Launch Ramp Replacement, Matheson Island, Manitoba
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Fisheries and Oceans Canada - Small Craft Harbours are responsible for maintaining a safe and accessible harbours. Repairs to the launch ramp at the Matheson Island Harbour are required in order to maintain a safe and functioning harbour.
Fisheries and Ocean Canada - Small Craft Harbours are proposing to remove and replace the existing concrete launch ramp with a new concrete launch ramp at the Matheson Island Harbour site. The existing structure is deteriorating and damaged. The new ramp will include a base rock apron, and new concrete pads which will extend slightly further into the water and upland from the existing footprint. The project will involve upland and in-water work.
The contractor will use a combination of heavy equipment (likely an excavator, dump trucks and skid steer) to complete the proposed work.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination – Start of Public Comment Period | - | April 24, 2026 |
Contacts
Small Craft Harbours - Ontario & Prairie RegionFisheries and Oceans Canada
Chris McDermid, Environmental Advisor
501 University Cresent
Winnipeg, Manitoba R3T 2N6
Telephone: 431-335-7530
Email: chris.mcdermid@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Matheson Island (Manitoba)
-
Nature of Activity
- Ports and Harbours
-
Assessment Status
In progress -
Start Date
2026-04-24 -
Proponent
Fisheries and Oceans Canada, Small Craft Harbours, Ontario & Prairie Region -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
90397
Nearby assessments
...within 200 kilometres-
Launch Ramp Replacement, Pine Dock, Manitoba
Pine Dock -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Berens River Bridge Replacement
Berens River First Nation -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Hollow Water Wharf Construction
Hollow Water -
New Fibre Installation
Hollow Water First Nation no.10 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Hnausa – Wharf Replacement Project
Hnausa -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Black River First Nation Watermain Renewal Project
Black River First Nation -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
Black River Waste Transfer Station
Black River Reserve -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation Prevention Centre
Black River First Nation -
Black River First Nation - Transitional Housing
Black River First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River First Nation School
Poplar River Manitoba School -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 1: Poplar River 16 Tower 1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 2: Poplar River 16 Tower 2 -
Poplar River Bridge Replacement
Poplar River First Nation -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Poplar River -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation
Project site: Various parts of Manitoba -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba