Sundog Renewable Generating Station Project
Sundog RGS GP Inc., a wholly owned subsidiary of Innergex Renewable Energy Inc., is proposing the construction and operation of a run-of river hydroelectric facility on the Athabasca River located approximately 130 kilometres upstream of Fort McMurray, Alberta. The proposed Sundog Renewable Generating Station Project would have a generating capacity of 135 megawatts. Components would include a new 240 kilovolt transmission line, a spillway to increase the water level in the river, a powerhouse, in-river embankment structures, boat launches, access roads, and ramp fishways.
Latest update
Participate
Contacts
Impact Assessment Agency of Canada160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- 130 kilometres upstream of Fort McMurray (Alberta)
-
Nature of Activity
- Hydroelectric Energy
-
Assessment Status
Terminated -
Start Date
2018-01-10 -
Proponent
Sundog RGS GP Inc. -
Authorities
- Canadian Environmental Assessment Agency
-
Assessment Type
Environmental assessment under CEAA 2012 -
Reference Number
80146
Nearby assessments
...within 200 kilometres-
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
New Fibre Installation
Project Site 5 - Wabasca No. 166: -
ATCO Gas and Pipelines Ltd.: 1088866 Bigstone Cree Nation & Hamlet of Sandy Lake Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Hoole Creek Road Subdivision Apex Utilities
Wabasca 166A -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
APEX Utilities Inc. - Opasikoniwew Housing Authority: Hoole Creek Road Subdivision Phase 2 Gasification Project
Wabasca -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
Bigstone Cree Nation Temporary Modular Office Complex
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
New Fibre Installation
Project Site 1 - Bigstone Cree Nation: -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
New Fibre Installation
Project Site 3 - Wabasca No. 166C: -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
Maskotehk Flood Mitigation Upgrades - Borrow Pits
Wabasca 166D -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
New Fibre Installation
Project Site 2 - Wabasca No. 166B : -
New Fibre Installation
Project Site 4 - Wabasca No. 166D: -
Bigstone Cree Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
166D Pumphouse Upgrades
166D Pumphouse Upgrade -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176 -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176A -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
Bigstone Health Centre
Bigstone Cree Nation -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Main Transportation Pipeline -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Peerless Housing CMHC Site 2
Peerless Trout IR No. 238 -
Peerless CMHC Housing PTFN Camp Area
Peerless Trout IR No. 238 -
0861 - Upgrade (33 & 48 - 60mm) North Janvier
Janvier -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
1121393 - 0861 - SubD(13RUP) CPFN Janvier - Phase 2
Janvier -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Trout Lake Daycare
Peerless Trout IR No. 238 -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake) -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
Regional Assessment of Beaver Lake Cree Nation's Asserted Traditional Territory
Lac la Biche -
Heart Lake First Nation - ATCO Gas Main Installation
Heart Lake First Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake ATCO Gas Distribution Project
Heart Lake First Nation -
Heart Lake First Nation - Lift Station Replacement and Sanitary Sewer Line Install
Heart Lake First Nation -
Heart Lake 3-Phase Powerline (Fortis# 500111166)
Heart Lake First Nation -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
New Fibre Installation
Project Site 2 - Heart Lake: -
Heart Lake Water Treatment Plant and Intake Design
Heart Lake First Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Carbon Capture Infrastructure and Lateral Pipelines -
North Corridor Expansion Project
Peerless Lake -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
New Fibre Installation
Project Site 2: Sawridge No. 150G -
Sawridge Band Solar Farm Project
Sawridge Band -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Beaver Lake Cree Nation Water Treatment Plant
Beaver Lake Cree Nation -
Jackpine Mine Expansion Project
Fort McKay -
Beaver Lake Cree Nation Medical Center
Beaver Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Notice of Intent to Make a Determination - Start of Public Comment Period (TELUS Communications Inc (AB103721) Beaver Lake Indian Reserve No. 131 )
AB103721 - Beaver Lake Indian Reserve No. 131 -
New Fibre Installation
Project Site 1: Sawridge No. 150G -
Beaver Lake Cree Nation Telus Telecommunications Tower
Beaver Lake Cree Nation -
New Fibre Installation - Slave Lake
Project Site 1: Slave Lake -
Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta
Cenovus Foster Creek - North Trunk Gate (NTG) -
New Fibre Installation - Slave Lake
Project Site 2: Slave Lake -
Sawridge First Nation - 2 Single Houses Project - 2025-2026
Sawridge First Nation -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 3: Kikino Metis Settlement -
Loon River First: Nation Industrial Park Warehouse
Loon River First Nation -
Loon River First Nation: CU344 Main Access Road Upgrade Project
Loon River First Nation -
Loon River First Nation North Central Corridor Loop Temporary Contractor Yard
Loon River First Nation -
Pierre River Mine Project
Fort McKay -
Loon River Cree Nation Borrow Pit Project
Loon River Cree Nation -
Loon River First Nation Wastewater Treatment Facility Upgrade and Expansion
Loon River First Nation -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 2: Kikino Metis Settlement -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Loon River First Nation Water Treatment Plant Upgrades Design Construction
Loon River First Nation -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Loon River First Nation: CU363 Emergency Wastewater System Repairs
Loon River First Nation -
Loon River First Nation: CU350 BF 78716 Bridge Replacement over Loon River
Loon River First Nation -
Loon River Cree Nation Pure Fibre Network Project
Loon River Cree Nation -
Loon River First Nation: Industrial Park Grocery Store
Loon River Cree Nation -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Loon River First Nation: Community Infrastructure Head Start Building
Loon River First Nation -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Frontier Oil Sands Mine Project
Fort McKay -
North Corridor Expansion Project
Highway 88 -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 1: Kikino Metis Settlement -
Atikameg Healing Shelter for Women and Children
Whitefish Lake First Nation -
Whitefish Lake First Nation Atikameg CFS Family Preservation and Prevention Building
Whitefish Lake First Nation -
Whitefish Lake First Nation: Atikameg Child & Family Services Administration Building
Whitefish Lake First Nation -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 4: Utikoomak Lake -
Whitefish Lake Fire Guard Project
Whitefish Lake First Nation 155 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Armand Bekkattla Treatment Centre Recapitalization and Expansion
Clearwater River Dene Band 222 -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
New Fibre Installation
Swan River 150E -
La Loche Hotel
La Loche -
Swan River First Nation: Wastewater Lagoon Liner Repair & Sub-liner Drainage Installation
Swan River First Nation