The Lower Cove Loop Combined Sewer Rehabilitation Project Phase 1

The Lower Cove Loop Combined Sewer Rehabilitation Project Phase 1 consists of replacement and installation of combined and storm sewer infrastructure in the Lower Cove area of Saint John, New Brunswick. The project is intended to improve the condition and performance of existing combined sewer infrastructure in the Lower Cove area. The work generally includes installation of new sewer piping, storm sewer connections, precast manhole structures, modifications at CSO Chamber No. 1, installation of an emergency overflow pipe associated with SLS No. 9, and temporary relocation and reinstatement of affected Port Saint John electrical and communications infrastructure.

The work will be completed within an active port environment and will include excavation, backfill, asphalt reinstatement, fencing, traffic and access coordination, utility coordination, and environmental protection measures required to complete the work.


Latest update

Pending City Council’s decision regarding contract award.

Participate

Contacts

Alex
Port Saint John
Alex Calvin, Vice President Infrastructure and Planning
111 Water Street
Saint John, New Brunswick E2L 0B1
Email: acalvin@sjport.com


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Saint John (New Brunswick)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    In progress
  • Start Date

    2026-06-29
  • Proponent

    City of Saint John
  • Authorities

    • Saint John Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    90503