Contaminated Soil Remediation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The proposed Project will consist of excavation of approximately 4,000 m3 of contaminated soil (metals and PAHs) at four sites (AEC 1, AEC 2, AEC 3, AEC 4). The depth of soil excavation will occur to bedrock and excavated soil will be disposed of at a provincially approved off-site disposal facility.
Backfill used for site restoration purposes will be imported and comply with federal standards. Imported fill will be tested by the Engineer in accordance with industry requirements into ensure it is clean.
Approximately 500 m2 of the parking lot near AEC 2 will be removed and reinstalled.
Some vegetation clearing may take place as small forbs, graminoids, shrubs, and trees may be present at the site and require removal prior to excavation work. Wood and plant waste will be sent to an applicable waste site for composting or disposal.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination Contaminated Soil Remediation | - | October 17, 2022 |
| 1 | Notice of intent to make a determination | - | September 17, 2022 |
Contacts
Indigenous Services CanadaKerri Hurley, Senior Environment Officer
100 Anemki Place Suite 101
Fort William First Nation, Ontario P7J 1A5
Telephone: 807-708-5270
Fax: 807-623-3536
Email: kerri.hurley@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario (Ontario)
-
Nature of Activity
- Remediation and conservation
- Soil management
-
Assessment Status
Completed -
Start Date
2022-09-17 -
Proponent
Wauzhushk Onigum Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83981
Nearby assessments
...within 200 kilometres-
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
Wauzhushk Onigum Multi-Purpose Centre
Wauzhushk Onigum Multi-Purpose Centre -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Trans-Canada Highway Twinning Project
Kenora -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Women's Lodge & Cultural Safe Space
Kejick -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Subsurface Septic System Rehabilitation
Ontario -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Naotkamegwanning First Nation Wastewater Treatment Plant Replacement
Naotkamegwanning First Nation Reserve -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Northwest Angle #33 Dog Paw Water Treatment Plant Upgrade
Northwest Angle #33 First Nation No. 33A Dog Paw -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Anishnaabeg of Naongashiing First Nation - Lot Servicing for Future Modular Homes
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing First Nation - Wastewater Treatment System Upgrades
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing Sewage Lagoon
Saug-A-Gaw-Sing Indian Reserve NO.1 -
Rehabilitation of Watermains and Fire Pump Replacement
Crow Lake, ON -
Ojibways of Onigaming First Nation - Mikinaak Community Youth Cultural Centre Development
Ojibways of Onigaming -
Big Grassy Waabanong Nibi Endaayang Building Construction
Big Grassy First Nation -
Big Grassy First Nation Cultural Space Building
Morson -
Big Grassy River First Nation - Micro Subdivision Development
Big Grassy River First Nation -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Rainy River Project
Township of Chapple -
New Fibre Installation
Project site 18 (Wabauskang No. 21) -
Wabauskang First Nation - Lot Servicing Project (20)
Wabauskang First Nation -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
Partial Wharf Demolition, Lake Despair, Ontario
Lake Despair, Ontario -
Naicatchewenin First Nation Culture and Learning Center Development
Naicatchewenin First Nation -
Naicatchewenin First Nation - Lot Servicing Project for Future Houses
Naicatchewenin First Nation -
Naicatchewenin First Nation - 21 Units Lot Servicing Project
Naicatchewenin First Nation -
Shoreline Repairs and Improvements on Rainy Lake and Footprint River
Naicatchewenin First Nation -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Caribou Street Culvert Replacement
Rainy River First Nation -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
Goliath Gold Project
Dryden -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Mitaanjigamiing First Nation Subdivision Development
Mitaanjigamiing First Nation -
Wabigoon Lake Water Treatment System Expansion
Wabigoon Lake First Nation -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Vivian Sand Project
Springfield -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
Fort Frances Tribal Area Health Services (FFTAHS) Transitional Housing Phase 1
Agency One First Nations -
LSFN Burial Site Mapping
Lac Seul First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Josephine Cone Mine Project
Ignace -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Whitefish Tower -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #1 -
Lac Seul First Nation Broadband Upgrade
Lac Seul First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Kejick Bay North Tower -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Deep Geological Repository (DGR) for Canada's Used Nuclear Fuel Project
43 km northwest of Ignace -
Lac Seul First Nation - Lot Servicing Project
Lac Seul First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #2 -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Frenchman's Head Sewage Treatment Plant and Collection System (Lac Seul)
Frenchman's Head (Lac Seul) -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Hudson Tower -
Bending Lake Iron Project
49 kilometres southwest of Ignace -
Black River First Nation - Transitional Housing
Black River First Nation -
Black River Waste Transfer Station
Black River Reserve -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Demolition of Six (6) buildings associated with the former Old Zone Hospital in Sioux Lookout, Ontario
Former Sioux Lookout Zone Hospital Site, 82,76 & 85 - Seventh Avenue, 9 - Sixth Avenue, and 90.5 Queen Street, Sioux Lookout, Ontario -
Griffith Iron Ore Redevelopment Project
Ear Falls -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Seine River First Nation Standpipe Replacement
Seine River First Nation -
Abandoned Fuel Tank Decommissioning
Seine River First Nation -
Seine River First Nation - Water Treatment Plant Construction Project
Seine River First Nation -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Energy East Project
Winnipeg -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area