Meanook National Wildlife Area Buildings Demolition
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Canadian Wildlife Service is proposing to undertake the demolition of nine buildings located in the Meanook National Wildlife Area.
Seven of the nine buildings contain asbestos in the building materials, which will require abatement. The buildings range in footprint from 18 m2 to 142 m2 and were constructed circa 1948-1962. The heritage value of the buildings has been assessed and none have been designated. A contract is being tendered for the demolition of six buildings over three years, in 2020, 2021, and 2022 respectively. Demolition of the remaining three buildings, and thus project completion, is anticipated by 2026. Demolition and abatement of harmful substances (e.g. lead paint, asbestos) will be completed by qualified contractors. Consideration for the introduction of invasive weeds will be incorporated into the contract (e.g. cleaning equipment, clean sources of soil for infilling), and monitoring and spot-treatment of weeds at former building sites will be incorporated into management planning for the site. Demolition will take place outside of the breeding bird season for migratory birds and the maternity roosting period for bats. If bats do use the buildings as maternity roosts, bat houses are available on-site as alternative roosts. All debris and waste will be removed from the project site. Disturbed areas will be restored to a predetermined condition (backfilled, graded, and a layer of topsoil to allow for vegetation growth) and all necessary measures to address potential erosion will be employed.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination - Buildings Demolition | PDF (387 KB) | September 13, 2020 |
Contacts
Sean LeMoineThe Canadian Wildlife Service
Sean LeMoine, Protected Areas Specialist
9250 - 49th Street NW
Edmonton, Alberta T6B 1K5
Telephone: 902-830-8014
Email: sean.lemoine@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Meanook National Wildlife Area (Alberta)
-
Nature of Activity
- Building and Property Development
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2020-08-12 -
Proponent
Canadian Wildlife Service -
Authorities
- Environment and Climate Change Canada
-
Assessment Type
Project on federal lands -
Reference Number
80923
Nearby assessments
...within 200 kilometres-
Bigstone Health Centre
Bigstone Cree Nation -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 3: Kikino Metis Settlement -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 2: Kikino Metis Settlement -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construct a new Mock Jump Tower training facility – Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 1: Kikino Metis Settlement -
Beacon AI Centers Heartland Project
Sturgeon County, about 7 kilometres east of Gibbons -
Greenlight Electricity Centre Project
10 km east of Gibbons, Sturgeon County -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Cando Sturgeon Rail Terminal West Expansion Project
Sturgeon County -
Redwater Facility Rail Yard Project
Near Redwater -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Beaver Lake Cree Nation Medical Center
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Water Treatment Plant
Beaver Lake Cree Nation -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Notice of Intent to Make a Determination - Start of Public Comment Period (TELUS Communications Inc (AB103721) Beaver Lake Indian Reserve No. 131 )
AB103721 - Beaver Lake Indian Reserve No. 131 -
Beaver Lake Cree Nation Telus Telecommunications Tower
Beaver Lake Cree Nation -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Alexander First Nation: BF 77352 Replacement and Twp Rd 562 Improvements
Alexander First Nation -
Josephburg Condensate Fractionation Project
22 kilometres northeast of Edmonton -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Alexander First Nation - Big Hills Estate Subdivision
Big Hills Estate Subdivision -
Alexander First Nation Mamawatoskewin Prevention Building
Alexander First Nation -
Alexander Wastewater System Upgrades
West Lift Station -
Alexander Wastewater System Upgrades
East Lift Station -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Lamont Railcar Storage Project
Northwest of Lamont -
Alexander Wastewater System Upgrades
Sewage Lagoon Rehab and Addition -
Alexander Wastewater System Upgrades
Biofilter Wetland System -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construct Land Vehicle Crew Training System Facility- 3rd Canadian Division Support Base Edmonton
3 Canadian Division Support Base (CDSB) Edmonton -
Skate Park Expansion - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Base Edmonton -
Design and Construct Armored Combat Support Vehicle (ACSV) Facility- 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Construct Transition Centre - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construction of the Strategic Tanker Transport Capability, Main Operating Base (West), Alberta
Main Operating Base (West) - Edmonton -
Repair Normandy Road - Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Design and Construct Dry Gap Bridge Training Aide, Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Canadian Forces Base (CFB) Edmonton Garrison Spray Park and Playground Construction
Edmonton garrison -
Construction of Canadian Forces Housing Agency (CFHA) Apartments, Row Houses, Duplexes, Access Roads and Site Services, 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Whitefish Lake First Nation Subdivision Lot Development
Whitefish Lake First Nation #128 -
Culvert Clearing
Elk Island National Park -
Decoy Beaver Dam Pilot Project for Beaver Coexistence Management
Elk Island National Park of Canada -
Sawridge Band Solar Farm Project
Sawridge Band -
New Fibre Installation
Project Site 2: Sawridge No. 150G -
Astotin Lake Dock Replacement
Elk Island National Park -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Pedestrian Bridge Replacement on Simmons Trail
Elk Island National Park -
New Fibre Installation
Project Site 1: Sawridge No. 150G -
New Fibre Installation - Slave Lake
Project Site 1: Slave Lake -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
Waheeba Solar Energy Project
Alexis First Nation -
Trans Mountain Expansion Project
Edmonton -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Base Line Terminal Project
Edmonton -
New Fibre Installation - Slave Lake
Project Site 2: Slave Lake -
Xplornet Telecommunications Tower Project
Alberta Beach -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Sawridge First Nation - 2 Single Houses Project - 2025-2026
Sawridge First Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Alexis Gas Distribution to New Town Subdivision (30 Lots) Project
Alexis Nakota Sioux Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake Water Treatment Plant and Intake Design
Heart Lake First Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Heart Lake First Nation - Lift Station Replacement and Sanitary Sewer Line Install
Heart Lake First Nation -
Heart Lake 3-Phase Powerline (Fortis# 500111166)
Heart Lake First Nation -
Heart Lake ATCO Gas Distribution Project
Heart Lake First Nation -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
New Fibre Installation
Project Site 2 - Heart Lake: -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
Enoch Cree Nation ATCO 1121399 Removal Phase 3 Project
Enoch Cree Nation -
Heart Lake First Nation - ATCO Gas Main Installation
Heart Lake First Nation -
Enoch Nation Embers Addition to River Cree Casino & Hotel
Enoch Cree Nation -
ATCO Removal of 1 km of 42 mm Pipeline on Enoch Cree Nation Phase 2
Enoch Cree Nation -
ATCO Removal of 35m 42.2 mm Transmission Line on Enoch Cree Nation
Enoch Cree Nation -
Enoch River Cree Hotel Expansion
Enoch Cree Nation -
ATCO Gate Station Project
ATCO Gate Station -
Enoch Cree Nation Medical Treatment Centre Project
Enoch Cree Nation -
ATCO Gas Main Installation for NEDA Commercial Stage 1, Millennium Phase 1, and Community Recovery Center
Enoch Cree Nation -
Enoch Cree Nation 2 Unit Housing Project
Enoch Cree Nation -
Enoch Cree Nation ATCO PMR Maskekoshihk Phases 7-9
Enoch Cree Nation -
Enoch Village Water and Wastewater Rehabilitation
Enoch Cree Nation -
Enoch Cree Nation mnn Childhood Family Services Administration Building Project
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Alexander First Nation CU360 Drinking Water Supply Project
Alexander First Nation -
RHI 20 Unit Subdivision
Enoch Cree Nation -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Enoch Recovery Center Project
Enoch Cree Nation -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Saddle Lake Cree Nation Pathway to Learning
Saddle Lake Cree Nation -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Townsite Pumphouse Project
Townsite Pumphouse -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Pathway to Learning
Saddle Lake No. 125 -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Alexander First Nation Campground Project
Alexander First Nation -
Regional Assessment of Beaver Lake Cree Nation's Asserted Traditional Territory
Lac la Biche -
Paul First Nation 2-unit Housing Project
Paul First Nation -
Paul First Nation CFS Admin Building
Paul First Nation -
Paul First Nation Driveway Repairs Project
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
New Fibre Installation
Saddle Lake 125 -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Paul First Nation Culvert Replacement Project
Paul First Nation -
ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
New Fibre Installation
Project Site 5 - Wabasca No. 166: -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
ATCO Gas and Pipelines Ltd.: 1088866 Bigstone Cree Nation & Hamlet of Sandy Lake Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
Black Bear Power Plant Project
Swan Hills -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Paul First Nation Solar Energy Project Interconnection Line
Paul First Nation -
Paul First Nation Solar Project
Paul First Nation -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 1 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 2 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 4 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 3 -
Enoch ATCO Plastic Mains Replacement Project
Enoch Cree Nation -
Bigstone Cree Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation: Maskotehk Flood Mitigation Upgrades at Cattleman Drive & Cee Too Drive
Wabasca IR 166D -
Sundance 7 Generating Station Project
Wabamun -
Maskotehk Flood Mitigation Upgrades - Borrow Pits
Wabasca 166D -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
New Fibre Installation
Project Site 4 - Wabasca No. 166D: -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
Reservoir 1 Gravel Road Construction and Parking Lot Regrading at Edmonton International Airport
Edmonton International Airport -
Value Park Pavement at the Edmonton International Airport
Edmonton Regional Airports Authority -
New Hotel Development at Edmonton International Airport
Edmonton International Airport -
Sanitary Mainline, Manhole, Waterline and Valve Repairs and Replacement at Edmonton International Airport
Edmonton International Airport -
AirPoint 2 Development at the Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Taxiway B4 Pavement Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Quick Park Improvements at Edmonton International Airport
Edmonton International Airport -
Cold Storage Facility Construction at Edmonton International Airport
Edmonton International Airport -
Arrivals Level Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
North Tower Expansion at Edmonton International Airport
Edmonton International Airport -
Airside Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
New Fibre Installation
Project Site 1 - Bigstone Cree Nation: -
166D Pumphouse Upgrades
166D Pumphouse Upgrade -
Bigstone Cree Nation Temporary Modular Office Complex
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
APEX Utilities Inc. - Opasikoniwew Housing Authority: Hoole Creek Road Subdivision Phase 2 Gasification Project
Wabasca -
Hoole Creek Road Subdivision Apex Utilities
Wabasca 166A -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Frog Lake First Nation Askiy Hemp Limited Partnership Project
Frog Lake First Nation -
New Fibre Installation
Project Site 2 - Wabasca No. 166B : -
New Fibre Installation
Swan River 150E -
Swan River 32 Lot West Subdivision Project
Swan River First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
Swan River First Nation: Wastewater Lagoon Liner Repair & Sub-liner Drainage Installation
Swan River First Nation -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
Ryley Biomedical Waste Incinerator Project
Ryley -
Swan River First Nation Lakefront Development Project
Lesser Slave Lake -
Ryley Facility Expansion Project
Ryley -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
Moraine Power Generation Project
Whitecourt -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Kehewin 123 -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Genesee Generating Station Expansion Project
Near Warburg -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
New Fibre Installation
Project Site 3 - Wabasca No. 166C: -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
Telus telecommunications tower located on Kehewin Cree Nation located south of Bonnyville, AB
Telus telecommunications tower located on Kehewin Cree Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Cree Nation Telus Tower AB103726
Kehewin Cree Nation -
OS -7254 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad - Public Comments Invited
Kehewin Cree Nation -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Underground CO2 Storage Hub -
Driftpile Cree Nation Lagoon Reclamation
Driftpile Cree Nation -
Chief Kinosew Awasak Mikiwahp Community Subdivision Development
Driftpile River IR No. 150 -
DCN 2023 Rapid Housing Project
DCN 2023 Rapid Housing Project -
Driftpile Cree Nation Gas Line Connector Project
Driftpile Cree Nation -
Driftpile Health Centre
Driftpile Cree Nation -
Driftpile Cree Nation antenna supporting structure located on the Driftpile Cree Nation in the Municipal District of Big Lakes.
Driftpile Cree Nation antenna supporting structure -
Driftpile Cree Nation Lift Station No. 1 Replacement Project
Driftpile Cree Nation -
Driftpile Cree Nation Housing Project
Driftpile Cree Nation -
Driftpile Cree Nation New Housing Construction Project
Driftpile, AB -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta
Cenovus Foster Creek - North Trunk Gate (NTG) -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
Joussard Harbour Alberta - Routine Maintenance Dredging of the Joussard Harbour at Lesser Slave Lake Alberta - over the next year
Joussard Harbour -
New Fibre Installation
Pigeon Lake 138A, Elk Island National Park -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 1: Louis Bull 138B -
Louis Bull Water Treatment Plant Upgrades
Louis Bull Tribe -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Ermineskin Drainage Improvements (Culvert Replacement - Small Boy Road, Buffalo Avenue, 3 Mile Road) Project
Ermineskin Cree Nation -
Sucker Creek Housing Project 2020 (4 Units)
Sucker Creek First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 2: Ermineskin 138 -
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land, near Maskwacis, AB.
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
OS-7263 Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell oil pad
Frog Lake First Nation -
OS-7264 Authorization to Construct and Operate a Surface Lease for multiwell oil pad
Frog Lake First Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Upgrade (Multiple) Tower
Project Site 2: Sucker Creek FN 150A -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation