 114 -
Poundmaker Cree Nation New Bridge Construction
Poundmaker Indian Reserve No. 114 -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Muskowekwan Potash Mine Project
Lestock -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities