Esk'etemc-Alkali Lake IR1 Wastewater Upgrades project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Project description:
Esk'etemc community members living in Alkali Lake IR#1 have been experiencing failed wastewater ground discharge systems
that continue to pose health and safety risks to the community members and their families. Thus, a feasibility study was
undertaken to determine the most effective means of collecting, treating and disposing of sanitary wastewater from the
community. The study concluded that, due to the urgency of the need for septic repairs, a comprehensive assessment of each
existing system in the community be completed to start the repair/replacement process. This will take place within Alkali Lake
IR which is located near a small creek, and grassland terrestrial habitat. Repair will require unearthing of the existing septic
tanks and potential replacement as well as soil pit tests and peculation tests.
Water Bodies / Navigable Waters:
No works will occur within Alkali creek, the nearest septic field due for maintenance is approximately 30 meters away based on
Google Earth estimates.
Vegetation:
No Vegetation species at risk are expected to be impacted by the proposed works associated with this project.
Birds:
Consultant has provided list of species of concern and suggested mitigation measures.
Terrestrial Wildlife:
The project site is located within Critical Habitat for the American Badger (Taxidea taxus jeffersonii).
Fish / Aquatic Wildlife:
No Fish/Aquatic life is expected to be impacted by the proposed works associated with this project. Works will occur outside of
any water body.
Other:
11 Contaminated sites exist within Alkali Lake IR1 works on this project are not anticipated to disturb the contaminated sites as all works will occur on pre-disturbed sites (existing septic fields).
In addition, an archaeological site exists approximately 500 meters from the nearest existing septic field, works are not expected to affect this site due to the distance between the project site and the archaeological site and again, that works will only occur on pre-disturbed areas.
Mitigation measures to be implemented as described in the review.
Latest update
- is not likely to cause significant adverse environmental effects.
Participate
Contacts
Indigenous Services CanadaFasih Siddiqui, Senior Engineer
1138 Melville Street
Vancouver, British Columbia V6E 4S3
Telephone: 604-376-0802
Fax: 604-775-7149
Email: Fasih.Siddiqui@sac-isc.gc.ca
-
Location
- Esk'etemc, Alkali Lake IR 1 (British Columbia)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2023-10-04 -
Proponent
Esk'etemc First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
85984
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
New Telus Communications Inc. Telecommunication Tower Project in Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands
Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands -
Esk'etemc First Nation - Telus Telecommunications Tower - Alkali Lake
Esk'etemc First Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Nazco 20 -
Esk'Etemc First Nation Road and Drainage Improvements (Alkali Lake)
Alkali Lake 1; Swan Lake 3; and Alkali Lake 4A -
Timber Harvesting on Pete Suckers IR 13
Pete Suckers IR 13 -
New Telus Communications Inc. Telecommunication Tower Project in Dog Creek 1 Reserve on Stswecem'c Xget'tem Nation Lands
Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Dog Creek
Stswecem'c Xgat'tem First Nation -
Revision to the Posting for IAA Reference Number 85748 (Dog Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands.
Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands. -
Telus Communications Inc., new radiocommunications tower (BC105333) on Toosey I.R. No. 1, near Riske Creek, BC.
BC105333 - Toosey I.R. No. 1 -
Toosey First Nation - Telus Telecommunications Tower - Riske Creek
Toosey First Nation -
Construction of a Cattle Exclusion Snake Fence - 3rd Canadian Division Support Base
3rd Canadian Division Support Base -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Canoe Creek/Meadow Lake
Stswecem'c Xget'tem First Nation -
Revision to the Posting for IAA Reference Number 85749 (Canoe Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
New Telus Communications Inc. Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest Lot 7741
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest Lot 7741 -
Williams Lake First Nation Community Playground Project
Williams Lake First Nation Community Playground Project -
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest
Lot 7741 -
New Fibre Installation
Canoe Creek IR#2 -
New Fibre Installation
James Louie 3A Reserve (Williams Lake First Nation) -
Yunesit'in - Arena Roof and Changeroom Project
Stone IR#1 -
Timber harvesting on ANAHIMS FLAT 1
ANAHIMS FLAT 1 -
Anaham Meadows Upper Diversion Repair
T'letinqox Government IR2 and IR2A -
Prosperity Gold-Copper Mine Project
Fish Lake -
New Prosperity Gold-Copper Mine Project
Fish Lake -
Spanish Mountain Gold Project
70 kilometres northeast of Williams Lake -
Spanish Mountain Gold Mine Project
70 kilometres northeast of Williams Lake -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Xeni Gwet'in Tanakut Waterline Extension
Xeni Gwet'in Lohbiee IR3 and Tanakut IR4 -
New Fibre Installation
Michelle Gardens IR 36 -
AIB reservoir Construction
Ashcroft -
Aggregate Pit Tsideldel First Nation
Redstone Flat 1 -
Telus Communications Inc., new radiocommunications tower (BC112314) at Redstone Flat I.R. No. 1.
BC112314 - Redstone -
Tsideldel First Nation - Telus Telecommunications Tower - Redstone Flat
Tsideldel First Nation -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Lhtako Dene Nation - George Longe Memorial Park Development
Quesnel 1 -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
N'Quatqua Watermain Extension and Phase 1 Subdivision
N'Quatqua IR#1 -
N'Quatqua-Wastewater and Sludge Management
07991 - NEQUATQUE 1-75805CLSRBC / 75667CLSRBC -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Alkali Lake 1 -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Lílwat Nation: Xetólacw Village Road Resurfacing
Xetólacw Village where works are planned to occur is located roughly 5 km east of Mount Currie Village on IR #6. -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
(Lil'wat IR# 10) Poleyard Dike Improvements along Birkenhead River
Lil'wat IR#10 -
Timber harvesting on MOUNT CURRIE 6
Mount Currie 6 -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Harper Creek Mine Project
Vavenby -
North Thompson Rail Terminal Development Project
Kamloops -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
New Fibre Installation
TteS West Tkemlups -
Ajax Mine Project
Kamloops -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Samahquam-Wastewater System and Sludge Management
Samahquam First Nation, 08041 - Q'ALATKU7EM