North Bay Small Craft Harbour Rehabilitation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Fisheries and Oceans Canada, Small Craft Harbours (DFO-SCH) is planning to undertake harbour improvements at the North Bay, Ontario Small Craft Harbour site. DFO-SCH is responsible for maintaining a safe and accessible harbour at North Bay, ON. The harbour is used primarily as a recreational facility, offering public lake access and temporary transient berthage.
This rehabilitation project will focus on the Service Dock and Launch Ramp and includes:
- Encapsulating the existing steel sheet pile walls on the Service Dock and Launch Ramp Walls with new pre-cast concrete panels
- New walls to be approximately 500-700mm beyond existing walls
- Supply and installation of rock protection (rip rap) along the toe of the new wall (full length)
- Requires approximately 1.2 m wide x 0.6 m deep excavation
- To accommodate the new wall, the existing launch ramp consisting of pre-cast concrete panels, will be removed and reinstalled about 500-700mm north of its existing location
- Installing a pile cap on the new walls
- Installing a new concrete deck and/or reinstating existing concrete pavers (where applicable)
- Reinstating asphalt in the disturbed area
The project will include installation and maintenance of a turbidity curtain around the work. Additionally, there are two gas pumps on the service dock that will remain; fuel lines will be located and protected during construction.
Latest update
Participate
Contacts
Fisheries and Oceans Canada - Small Craft HarboursFisheries and Oceans Canada
Deirdre Connell, Environmental Advisor, Small Craft Harbours
1111 International Blvd, Suite 702
Burlington, Ontario L7L 6W1
Telephone: 905-975-8523
Email: deirdre.connell@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- North Bay (Ontario)
-
Nature of Activity
- Ports and Harbours
-
Assessment Status
Completed -
Start Date
2025-06-03 -
Proponent
Fisheries and Oceans Canada, Small Craft Harbours, Ontario and Prairie Region -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
89592
Nearby assessments
...within 200 kilometres-
North Bay – Pile replacement project
North Bay -
Energy East Project
North Bay -
Chippewa Barracks Perimeter Security Fence, Fort Chippewa Barracks, 540 Chippewa St W, in North Bay Ontario
Fort Chippewa Barracks, 540 Chippewa St W, in North Bay -
New Fibre Installation
NIPISSING INDIAN RESERVE NO. 10 -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Shared Services Canada Upgrades - 22 Wing North Bay
22 Wing North Bay -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Upgrade Underground Municipal Services - 22 Wing North Bay
22 Wing North Bay -
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
Short Range Development Road Upgrades and Bridge Replacement - 22 Wing North Bay
22 Wing North Bay -
New Fibre Installation - North Bay ON
Project site 1 - Lake Nipissing -
Short Range Development (SRD) Fence Installation – 22 Wing North Bay
22 Wing North Bay -
Mnogin Constructed Wetland to Support Sustainable Water Treatment
Mnogin Constructed Wetland to Support Sustainable Water Treatment -
New Fibre Installation
Project site 1: Spottswood Bay, Lake Talon -
Nipissing First Nation - Cultural Center Construction
Nipissing First Nation -
Nipissing First Nation - 20 Unit Subdivision Project
Nipissing First Nation -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
New Fibre Installation
Project Site 2: Kaibuskong Bay -
VLA Water Plant Replacement
Nipissing -
New Fibre Installation - North Bay ON
Project site 2 - Ruth Lake -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Portage Dam Concrete Storage Pad
Portage Dam -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
Portage Channel Bridge Replacement - Keso Bay Road
Dokis -
Dokis First Nation - Chaudière Bridge Replacement Project
Dokis First Nation -
Dokis First Nation Water Treatment Plant
Dokis First Nation -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
Not Applicable
Timiskaming Dam -
Timiskaming Dams Complex - Buildings Replacement
Timiskaming Dams Complex in Long Sault Island, Temiscaming, ON -
Timiskaming Dam-Bridge of Quebec Replacement Project
Temiscaming -
Marina Construction Project
Kebaowek -
Development of four new streets in Kebaowek
Development of four new streets in Kebaowek -
Wahnapitae First Nation
Wahnapitae First Nation -
Temagami First Nation Outdoor Cultural Spaces
Bear Island -
Kipawa Rare Earths Project
Kipawa -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Shawanaga First Nation - Lot Servicing for future houses
Shawanaga First Nation -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Wahnapitae First Nation Aggregate Project
location -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Permanent Waterway Barriers for Latchford Dam
Latchford Dam -
Bank Stabilization at Latchford Dam
Latchford Dam -
Latchford Dam - Public Safety Fencing
Latchford Dam -
New Stoplog Lifter Latchford Dam
Latchford Dam -
Wahnapitae FN Micro Subdivision Project
Wahnapitae First Nation -
Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
Wahnapitae First Nation -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
New Fibre Installation
Project site 1: Ella Lake -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Wasauksing First Nation - 10 Unit Residential Construction Project
Wasauksing First Nation -
Wasauksing First Nation - Lot Servicing for future houses
Wasauksing First Nation -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
Dock Removal - Georgian Bay Islands National Park
Georgian Bay Islands National Park -
Haileybury Bin Wall Repairs - Summer 2021
Haileybury -
Atikameksheng By-Pass Road Construction - additional Federal Authority
Naughton -
Atikameksheng Anishnawbek First Nation Business Park
Atikameksheng Anishnawbek First Nation -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility Modification to Building Crawl Space
Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility, Rolphton, Ontario -
Canadian Nuclear Laboratories Nuclear Power Demonstration Waste Facility: Modification to Crawl Space
Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility, Rolphton, Ontario -
New Fibre Installation - Kawarta
Project site 5: Kennisis Lake -
Nuclear Power Demonstration Closure Project
Rolphton -
98 Manitoba Street Environmental Remediation
98 Manitoba Street, Bracebridge -
Little Brother Lake Dam Replacement
Trent-Severn Waterway National Historic Site of Canada -
Widjikiwe Gas Bar
Timiskaming -
Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes
Bala -
Soil Remediation at Jannacks Narrows Minor Shore Light, Bala Park Island, Ontario
Jannacks Narrows Minor Shore Light, Ontario -
Wahta Mohawk Housing Subdivision Project
Wahta Mohawk -
Victoria Mine Project
Southwest of Sudbury -
Wahta Mohawks - Waste Transfer Station and Landfill Closure
Wahta Mohawks -
New Fibre Installation
Project Site 03: Muskoka Lake -
Rehabilitation of Algonquin Trail/OVRT
County of Renfrew -
Beaver Creek Institution - Parking Expansion
Beaver Creek Institution -
New Fibre Installation
Project Site 07: Pine Lake -
Replace Culvert on Orange Road, Garrison Petawawa Range and Training Area
Range and Training Area of Garrison Petawawa -
Breaching Range Development in Areas 7 and 8, Range and Training Area, Garrison Petawawa
Range and Training Area, Garrison Petawawa (Area 7) -
New Fibre Installation
Project Site 04: Loon Lake -
Breaching Range Development in Areas 7 and 8, Range and Training Area, Garrison Petawawa
Range and Training Area, Garrison Petawawa (Area 8) -
New Fibre Installation
Project Site 05: Middle Mildrew Lake -
New Fibre Installation
Project Site 10: Silver Lake -
New Fibre Installation
Project Site 06: North Muldrew Lake -
New Fibre Installation
Project Site 11: South Muldrew Lake -
Ontario Waterways, Six Mile Lake Dams Rehabilitation
Trent-Severn Waterway National Historic Site of Canada -
New Fibre Installation - Kawarta
Project site 1: Bob Lake -
Camp Queen Elizabeth Dining Hall and Wellness Cabin Improvement Project, Beausoleil Island
Georgian Bay Islands National Park of Canada -
YMCA Camp Queen Elizabeth Cabin Improvement Project
Georgian Bay Islands National Park -
Canadian Nuclear Laboratories Office Trailer Expansion
Canadian Nuclear Laboratories, Chalk River, Ontario -
Canadian Nuclear Laboratories Upgraded Electrical Services
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Contractor Management Trailer Complex
Canadian Nuclear Laboratories, Chalk River, Ontario -
Canadian Nuclear Laboratories Heel Storage Removal Project
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Intermediate Level Waste Storage Area
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Bulk Storage Laydown Area
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Geotechnical Investigations for a Radioisotope Research and Development Facility
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Service Line Repair Project
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Centralized Laydown Area
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Waste Management Area Office Complex
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Cask Facility Project
Canadian Nuclear Laboratories, Chalk River, Ontario -
Canadian Nuclear Laboratories Multi-Purpose Waste Handling Facility
Chalk River Laboratories, Chalk River On -
Canadian Nuclear Laboratories Fire Alarm Panel Replacement Project
Canadian Nuclear Laboratories, Chalk River, Ontario -
Canadian Nuclear Laboratories Parking Lot Modification Project
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Effluent Monitoring Stations Upgrade Project
Canadian Nuclear Laboratories, Chalk River, Ontario -
Canadian Nuclear Laboratories Covered Structure
Canadian Nuclear Laboratories, Chalk River, Ontario -
Canadian Nuclear Laboratories Access Road Upgrade
Canadian Nuclear Laboratories, Chalk River, Ontario -
Canadian Nuclear Laboratories Waste Management Area Modification Project
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Hydro-vac Dewatering Station
Chalk River Nuclear Laboratories, Chalk River Ontario -
Telecommunications and Carrier Services Main Point of Presence Project
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Geotechnical Investigation Project
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Geotechnical Activities
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Building Demolition Project
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Canadian Nuclear Laboratories Material Pit Expansion Project
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
Modernized Combined Electrolysis and Catalytic Exchange
Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario -
White's Portage Dam Replacement, Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
New Fibre Installation - Kawarta
Project site 4: Drag Lake -
Construction of a New Facility for 2 Service Battalion - Garrison Petawawa
Garrison Petawawa -
Construction of a Fire Access Road - Excalibur Pad- Garrison Petawawa
Garrison Petawawa -
Construction of Wildland Fire Fighting Training Building - Garrison Petawawa
Garrison Petawawa -
Various Culvert Replacements 2022, Range and Training Area - Garrison Petawawa
Garrison Petawawa -
Expansion of Training Centre Infrastructure – Garrison Petawawa
Garrison Petawawa -
Demolition of L-001 and Building L-054- Garrison Petawawa
Garrison Petawawa -
Range and Training Area Culvert Replacements and Maintenance 2023 - Garrison Petawawa
Garrison Petawawa -
Construction of Petawawa Military Family Resource Centre - Garrison Petawawa
Garrison Petawawa -
Construct Canadian Forces Housing Agency Housing Complexes - Garrison Petawawa
Garrison Petawawa -
Private Property boathouse dredge, Severn River, Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Fuel Storage Tank Removal Project
Canadian Nuclear Laboratories Ltd, Chalk River Ontario -
New Fibre Installation
Project Site 01: Bass Lake -
Racehorse Road Repair and Culvert Replacement
Petawawa Research Forest, Chalk River, Ontario -
New Fibre Installation - Kawarta
Project site 2: Minden Lake -
New Fibre Installation
Project Site 02: Kahshe Lake -
YMCA Camp Kitchikewana Pumphouse Replacement Project
Georgian Bay Islands National Park of Canada -
New Fibre Installation
Project site 12: WHITEFISH LAKE INDIAN RESERVE NO. 6 -
County of Renfrew Trail - Garrison Petawawa By-Pass
Pembroke -
Construction of Two Temporary Buildings at Killaloe/Bonnechere Airport, Killaloe, Ontario
Killaloe -
Impeed the Reed
Georgian Bay Islands National Park -
Honey Harbour Parking Lot
Georgian Bay Islands National Park of Canada -
New Fibre Installation
Project Site 12: Sparrow Lake -
Near Surface Disposal Facility Project
Deep River -
Micro Modular Reactor Project
Chalk River -
Long Lake Dam Replacement
Trent-Severn Waterway National Historic Site of Canada -
Tobey Dock Reconstruction
Georgian Bay Islands National Park -
New Fibre Installation
Project Site 08: Riley Lake -
Potential Regional Assessment of Radioactive Waste Disposal in the Ottawa Valley
Ottawa Valley -
Replace Culvert on 'A' Range Road at Tucker Creek, Garrison Petawawa Range and Training Area
Range and Training Area of Garrison Petawawa -
Range and Training Area Various Culvert Replacements, Garrison Petawawa Range and Training Area
Range and Training Area of Garrison Petawawa -
Range and Training Area Various Culvert Replacements 2021, Garrison Petawawa Range and Training Area
Range and Training Area of Garrison Petawawa -
Road Improvement and Construct Breaching Range - Garrison Petawawa
Garrison Petawawa -
Remediation of B, C, D, E, and Y Ranges, Garrison Petawawa Range and Training Area
Range and Training Area of Garrison Petawawa -
New Fibre Installation
Project site 1: Dam Lake -
New Fibre Installation - Kawarta
Project site 3: Little Dudmon Lake -
Construct Communications Tower - Garrison Petawawa
Garrison Petawawa -
New Fibre Installation - Kawarta
Project site 9: Koshlong Lake -
Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 210241, Sparrow Lake, ON
Trent-Severn Waterway National Historic Site -
Septic (Holding Tank) Installation at Port Severn ON Post Office
3280 Port Severn Road South, Port Severn, Ontario -
Perimeter Fence Soil Management Site - Garrison Petawawa
Garrison Petawawa -
Highway 17 Access, Garrison Petawawa
Highway 17, near Garrison Petawawa -
Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200013
Trent-Severn Waterway National Historic Site -
Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200127
Trent-Severn Waterway National Historic Site -
New Fibre Installation
Project Site 09: Severn River - Severn Waterway -
Construct Heavy Equipment (SNIC) parking area near building CC095, Garrison Petawawa Range and Training Area
Project is located on Battle Road within the Garrison of Petawawa -
Install Scavenger Tanks - Garrison Petawawa
Garrison Petawawa -
Couchiching Lock 42 and Bridge 56 Rehabilitation
Trent-Severn Waterway National Historic Site -
Highway 17 Access, Garrison Petawawa
Highway 17, near Garrison Petawawa -
Construction of Security Fence - Garrison Petawawa
Garrison Petawawa -
Remove and Replace Garrison Perimeter Fence - Garrison Petawawa
Garrison Petawawa -
Construct Fleet Storage Facility - Garrison Petawawa
Garrison Petawawa -
Upgrade Storage Tank Systems at Various Locations, Garrison Petawawa
Garrison Petawawa -
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
Logistics/Enhanced Recovery Vehicle and Combined Heavy Construction Equipment Replacement Facility, Garrison Petawawa
Garrison Petawawa -
Land Vehicle Crew Training System, Garrison Petawawa
Garrison Petawawa -
Esson Lake Main dam and Side Dam Replacement
Trent-Severn Waterway National Historic Site of Canada -
Trent-Severn Waterway, Esson Lake Earth Dam Rehabilitation
Trent-Severn Waterway National Historic Site of Canada -
12-Bay Medium Girder Bridge Training Site Improvement & Re-Opening - Garrison Petawawa
Garrison Petawawa -
County of Renfrew Trail - Garrison Petawawa By-Pass
Pembroke -
Construction of Boat Launches- Garrison Petawawa
Garrison Petawawa -
Construct Sidewalks on Montgomery Road Phase 1, Garrison Petawawa
Garrison Petawawa -
Fencing Soil Transfer Site, Garrison Petawawa
Garrison Petawawa -
Extension of Battle Road - Garrison Petawawa
4th Canadian Division Support Base Petawawa -
Replace Culvert on Chalk River Road, Garrison Petawawa Range and Training Area
Range and Training Area of Garrison Petawawa -
Demolition of aged Royal Canadian Dragoon facilities at Garrison Petawawa
Garrison Petawawa -
Storage Tank Installation, Garrison Petawawa
POL Waste Storage Facility 184 Pashmul Road Unit D-106, Garrison Petawawa -
Demolition of Building H-035 - Garrison Petawawa
Garrison Petawawa -
New Server Building - Garrison Petawawa
Garrison Petawawa -
Rehabilitation of Algonquin Trail/OVRT
County of Renfrew -
Construction of Menin/Montgomery Roundabout- Garrison Petawawa
Garrison Petawawa -
Upgrade Communication Ducts - Garrison Petawawa
Garrison Petawawa -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation
Beausoleil First Nation Reserve -
Construct Sidewalk on Somme Road - Garrison Petawawa
Garrison Petawawa -
Repave Various Roads - Garrison Petawawa
Garrison Petawawa -
Demolition of Health Services Building N-109 and Building M-012 - Garrison Petawawa
Garrison Petawawa -
Parking Lot Replacement- Canadian Forces Housing Agency, Garrison Petawawa
Garrison Petawawa -
Gull River Dam 2 Repair, TSW, Minden Hills, Ontario
Trent-Severn Waterway National Historic Site of Canada -
Petawawa Post Office Expansion
3422 Petawawa Boulevard, Petawawa -
New Fibre Installation
Project site: Various parts of Ontario -
New Fibre Installation
Project site 04: WHITEFISH RIVER INDIAN RESERVE NO. 4 -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Roadwork within Residential Housing Units of the South Townsite - Garrison Petawawa
Garrison Petawawa -
Whitefish River First Nation - Waste Transfer Station Construction and Landfill Closure
Whitefish River First Nation -
South Townsite Roads and Utilities Upgrades (Phase 12) - Garrison Petawawa
Garrison Petawawa -
Dockside Dredge Trent-Severn In-Water and Shoreline Works Permit 190113
Trent-Severn Waterway National Historic Site -
Resurface & Upgrade Paths to Improve Accessibility - Wye Marsh National Wildlife Area
Wye Marsh National Wildlife Area -
Rebuild Raptor Enclosure Structure - Wye Marsh National Wildlife Area
Wye Marsh National Wildlife Area -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
New Fibre Installation
Project site 2: Madawaska River -
15 Lot Subdivision Expansion- Whitefish River First Nation
Whitefish River First Nation -
WRFN Septic Bed Assessment/Replacement Program
WRFN Septic Bed Assessment/Replacement Program -
New Fibre Installation
Project site 05: WIKWEMIKONG UNCEDED RESERVE -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
Wikwemikong First Nation - Elders Home Redevelopment
Wikwemikong First Nation -
Wikwemikong First Nation - Lot Servicing
Wikwemikong Unceded Territory -
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
Chippewas of Rama - Landfill Decommissioning/Transfer Station Construction
Chippewas of Rama -
Shilling Subdivision Chippewas of Rama First Nation
Chippewas of Rama First Nation -
New Fibre Installation
Project site 11: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 06: WIKWEMIKONG UNCEDED RESERVE -
Construction of the Arctic Over-the-Horizon Radar (A-OTHR) Capability at 0 Thistle Trail, Kirkfield, Ontario
0 Thistle Trail, Kirkfield -
Algonquins of Pikwakanagan - Water Supply and Treatment System
Algonquins of Pikwakanagan First Nation, Ontario -
Construction of the Algonquins of Pikwakanagan Communal Treatment System
Construction of the Algonquins of Pikwakanagan Communal Treatment System -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Algonquins of Pikwàkanagàn First Nation
Algonquins of Pikwàkanagàn First Nation -
New Fibre Installation - Kawarta
Project site 7: Four Mile Lake -
Child & Family Well-Being Centre
Pikwakanagan -
Private Property dock side dredge Balsam Lake Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Dyer's Bay Small Craft Harbour - Wharf Repair
Dyer's Bay -
Beaver Creek Institution - New/Existing Pump Station Upgrade
Beaver Creek -
Chippewas of Nawash Lot Servicing
Chippewas of Nawash First Nation -
Ontario Waterways-Trent-Severn Waterway Kirkfield Shops Expansion
Trent-Severn Waterway National Historic Site -
Chippewas of Nawash Multi-use Building
Chippewas of Nawash First Nation -
Private Resident - Shoreline Stabilization
Trent-Severn Waterway National Historic Site of Canada -
New Fibre Installation
Project site 17: Sheguandah Indian Reserve No.24 -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Chippewas of Nawash Community Centre Renovations and Additions
Neyaashiinigmiing Reserve No. 27 -
Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 190274
Trent-Severn Waterway National Historic Site -
Shaw Farm Decommission
Bruce Peninsula National Park of Canada -
Gima Kwe Nong Parking Area
Bruce Peninsula National Park of Canada -
Gima Kwe Nong Dock Replacement
Bruce Peninsula National Park -
New Fibre Installation - Kawarta
Project site 8: Burnt River -
New Fibre Installation - Kawarta
Project site 6: Mitchell Lake -
New Fibre Installation
Project site 18: Sucker Creek Indian Reserve No.23 -
New Fibre Installation
Project site 10: WIKWEMIKONG UNCEDED RESERVE -
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
Hidden Valley Road Box Culvert
Bruce Peninsula National Park