Wauzhushk Onigum Multi-Purpose Centre
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Community Living & Wellness Centre will be a state-of-the-art facility designed to serve the needs of the community. It will feature a full-size ice surface, six dressing rooms, spectator seating, a pro-shop, offices, a mezzanine level running/walking track, a fitness space, a dividable multi-purpose room, a canteen, a community lobby, and related support areas. The facility will be approximately 60,000 square feet in size and will utilize a combination of pre-engineered and conventional steel frame construction. The building will be constructed to a "Net Zero" ready standard in compliance with the requirements of the Infrastructure Canada – Green and Inclusive Community Buildings Program. Key principles driving the design of the building include: • Culturally Reflective • Community Health and Wellness • Sustainability • Climate Risk Mitigation • Multi-Use • Multi-Generational • Economic Viability • Flexibility/ Adaptability. The project will involve significant infrastructure work, including: • Site excavation, blasting of bedrock (extensive in the Kenora area), and backfill • Extension of municipal water and sewer services (community system that connects with the City of Kenora) • Connection of power to the Hydro One network • Construction of geothermal system The building construction will include: • Foundation work • Building construction • Mechanical systems • Electrical systems • Ice plant installation • Installation of photovoltaic systems • Landscaping and site finishing • Site amenities Specific measures to be taken to achieve our environmental sustainability goals include: • Energy modeling • Building envelope design • Refrigerant selection • Climate risk assessment • Impact and innovation strategies
Latest update
Participate
Contacts
Housing, Infrastructure and Communities/ Government of CanadaNoah Giles, Environmental Review Officer
180 Kent
Ottawa, Ontario K1P 0B6
Telephone: 343-571-3945
Email: Noah.Giles@infc.gc.ca
Housing, Infrastructure and Communities Canada
Calvin Kemm, Senior Environmental Review and Approvals Officer
180 Kent St
Ottawa, Ontario K1P 0B6
Telephone: 613-292-8120
Email: Calvin.Kemm@infc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Wauzhushk Onigum Multi-Purpose Centre (Ontario)
-
Nature of Activity
- Building and Property Development
- Recreation and Tourism
-
Assessment Status
In progress -
Start Date
2025-04-09 -
Proponent
Anishinabe of Wauzhushk Onigum -
Authorities
- Infrastructure Canada
-
Assessment Type
Project on federal lands -
Reference Number
89424
Nearby assessments
...within 200 kilometres-
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Trans-Canada Highway Twinning Project
Kenora -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Women's Lodge & Cultural Safe Space
Kejick -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Naotkamegwanning First Nation Wastewater Treatment Plant Replacement
Naotkamegwanning First Nation Reserve -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Subsurface Septic System Rehabilitation
Ontario -
Northwest Angle #33 Dog Paw Water Treatment Plant Upgrade
Northwest Angle #33 First Nation No. 33A Dog Paw -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Anishnaabeg of Naongashiing First Nation - Lot Servicing for Future Modular Homes
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing First Nation - Wastewater Treatment System Upgrades
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing Sewage Lagoon
Saug-A-Gaw-Sing Indian Reserve NO.1 -
Rehabilitation of Watermains and Fire Pump Replacement
Crow Lake, ON -
Ojibways of Onigaming First Nation - Mikinaak Community Youth Cultural Centre Development
Ojibways of Onigaming -
Big Grassy Waabanong Nibi Endaayang Building Construction
Big Grassy First Nation -
Big Grassy First Nation Cultural Space Building
Morson -
Big Grassy River First Nation - Micro Subdivision Development
Big Grassy River First Nation -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
Rainy River Project
Township of Chapple -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
New Fibre Installation
Project site 18 (Wabauskang No. 21) -
Wabauskang First Nation - Lot Servicing Project (20)
Wabauskang First Nation -
Partial Wharf Demolition, Lake Despair, Ontario
Lake Despair, Ontario -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
Naicatchewenin First Nation Culture and Learning Center Development
Naicatchewenin First Nation -
Naicatchewenin First Nation - Lot Servicing Project for Future Houses
Naicatchewenin First Nation -
Naicatchewenin First Nation - 21 Units Lot Servicing Project
Naicatchewenin First Nation -
Shoreline Repairs and Improvements on Rainy Lake and Footprint River
Naicatchewenin First Nation -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Caribou Street Culvert Replacement
Rainy River First Nation -
Goliath Gold Project
Dryden -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Mitaanjigamiing First Nation Subdivision Development
Mitaanjigamiing First Nation -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Wabigoon Lake Water Treatment System Expansion
Wabigoon Lake First Nation -
Vivian Sand Project
Springfield -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
Fort Frances Tribal Area Health Services (FFTAHS) Transitional Housing Phase 1
Agency One First Nations -
LSFN Burial Site Mapping
Lac Seul First Nation -
Josephine Cone Mine Project
Ignace -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Whitefish Tower -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #1 -
Lac Seul First Nation Broadband Upgrade
Lac Seul First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Deep Geological Repository (DGR) for Canada's Used Nuclear Fuel Project
43 km northwest of Ignace -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Kejick Bay North Tower -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Lac Seul First Nation - Lot Servicing Project
Lac Seul First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #2 -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Frenchman's Head Sewage Treatment Plant and Collection System (Lac Seul)
Frenchman's Head (Lac Seul) -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Hudson Tower -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Bending Lake Iron Project
49 kilometres southwest of Ignace -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Black River First Nation - Transitional Housing
Black River First Nation -
Black River Waste Transfer Station
Black River Reserve -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Demolition of Six (6) buildings associated with the former Old Zone Hospital in Sioux Lookout, Ontario
Former Sioux Lookout Zone Hospital Site, 82,76 & 85 - Seventh Avenue, 9 - Sixth Avenue, and 90.5 Queen Street, Sioux Lookout, Ontario -
Seine River First Nation Standpipe Replacement
Seine River First Nation -
Abandoned Fuel Tank Decommissioning
Seine River First Nation -
Seine River First Nation - Water Treatment Plant Construction Project
Seine River First Nation -
Griffith Iron Ore Redevelopment Project
Ear Falls -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Energy East Project
Winnipeg -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena