Obashkaandagaang First Nation Water Treatment Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Obashkaandagaang First Nation requires a new water treatment plant (WTP) and storage reservoir to replace the non-operating water treatment system currently in the community. The project will include installing a water intake pipe into the Lake of the Woods approximately 75 m off of the shore, a backwash outfall pipe approximately 95 m from the shore, constructing a new WTP building with below ground concrete reservoir and installing water service piping throughout the west end of the community. The water treatment system will be sized for fire flows to design year 20, based on projected population growth. The infrastructure for this project includes: New WTP building with treatment and disinfection equipment, a below grade concrete water reservoir under the WTP building , a genset for backup power, a granular approach and parking area around WTP building, electricity and communication lines to the WTP building, a septic field for the WTP wastewater, a 75 m water intake pipe into Lake of the Woods, a 95 m backwash outfall pipe into Lake of the Woods, distribution pumps and 1,165 m of watermain piping.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the proposed Obashkaandagaang First Nation Water Treatment Project | - | February 4, 2020 |
| 1 | Public Comment Period on Intent to Make a Determination | - | October 9, 2019 |
Contacts
Michael KingIndigenous Services Canada
Michael King, Environment Officer
100 Anemki Drive
Fort William First Nation, Ontario P7J 1A5
Telephone: 807-355-2454
Email: michael.king@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Obashkaandagaang First Nation (Ontario)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2019-10-09 -
Proponent
Obashkaandagaang First Nation -
Authorities
- Indigenous Services Canada
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
80242
Nearby assessments
...within 200 kilometres-
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Trans-Canada Highway Twinning Project
Kenora -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Wauzhushk Onigum Multi-Purpose Centre
Wauzhushk Onigum Multi-Purpose Centre -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Women's Lodge & Cultural Safe Space
Kejick -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Subsurface Septic System Rehabilitation
Ontario -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Naotkamegwanning First Nation Wastewater Treatment Plant Replacement
Naotkamegwanning First Nation Reserve -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Northwest Angle #33 Dog Paw Water Treatment Plant Upgrade
Northwest Angle #33 First Nation No. 33A Dog Paw -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Anishnaabeg of Naongashiing First Nation - Lot Servicing for Future Modular Homes
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing First Nation - Wastewater Treatment System Upgrades
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing Sewage Lagoon
Saug-A-Gaw-Sing Indian Reserve NO.1 -
Big Grassy Waabanong Nibi Endaayang Building Construction
Big Grassy First Nation -
Big Grassy First Nation Cultural Space Building
Morson -
Big Grassy River First Nation - Micro Subdivision Development
Big Grassy River First Nation -
Rehabilitation of Watermains and Fire Pump Replacement
Crow Lake, ON -
Ojibways of Onigaming First Nation - Mikinaak Community Youth Cultural Centre Development
Ojibways of Onigaming -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Rainy River Project
Township of Chapple -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Partial Wharf Demolition, Lake Despair, Ontario
Lake Despair, Ontario -
Naicatchewenin First Nation Culture and Learning Center Development
Naicatchewenin First Nation -
Naicatchewenin First Nation - Lot Servicing Project for Future Houses
Naicatchewenin First Nation -
Naicatchewenin First Nation - 21 Units Lot Servicing Project
Naicatchewenin First Nation -
Shoreline Repairs and Improvements on Rainy Lake and Footprint River
Naicatchewenin First Nation -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
New Fibre Installation
Project site 18 (Wabauskang No. 21) -
Wabauskang First Nation - Lot Servicing Project (20)
Wabauskang First Nation -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Caribou Street Culvert Replacement
Rainy River First Nation -
Vivian Sand Project
Springfield -
Mitaanjigamiing First Nation Subdivision Development
Mitaanjigamiing First Nation -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Goliath Gold Project
Dryden -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
Fort Frances Tribal Area Health Services (FFTAHS) Transitional Housing Phase 1
Agency One First Nations -
Wabigoon Lake Water Treatment System Expansion
Wabigoon Lake First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
LSFN Burial Site Mapping
Lac Seul First Nation -
Josephine Cone Mine Project
Ignace -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Black River First Nation - Transitional Housing
Black River First Nation -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Whitefish Tower -
Black River Waste Transfer Station
Black River Reserve -
Deep Geological Repository (DGR) for Canada's Used Nuclear Fuel Project
43 km northwest of Ignace -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #1 -
Lac Seul First Nation Broadband Upgrade
Lac Seul First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Kejick Bay North Tower -
Lac Seul First Nation - Lot Servicing Project
Lac Seul First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #2 -
Frenchman's Head Sewage Treatment Plant and Collection System (Lac Seul)
Frenchman's Head (Lac Seul) -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Hudson Tower -
Bending Lake Iron Project
49 kilometres southwest of Ignace -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Energy East Project
Winnipeg -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Seine River First Nation Standpipe Replacement
Seine River First Nation -
Abandoned Fuel Tank Decommissioning
Seine River First Nation -
Seine River First Nation - Water Treatment Plant Construction Project
Seine River First Nation -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Demolition of Six (6) buildings associated with the former Old Zone Hospital in Sioux Lookout, Ontario
Former Sioux Lookout Zone Hospital Site, 82,76 & 85 - Seventh Avenue, 9 - Sixth Avenue, and 90.5 Queen Street, Sioux Lookout, Ontario -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22